Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

PM-21 Bypass Service Connection Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Three Valleys Municipal Water District is planning the PM-21 Bypass Service Connection Project in Claremont, California. This initiative involves the installation of a 24 inch bypass connection to the Metropolitan Water District's Rialto Pipeline, which will serve as a backup to the existing 42 inch connection located at the District's headquarters. The project scope includes the installation of approximately 30 to 40 feet of new pipeline within a landscaped median situated between the District's Access Road and East Miramar Avenue. This forecast is managed by the General Manager and Chief Engineer, Matthew H. Litchfield.

General Info

Three Valleys Municipal Water District installing 24-inch bypass connection in Claremont, California.

Agency

California → Three Valleys Municipal Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

between East Miramar Avenue and the District’s Access Road, Claremont, CA

Set-Aside

NONE

Documents

(1)

PM-21 Bypass Service Connection Project - Notice of Exemption Filing

PDF3 pagesother

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Three Valleys Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Three Valleys Municipal Water District
Office AddressN/A
Contacts
Matthew H. LitchfieldGeneral Manager/Chief Engineer

Full Description

Show more
The Three Valleys Municipal Water District proposes to install a 24" Bypass connection with the Metropolitan Water District’s Rialto Pipeline as a backup to the existing 42" connection at the District’s Headquarters in the City of Claremont. This will consist of an approximate 30-40 feet of new pipeline in a landscaped median between East Miramar Avenue and the District’s Access Road.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities, draining of multiple lagoons and ponds, and the construction of a new headworks facility featuring a mechanical chain and rack bar screen. Key upgrades include a new influent eccentric manhole, flow meter vault, replacement of influent pumps and surface aerators, and the installation of a sludge dewatering pipeline with a trailer-mounted pump system. The scope of work further extends to the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. Additionally, the project requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing and earthwork. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across multiple NAICS codes, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project is a construction solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California for work located in Highland, California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, and associated pipe fittings. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The contract also covers electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises, with specific support offered to M/W/DBE subcontractors for bonding, insurance, and materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS