Pocket Canyon Slip Out Repair DO (EA 3X570)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pocket Canyon Slip Out Repair project, identified as solicitation 3X570, is a Caltrans District 4 initiative aimed at repairing roadway embankment instability on eastbound SR-116 in Sonoma County at post mile 15.40. The project was necessitated by a large storm event that caused soil erosion, displacement, and roadway collapse, compounded by a tree stump undermining the slope toe. The technical scope of work includes the installation of a 35-foot-long interlocking sheet pile wall, positioned nine feet outside the fog line, with a total height of approximately 35 feet. To stabilize the area, the space behind the wall will be backfilled with cellular concrete, followed by the placement of imported borrow compacted to a minimum of 90% relative compaction. Additional construction requirements include the installation of cable railing for pedestrian safety and the implementation of necessary traffic control measures. Environmental compliance is a key component of this project, which has been classified as categorically exempt under PRC 21084 and 14 CCR 15301 Class 1(d) due to no anticipated environmental impacts. A biological monitor is required to be present for the duration of all construction activities to ensure adherence to environmental standards. While the project documentation provides a detailed technical statement of work and identifies the Caltrans District 4 Office of Maintenance Environmental as the procuring office, specific financial details such as the estimated contract value, pricing schedules, and contract type are not provided in the current forecast. The project is managed by Senior Environmental Scientist Juliane Smith.

General Info

Caltrans District 4 will repair SR-116 embankment instability using sheet pile walls.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Pocket Canyon Slip Out Repair DO 3X570

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes repairing slip outs near Pocket Canyon on eastbound SR-116 in Sonoma County at post mile 15.40. The slip outs occurred during a large storm event, which caused erosion and displacement of soil, and led to instability and collapse of the roadway embankment. There is also a tree stump lodged at the southern edge of the creek path, which has undermined the toe of slope below the roadway. A 35-foot-long interlocking sheet pile wall will be installed nine feet outside of the fog line. The height of the sheet pile wall will be about 35-feet, including the embankment depth. The tope of the wall will be flush with the slope embankment. The area behind the sheet pile wall will be backfilled with cellular concrete non-standard special provision. Imported borrow will be placed over the cellular concrete and compacted to a minimum of 90% relative compaction. Cable railing will be constructed to protect pedestrians. Traffic control will be required during construction activities. A biological monitor will be present for all construction activities.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS