Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pocket Canyon Slip Out Repair DO (EA 3X570)

Forecast
3X570State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pocket Canyon Slip Out Repair project, identified as solicitation 3X570, is a Caltrans District 4 initiative aimed at repairing roadway embankment instability on eastbound SR-116 in Sonoma County at post mile 15.40. The project was necessitated by a large storm event that caused soil erosion, displacement, and roadway collapse, compounded by a tree stump undermining the slope toe. The technical scope of work includes the installation of a 35-foot-long interlocking sheet pile wall, positioned nine feet outside the fog line, with a total height of approximately 35 feet. To stabilize the area, the space behind the wall will be backfilled with cellular concrete, followed by the placement of imported borrow compacted to a minimum of 90% relative compaction. Additional construction requirements include the installation of cable railing for pedestrian safety and the implementation of necessary traffic control measures. Environmental compliance is a key component of this project, which has been classified as categorically exempt under PRC 21084 and 14 CCR 15301 Class 1(d) due to no anticipated environmental impacts. A biological monitor is required to be present for the duration of all construction activities to ensure adherence to environmental standards. While the project documentation provides a detailed technical statement of work and identifies the Caltrans District 4 Office of Maintenance Environmental as the procuring office, specific financial details such as the estimated contract value, pricing schedules, and contract type are not provided in the current forecast. The project is managed by Senior Environmental Scientist Juliane Smith.

General Info

Caltrans District 4 will repair SR-116 embankment instability using sheet pile walls.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A

Full Description

Show more
Caltrans proposes repairing slip outs near Pocket Canyon on eastbound SR-116 in Sonoma County at post mile 15.40. The slip outs occurred during a large storm event, which caused erosion and displacement of soil, and led to instability and collapse of the roadway embankment. There is also a tree stump lodged at the southern edge of the creek path, which has undermined the toe of slope below the roadway. A 35-foot-long interlocking sheet pile wall will be installed nine feet outside of the fog line. The height of the sheet pile wall will be about 35-feet, including the embankment depth. The tope of the wall will be flush with the slope embankment. The area behind the sheet pile wall will be backfilled with cellular concrete non-standard special provision. Imported borrow will be placed over the cellular concrete and compacted to a minimum of 90% relative compaction. Cable railing will be constructed to protect pedestrians. Traffic control will be required during construction activities. A biological monitor will be present for all construction activities.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
2027030
Solicitation # 2027030
Spartanburg County Government is soliciting proposals for the New Cut Road Intersection Improvements at Mount Zion and Blackstock Roads under RFP 2027030. The project involves comprehensive roadway realignment and infrastructure updates, including grading, drainage installation, and the application of hot mix asphalt surface and intermediate courses. All construction must adhere to the latest SCDOT Standard Specifications and Drawings, with specific requirements for thermoplastic pavement markings and strict compliance with the Manual on Uniform Traffic Devices and the SCDOT Work Zone Traffic Control Manual. The project has a specified completion deadline of October 31, 2027, and requires the prime contractor to be SCDOT approved. The contract will be awarded to the responsive and responsible proposer based on a weighted evaluation of cost at 80 percent and compliance with proposal requirements at 20 percent. This is a unit price bid covering all labor, materials, and equipment. Selected contractors must provide a one-year written warranty for materials and workmanship and maintain insurance as required by the county. Administrative terms include a 60-day proposal validity period, a drug-free workplace requirement per South Carolina law, and a five-year record retention policy for audits. Payment is made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days.
Spartanburg County Government

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
California Department of Transportation

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
NHANG PEASE AIR NATIONAL GUARD BASE – PAVEMENT REPAIRS
Solicitation # RFB-DMAVS-2027-05
The New Hampshire Department of Military Affairs and Veteran Services is soliciting bids for pavement repairs at the NHANG Pease Air National Guard Base, specifically targeting the Building 158 roadway, the Contract Gate, and the Building 145 parking lot. The project requires the contractor to provide all necessary materials, tools, and safety devices to ensure smooth, stable, and properly compacted pavement with positive drainage and safe transitions. Key deliverables include a proposed work schedule, traffic-control and quality-control plans, asphalt mix-designs, and comprehensive closeout documentation including a marked repair-area plan and warranty information. Award eligibility is based on the lowest cost among vendors who meet the established criteria, including having a completed Vendor Application Package on file with the NH Bureau of Purchase and Property, meeting Federal System for Awards Management (SAM) requirements, and providing proof of comprehensive general liability insurance. The contract is governed by State of New Hampshire Form P-37 and modified by Exhibit A, requiring both performance and payment bonds equal to the contract price. Compliance with the Davis-Bacon and Related Acts, the Buy America Preference, and various federal non-discrimination statutes is mandatory. Payments are processed monthly via bank draft or electronic funds transfer, with a 5% retainage deducted from partial estimates until final project completion. Bids must be submitted by December 14, 2026.
Department Of Military Affairs & Veteran Services

POSTED

about 3 hours ago

DEADLINE

in 27 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS