Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 4, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

POD for NASA/GSFC Science Instrument: Instrument Design, Fabrication, Integration, and Test

Closed
NASA-GSFC-POD-Science-Instrument-Instrument-Design-Fabrication-Integration-and-TestFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336419
Federal
Weapons Shipping Harness Refurbishment Blanket Purchase Agreement
Solicitation # N6278927Q0001
Solicitation N6278927Q0001 is a request for quotes to establish a multiple award Blanket Purchase Agreement (BPA) for the refurbishment of SSN 688 class weapon shipping harnesses to support waterfront submarines at SUBASE New London in Groton, Connecticut. The scope of work includes the complete disassembly, refurbishment of all parts, reassembly, NDT testing, painting, and weight testing of these safety-critical tactical handling gear in accordance with NAVSEA specifications and strict naval nuclear safety standards. The BPA will have a five-year period of performance from January 27, 2027, to January 26, 2032, with a total ceiling of 500,000 USD and a per-call limit of 100,000 USD. Individual requirements will be competed among BPA holders based on the most advantageous quote. Awards will be made based on best value, evaluating technical qualifications and the ability to meet schedules, past performance, and price. Offerors must provide at least three references from the last three years and a description of their property management system. The procurement is not a small business set-aside and is limited to sources capable of meeting specialized military design and safety standards. Quotations are due by 4:00 PM EST on December 3, 2026, and must be submitted electronically. Contractors are required to use the Wide Area Workflow system for invoicing and must comply with CMMC cybersecurity requirements and SAM registration.
Supply Of Shipbuilding Groton

POSTED

9 days ago

DEADLINE

in about 1 month
NAICS: 336419
DIBBS
FLANGE, PIPE
Solicitation # SPE7M4-27-T-0838
Solicitation SPE7M4-27-T-0838, issued by the DLA Weapons Support Fluid Handling Division, is a request for quotations for eight 5-inch pipe flanges (NSN 4730-01-313-2154). The procurement is conducted under full and open competition with a need ship date of April 6, 2027, and a final required delivery date of May 2, 2027. Delivery is set as FOB Origin, with the destination being DLA Distribution San Joaquin in Tracy, California. The items are designated as critical application items and must adhere to specific technical drawings and specifications, including MIL-PRF-20042G. The contract imposes strict quality and environmental standards, requiring the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001. Sampling must follow MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Prohibitions are in place regarding the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow DLA requirement RP001. Administrative requirements include electronic invoicing via Wide Area WorkFlow (WAWF) and compliance with various FAR and DFARS clauses, including the Buy American Act and the Berry Amendment. Cybersecurity compliance is mandatory, specifically referencing CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Additionally, a price evaluation preference is available for certified HUBZone Small Business Concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

10 days ago

DEADLINE

in 1 day
NAICS: 336419
DIBBS
NIPPLE, PIPE
Solicitation # SPE7M3-27-T-0303
Solicitation SPE7M3-27-T-0303 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 674 copper alloy pipe nipples, identified by NSN 4730011152648. The items must be manufactured in accordance with ASTM B687 and are designated as critical application items. The contract prohibits the use of Class I ozone depleting chemicals and explicitly excludes any items produced via additive manufacturing processes. Delivery is required within 164 days after order, with an original required delivery date of March 17, 2027, and a need ship date of April 6, 2027. Shipping is FOB Origin, with the destination for inspection and acceptance located at DLA Distribution San Joaquin in Tracy, California. The procurement is subject to various federal regulations, including the Buy American Act and the Berry Amendment. Packaging must comply with ASTM D3951 and MIL-STD-129, while palletization must follow DLA requirement RP001. Quality assurance is managed through Certificate of Conformance procedures per FAR 52.246-15. Invoicing and payment are to be processed electronically via the Wide Area WorkFlow system. The solicitation is open to full and open competition, with a specific price evaluation preference provided for certified HUBZone small business concerns. Administrative contact for this requirement is William Cain.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

10 days ago

DEADLINE

in 1 day
NAICS: 336419
Federal
DRAFT STATEMENT OF WORK FOR REVIEW: BQM-34S Engine Repair, Overhaul and Conversion
Solicitation # RFI-N00019-242-25-076-SN
The Naval Air Systems Command is seeking industry feedback on a draft Statement of Work for the repair, overhaul, and conversion of J85-GE-5 and J85-GE-100A engines. This effort supports the United States Navy BQM-34S Subsonic Aerial Target under the Strengthen Target Inventory New Growth (STING) program. The scope of work includes performing Test, Teardown and Evaluation to return assets to Ready-for-Issue condition, executing repairs on J85-GE-100A engines, and converting J85-GE-5 engines into J85-GE-100A configurations. All work must be performed in accordance with Technical Manual 01-J85-2 and PPC50, with finished engines expected to have a service life of 10 to 15 operating hours. Key deliverables include TT&E results, performance evaluation results, and monthly progress reports. The contractor is responsible for all quality inspections, test cell verification, and packaging using government-furnished storage containers marked per MIL-STD-129. Security requirements are stringent, requiring personnel to be eligible for Non-Critical Sensitive work via a Tier-3 investigation and adherence to NIST SP 800-171 Rev 2 and CMMC Level 2 cybersecurity standards. Additionally, contractors must comply with DFARS 252.204-7012 for safeguarding covered defense information. This is currently a request for information, and feedback must be submitted to the contracting office by October 23, 2026.
Naval Air Systems Command

POSTED

13 days ago

DEADLINE

in about 22 hours

General Info

Agency

N/A

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Rosa E. AcevedoProcurement Analyst

Full Description

Show more
Partnership Opportunity Document (POD) for NASA's Goddard Space Flight Center Science Instrument -- Instrument Design, Fabrication, Integration, and Test dated June 2, 2018 TABLE OF CONTENTS SECTION PAGE 1.0 Introduction/Scope 3 1.1 Cost 3 1.2 Desired Mission Services 4 1.3 Proposal Support 4 2.0 Mission Overview 5 2.1 Launch Vehicle 5 2.2 Launch Readiness date 6 3.0 Technical Requirements 6 3.1 General 6 3.2 Laser Accommodation 6 3.3 Optical 6 3.4 Mechanical 7 3.5 Thermal 7 3.6 Electrical 7 3.7 Data 10 4.0 Statement of Work 10 5.0 POD Response Instructions, Format, and Selection Criteria 10 5.1 Instructions 10 5.2 Format 11 6.0 Evaluation Factors and Criteria 11 7.0 Point of Contact: 12 8.0 Final Due Date of POD Response 12 9.0 Acronyms 12 ? 1.0 INTRODUCTION/SCOPE This proposal opportunity will respond to the NASA Heliophysics 2018 Mission of Opportunity (MoO) Announcement of Opportunity (AO). The draft AO was released on 05/03/18. NASA's Goddard Space Flight Center (GSFC) is developing a mission concept to be proposed for this AO. The mission will consist of an optical / laser instrument that will be hosted on the International Space Station (ISS), specifically on the Japanese Experiment Module External Facility (JEM-EF). The partnership opportunity is issued to select a teaming partner that will develop the instrument and deliver a fully integrated and tested instrument ready for integration into the launch vehicle. The laser(s) will be fully developed and tested by GSFC and provided to the partner, as Government Furnished Equipment (GFE), for integration into the instrument. The proposed mission is currently in pre-Phase A. This phase ends with a Step 1 proposal, which is expected to be due six months after the release of the draft AO. If the proposal is selected, the next step in the proposal process is a mission concept study culminating in a Concept Study Report (CSR), which is the Step 2 proposal, and a Site Visit. The following schedule should be used as a basis for responses to this opportunity: Partnership Opportunity Document (POD) released June 2, 2018 Responses due June 15, 2018 Partner Selection announced June 29, 2018 Project Phase duration and milestones*: Phase A: 10/1/19-9/30/20 - (12 months) Phase B: 10/1/20-7/6/21 - (9.2 months) Phase C: 7/7/21-10/11/22 - (15.2 months) Phase D: 10/12/22-10/31/23 - (12.6 months) Systems Requirements Review (SRR): 8/3/2020 Preliminary Design Review (PDR): 5/27/2021 Critical Design Review (CDR): 2/21/2022 Integration & Testing (I&T): 10/12/22 - 6/15/2023 Pack & Ship: 6/16 - 6/22/2023 Launch: 09/29/2023 * Please note all the project schedule dates listed are subject to slip due to AO release dates and project award. 1.1 COST Total cost and cost fidelity are important issues for the mission trade studies. The cost cap for this AO is expected to be $55 million. This cost includes the instrument, launch site support, mission and science operations for a mission lifetime of 18 months plus commissioning, and post mission processing, as well as required contingency (25% or greater reserves). The Phase A mission concept study (Step 2 down-selection) will have a total cost cap of $400,000. There will be no exchange of funds between the teaming partners for the portion of this partnership opportunity dealing with the preparation of the initial submission (Pre-Phase A, Step 1 proposal) to the AO. Funding may be available for subsequent phases should the candidate mission concept be competitively selected for those additional phases. 1.2 DESIRED MISSION SERVICES GSFC is interested in formally establishing a partnership to provide the following for the mission: provide instrument management, systems engineering, design, fabrication, integration, and test of the science instrument, and incorporating a laser subsystem to be provided by GSFC, providing instrument support for the launch vehicle, to-ISS, and to-operations center interface support during the mission development phase. The proposer will have knowledge and experience with design and implementation of instruments for the ISS/JEM external facility. The Partner will participate in all aspects of the instrument development, from concept to launch site support, including all relevant reviews. The Partner will support the PI in the development of the Project Implementation Plan per the guidelines in the announcement of opportunity for a small Category 3 Class D project per NPR 7120.5E instrument and manage their day to day project schedule and costs as agreed to with the PI. The Partner will perform systems engineering and product assurance necessary to meet mission objectives. The expected distribution of responsibilities will be as follows: GSFC: - Principal Investigator/science team - Program Management - Laser Development (laser will be GFE to be integrated into the instrument by the POD partner - Independent Technical Authority - Mission Operations and Ground Systems (developed by Co-I institution) POD partner: - Instrument Management: o Perform the instrument management and support functions, including instrument manager (IM), contracts and procurement, resources, configuration, schedules, project support and logistics. This instrument manager will report to the GSFC program manager. - Systems Engineer: o Perform the instrument systems engineer functions, including proposal development (working with the GSFC proposal team, see Sec. 1.3), requirements development, interface definitions (with GSFC laser, ISS, and launch vehicle, ground systems and operations), review preparation and presentation (all required reviews), concept design and flight and GSE hardware development, integration and test, launch and instrument commissioning support. - Safety and Quality Assurance: o Perform safety and quality assurance functions, including preparation for the required ISS safety, and, hardware quality assurance. The partner is responsible for delivery of an integrated and tested flight-ready instrument to the launch site, per the project schedule. The partner is not required to develop the following hardware/subsystems. However, the partner is responsible for ensuring the proper interfaces and making accommodations for fit/operation, and integration and testing (at instrument level) of the following: - Laser(s): Developed by GSFC, (GFE to the partner) - Optical Filters: (GFE to the partner) - PIU: Provided by the ISS, (GFE to the partner) - Launch Vehicle Mounts: Provided by ISS/Launch Vehicle Service (GFE to the partner) - ISS Installation/decommissioning tools The partner is responsible for development/procurement of all other instrument components and systems, including: - Flight structure and optical bench - Deployable mechanisms - Optics (telescope, sub-optics, and detectors) - Thermal control system (fluid cooling loops, heaters, blankets, and control electronics) - Electronics (power, command and data handling, communication, and mechanism control) - Analyses: o Structural o Thermal - GSE: All necessary GSE for processing the instrument during I&T and transportation. 1.3 ALL INTERESTED PARTIES ARE REQUIRED TO RESPOND TO THIS POD IN ACCORDANCE WITH SECTION 5 BELOW. PROPOSAL SUPPORT It is expected that the selected POD respondent will provide support using their own resources to help develop the required MoO proposal elements in response to the Step 1 Pre-Phase A NASA AO in the area of a well-defined and documented instrument, instrument-to-launch vehicle integration support, instrument-to-ISS interface support, and instrument-to-operations center interface support. The POD respondent will be expected to write or assist in the writing of portions of the proposal relevant to their responsibilities. Furthermore, the POD respondent will meet with the Principal Investigator (PI) and other proposal team members to help define the end-to-end performance requirements, including providing well-defined interfaces to the ISS and the GFE laser subsystem, to define the system architecture, to identify study topics, and to predict performance. This will include cost estimation for mission phases. The period of performance for this interval is expected to last from the award of the POD until the proposal submission date. Should the proposal be down-selected for a Phase A Mission Concept Study, the selected partner will support the Phase A effort for the 9-month to one-year concept study phase, culminating in a Mission Concept Study Report as the Step 2 proposal. The selected partner will also provide support to prepare for and execute a review panel Site Visit (location and exact date TBD). Partial funding may be provided to the partner for this Phase A mission concept study support, Mission Concept Study Report, and Site Visit. Should the mission be selected for development and launch (Phases B-F), the partner will be responsible for the design, development, integration, test, and delivery of the instrument, as well as for launch site support. The above dates and durations may change depending on selection timelines and budget allocations or phasing. The respondent to this POD shall state the timeframe that their services will be available and the extent that the respondent can meet the expected AO timeline requirements. 2.0 MISSION OVERVIEW The mission consists of an earth-pointing lidar instrument mounted on the ISS JEM-EF. The mission uses two lasers to send pulses into the earth's atmosphere and a receiver telescope to collect the photons returned from the atmosphere. Photon-counting detectors transmit photon data to the instrument electronics, which perform minimal onboard processing before transmitting the data across the ISS data interface for transmission to the ground, and ultimately to the science operations center (SOC) at GSFC. Boresight alignment mechanisms will be operated as necessary to maintain alignment between the transmitted lasers and the receiver telescope field of view. Heat dissipated by the lasers and electronics is transported away from the instrument by the instrument liquid cooling loop which will be connected to the JEM-EF liquid cooling loop. The instrument must meet JEM-EF accommodation requirements for volume, mass and power, and must adhere to specific electronic, data, and physical interface requirements, including interfaces for the launch vehicle and for the ISS robotic arm that will remove the instrument from the launch vehicle and install it on the JEM-EF, and will un-install the instrument from the JEM-EF and install it in the return vehicle, at the end of the mission. GSFC 420-01-09, EXTERNAL PAYLOADS PROPOSER'S GUIDE to the International Space Station, and, NASDA-ESPC-2900B, JEM Payload Accommodation Handbook, are examples of sources for the JEM requirements for hosted payloads. 2.1 LAUNCH VEHICLE The launch vehicle and launch services are provided by NASA's ISS program. The likely launch vehicle is a Space-X Falcon 9 with a dragon capsule. The dragon capsule has an instrument transport compartment, the "trunk", which has specific instrument interfaces. The instrument will be delivered to the Space-X processing facility and, after minimal instrument team launch site operations, will be turned over to the Space-X launch site team for integration to the dragon capsule. 2.2 LAUNCH READINESS DATE The vendor must commit to meeting the launch readiness date specified in the Mission of Opportunity AO. This date is currently expected to be 09/29/2023. SRR: 8/3/2020 PDR: 5/27/2021 CDR: 2/21/2022 I&T: 10/12/22 - 6/15/2023 Pack & Ship: 6/16 - 6/22/2023 Launch: 09/29/2023 Note: All above dates are approximate 3.0 TECHNICAL REQUIREMENTS 3.1 GENERAL The mission will be a small Category 3 Class D project per NPR 7120.5E, with an 18 month lifetime that is consistent with the EHPD Mission Assurance Requirements (EHPD-RQMT-0003) Unless otherwise noted, the provider is expected to deliver one flight unit for each component listed. Mass: <320 kg, total instrument (including GFE lasers) (excluding PIU and launch vehicle mounts) Power: <440 W, total instrument (including lasers power = 246 W) Communication: ISS/JEM 1553 3.2 LASER ACCOMMODATION Quantity: 2 each Envelope: 87 x 204 x 305 mm (each laser) Mass: 17 kg total (both lasers) Wavelength: 589 nm Laser Power: 123 W each, 246 W total (included in the instrument total) 3.3 OPTICAL Telescope: - 0.6 m primary aperture - Beryllium substrate and metering structure - Optimized for ?=589 nm (>90% reflectance) - Mass < 22.5 kg - Volume: o Diameter < 612 mm o Length < 500 mm Detectors: - 8 each, Perkin Elmer Silicon Avalanche Photo Diode (APD) - Model: SPCM-AQR-IX Aft optics: - Full development: o Including: optical elements, mounts, and detector fiber optics o Excluding: GFE filters (e.g. etalon). 3.4 MECHANICAL Instrument Enclosure: - Instrument structure, including all internal (instrument components) and external mounting and interfaces with the ISS JEM and its associated robotics. Instrument Optical Bench Analysis: - Structural design and analysis for all instrument subsystems Aperture Cover Mechanism: - Deployable door, command deployable, launch lock, capable of stowing via command and ISS robotics operations. Bore-sight Alignment Mechanism: - 2 each, (one per laser), to provide rotation for GFE Risley prism pairs. - Each mechanism provides 2 DOF (angular) control over the laser pointing/alignment. Laser Aperture Cover Mechanism: - 2 each, (one per laser), operations via command 3.5 THERMAL Analysis: - Thermal subsystem design and analysis of all instrument systems Fluid Cooling Loop: - Develop fluid loop to interface with the ISS JEM, including the cold plates, accumulator(s), lines, and flow control orifices Heaters: - Design and specification of the heater circuits, implementation of all operational and survival heater circuits and elements into the instrument Thermal blankets: - Design and development of all thermal control blankets 3.6 ELECTRICAL Main Electronics (ME) general requirements - The main electronics shall interface to ISS 1553B communications - The main electronics shall interface to ISS power service - The main electronics shall interface with the laser electronics units Main Electronics (ME) Requirements 1. ME should encompass three main functions which could be physically allocated into one or more electronics modules: Power Conversion, Laser Control, and Instrument Avionics. Each module may contain an appropriate number of electronics cards to perform the three required functions subject to the instrument mass, volume, and power requirements. a. Power Conversion 1. Provide ISS 120 Volts Direct Current (VDC) power conversion down to 28 VDC for the overall instrument. 2. Provide 28 VDC power for two Laser Electronics Units (LEUs.) b. Laser Control 1. Interfaces to two Lasers. 2. Provides an interlaced 300 Hz differential master clock for each of two LEUs. 3. Provides command, communications, control, and telemetry services to the LEUs. 4. Each Laser command and control shall be performed via two serial RS422 links. 5. Each Laser shall generate a T0 timing signal that verifies continued Laser firing. NOTE 1: The two LEUs are GFE. The Main Electronics (ME) does not include the LEUs. c. Instrument Avionics (IA) 1. Provides single-channel 1553B Remote Terminals (RT) bidirectional communications to the ISS 1553 BBC. 2. Provides ISS command parsing and command response. 3. Generates and distributes two interleaved 300 Hz clock signals to the two LEUs. 4. Receives Laser photon count science data collected by eight Single Photon Counting Modules (SPCMs). 5. The Instrument Avionics (IA) shall ingest the SPCM maximum photon count of 20 Mcps/SPCM x 8 SPCMs. Therefore, the total maximum science input photon count rate is 160 Mega counts per second (Mcps). 6. The 8 SPCMs bin counts are captured and summed by the IA for each time bin. 7. The IA shall create photon count bins from the SPCMs Transistor-Transistor Logic (TTL) signals as follows: - A 240 bin data set is captured for each pulse. - A data set for each laser wavelength is transmitted to the ISS twice per second. 8. The IA shall collect and transmit housekeeping telemetry data from the instrument. 9. The IA provides mechanism control for all instrument mechanisms. 10. The IA provides thermal monitoring and control loops for: 4 pump diodes, 1 Etalon, The telescope primary, secondary, and overall structure. 11. The IA ingests the ISS 1 Pulse Per Second (PPS) Broadcast Ancillary Data (BAD) data for real-time ISS location and current time extraction. 12. The IA performs science data time binning, Consultative Committee for Space Data Systems (CCSDS) data packetization, Coordinated Universal Time (UTC) packet time stamping, and populates each data packet with real-time ISS coordinate positions obtained from (xi.) above. 13. The IA implements a two-fault tolerant Laser Fire Inhibit Safety requirement. This is required by the Johnson Space Center's (JSC) Computer-Based Control System (CBCS). 14. The ME supplier shall provide and deliver all Electrical Ground Support Equipment (EGSE) required for the instrument integration and test, including launch site instrument checkout. 15. The IA shall receive each Laser's T0 timing signal to properly synchronize its time binning function and monitor the Laser operation. 16. The IA shall implement a 1553B loss of signal (LOS) watch dog timer (WDT). 17. Harness: Design and develop all harness (flight and GSE) required by the instrument for flight operations and ground testing. Deliverables 1. One Engineering Model (EM) ME system. 2. One Flight Model (FM) ME system. 3. One EM EGSE monitoring and control system capable of interfacing to the I&T ASIST and/or TReK software. The EGSE shall interchangeably work with both, the EM ME and the FM ME hardware. 4. Design, test, and acceptance documentation for the ME EM and FM systems. 5. ME firmware code (no flight software) and test documentation. 6. ME User's Manual. 7. EGSE User's Manual. 8. Technical support. 9. Training for Government users and operators of the ME and EGSE hardware. 10. Complete parts list for every module of the ME and EGSE. 11. Space flight heritage, if available. Describe any previous space flight mission in which the ME hardware has previously flown. 3.7 DATA Data Rate: <16 kbps 4.0 STATEMENT OF WORK During the proposal preparation period, the partner will participate as part of the mission proposal team. Statements of Work (SOWs) are not required to be submitted with the Step 1 proposal. However, they are required before the Phase A (Step 2 proposal) work can begin. Therefore, the partner shall provide a draft statement of work during the Step 1 proposal effort that defines what the partner is proposing to provide to the mission. SOWs will include the requirement for a Phase A CSR as well as general task statements for Phases B through F. SOWs will include the following as a minimum: Scope of Work, Deliverables, and Government Responsibilities (as applicable). SOWs need not be more than a few pages in length. 5.0 POD RESPONSE INSTRUCTIONS, FORMAT, AND SELECTION CRITERIA 5.1 INSTRUCTIONS The respondent shall: - Provide demonstrated prior institutional experience and flight heritage of developing and delivering low-earth orbit instruments. - Provide demonstrated flight heritage, either within the respondent's own organization, or from proposed sub-contractors, designing and implementing mechanical, thermal, electrical, and data interfaces with the launch vehicle, and the ISS. - Demonstrate understanding and quantified experience in the design, fabrication, integration, and testing of spaceflight instruments. The response shall describe how the respondent proposes to meet the requirements given in Section 3. - Describe the instrument to the ISS JEM/EF mechanical, thermal, and electrical interfaces. Provide information on the maturity of these interfaces and indicate if the configuration has flight heritage and demonstrated on-orbit performance. - Describe the approach for instrument integration and test, including the location for these activities. This will include a discussion of what capabilities the respondent has in their own facilities, and what capabilities will need to be procured from outside the respondent's organization. This will include a description of the instrument safety and mission assurance process. - Describe the approach for supporting the AO Step 1 proposal, the mission concept Phase A study (Step 2 proposal), Step 2 Phase A Site Visit, and mission development, including the level of support that the partner plans to make available for each activity. - Demonstrate the ability to work closely with the PI and his team members at GSFC in Greenbelt, MD. Describe how the respondent will carry out day-to-day interactions with the project office at GSFC and the laser development team at GSFC. - Provide a brief statement of work defining participation in the AO Step 1 proposal. - Provide an itemized cost estimate from initial selection (Phase A) onward for all activities, including instrument design, integration and testing, and launch site support. The AO proposal process limits cost changes between the Step 1 proposal and the Step 2 proposal to no more than 20% total. The response shall include a brief discussion of the uncertainty in the cost estimate. 5.2 FORMAT The response to this partnership opportunity is limited to 15 pages in not less than 12-point font. Excluded from the page count are the cover letter, title pages, table of contents, and acronym list. Partners may attach additional appendices that further describe their capabilities, although GSFC is under no obligation to include the contents of such appendices in the evaluation of the offer package. The entire offer package, including any cover letter, title pages, and other supporting material, shall be formatted as a Portable Document Format (PDF) file delivered to the E-mail address below. 6.0 EVALUATION FACTORS AND CRITERIA The evaluation team will use the following factors in selection and award: 1. Technical (35%). Offerors will be evaluated on their ability to: a. Provide technical input during the step one proposal development. b. Provide design and development support during phase A. c. Meet the instrument technical requirements as stated in Section 3. d. Demonstrate heritage and Technology Readiness Level (TRL) of the proposed solution. e. Provide personnel, (with the experience, skills and past performance) (partner, or its sub-contractors), capable of completing the required project support, systems engineering, design, analyses, preparation and presentations at reviews, hardware development, integration, and test. f. Demonstrate capability to provide facility (at the partner, or its sub-contractors locations) that meets the instrument requirements through all its development phases from formulation to pack and ship to launch site. 2. Cost (30%). Offerors will be evaluated on their overall cost and on the reasonableness of cost and schedule estimates. 3. Relevant Experience and Past Performance (35%). Special emphasis will be given to demonstrated experience with similar missions, particularly with regards to laser and lidar instruments and to ISS-hosted payloads, and relevant reviews. 7.0 POINT OF CONTACT: Questions about this POD should be directed to Rosa E. Acevedo, at rosa.e.acevedo@nasa.gov, or (301) 286-7152. 8.0 FINAL DUE DATE OF POD RESPONSE The response to the POD is due no later than 5 p.m. EDT on June 15, 2018. The electronic PDF document shall be sent to Rosa.E.Acevedo@nasa.gov It is the responsibility of potential respondents to monitor the following site: http://fbo.gov for information concerning this POD. 9.0 ACRONYMS AO Announcement of Opportunity APD Avalanche Photo Diode ASIST Advanced Spacecraft Integration & System Test BAD Broadcast Ancillary Data CBCS Computer-Based Control System CCSDS Consultative Committee for Space Data Systems CDR Critical Design Review CSR Concept Study Report DC Direct Current DOF Degrees Of Freedom EGSE Electrical Ground Support Equipment EM Engineering Model FM Flight Model GFE Government Furnished Equipment GSFC Goddard Space Flight Center Hz Hertz IA Instrument Avionics I & T Integration & Test ICD Interface Control Document ISS International Space Station JEM-EF Japanese Experiment Module-External Facility JSC Johnson Space Center kbps kilo bits per second kg kilogram LEU Laser Electronics Unit LOS Loss Of Signal Mcps Mega counts per second ME Main Electronics mm millimeter MoO Mission of Opportunity NLT No Later Than nm nanometer NPR NASA Procedural Requirements PDF Portable Document Format PDR Preliminary Design Review PI Principal Investigator POD Partnership Opportunity Document PIU Payload Interface Unit PPS Pulse Per Second ROM Rough Order of Magnitude RT Remote Terminal SOW Statement Of Work SPCM Single Photon Counting Modules SRR Systems Requirements Review TBD To Be Determined TReK Telescience Resource Kit TRL Technology Readiness Level TTL Transistor-Transistor Logic U.S.A United States of America UTC Coordinated Universal Time VDC Volts Direct Current W Watt WDT Watch Dog Timer

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS