Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Pond Bottom Excavation & Stockpiling

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Pond Bottom Excavation and Stockpiling involves providing excavation services for prime contractors on Victorville Water District projects. The scope of work requires the removal of one to two feet of dirt from pond bottoms and the management of spoils through onsite stockpiling on the pond side. To successfully deliver the project, the contractor must utilize excavators, loaders, and hauling equipment that fully comply with CARB regulations. The opportunity was posted on September 30, 2026, with a response deadline of October 22, 2026. Classified under NAICS code 238910, this project is managed through the California Water agency. Interested parties can find further details and submission guidelines via the provided OpenGov procurement portal.

General Info

Subcontract for pond bottom excavation and stockpiling for Victorville Water District projects.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of MS27-044.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Annual Maintenance for Pond 14

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Water
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Water
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Excavates dirt from pond bottoms for prime contractors on Victorville Water District projects. Removes 1–2 feet of dirt from the pond bottom and manages onsite stockpiling of spoils on the pond side. Requires excavators, loaders, and hauling equipment compliant with CARB regulations. Delivers an excavated pond bottom with spoils stockpiled onsite.

Similar Contracts

Same NAICS industry code

More opportunities from California → Water

Same awarding agency

NAICS: 237990
SLED
Annual Maintenance for Pond 14
Solicitation # MS27-044
The Victorville Water District is soliciting bids for the annual maintenance of Percolation Pond 14 under solicitation number MS27-044. The primary objective of this project is to restore and maximize percolation rates through the removal of accumulated sediment, vegetation, and compacted material. The scope of work requires the contractor to excavate 1 to 2 feet of dirt from the pond bottom, stockpile the spoils on the side of the pond, and mechanically rip the entire basin surface from bank to bank at a depth of 6 to 8 inches. The selected contractor must be available for mobilization on an as-needed basis and capable of performing the work within two weeks of a request. Bids are due electronically by October 22, 2026, at 2:00 pm PST, and attendance at a mandatory pre-bid meeting and job walk on October 8, 2026, is required for a bid to be considered responsive. The contract will be awarded to the lowest responsible bidder. Required submittals include a 10 percent bid bond, a non-collusion declaration, and certifications regarding the Iran Contracting Act, Senate Bill 854, and fleet compliance. The project is subject to California prevailing wage laws, DIR registration, and CARB certification for off-road diesel fleets. Additionally, the contractor must comply with CalGreen and City of Victorville waste diversion rules, ensuring at least 65 percent of non-hazardous construction and demolition debris is diverted from landfills. Financial and legal protections include requirements for a faithful performance bond, a payment bond, and a guaranty bond covering defects for 12 months after acceptance. Insurance requirements specify a minimum of 2 million dollars in combined single limit commercial vehicle liability. The contractor must also provide worker's compensation insurance in accordance with the California Labor Code and submit DAS 140/142 public works apprenticeship forms.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 22 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS