Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from New Jersey was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pool Resurfacing with Specialty Coating Application

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238390
New
Federal
Springdale JCC – Gymnasium Foundation Waterproofing
Solicitation # springdale-jcc-gymnasium-foundation-waterproofing
The Career Systems Development Corporation is seeking quotes for gymnasium foundation waterproofing at the Springdale Job Corps Center in Troutdale, Oregon. The project aims to mitigate groundwater seepage and excessive humidity through a comprehensive scope of work that includes excavation, the installation of a minimum 24-inch high waterproof membrane on the foundation perimeter, and the implementation of a complete sump pump system with associated drainage pipes, liners, and alarms. Additionally, the contractor will be responsible for installing discharge lines, dedicated electrical outlets for pumps and dehumidifiers, and performing hydrojetting of existing drain lines. This solicitation is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov designated entities. All work must comply with the Davis-Bacon Act, specifically Wage Determination OR20260100, R.1, and contractors must provide a valid Oregon CCB contractor's license number. Quotes must be itemized by parts and labor and remain valid for 90 days from the closing date of December 11, 2026. For projects valued at $100,000 or more, payment and performance bonds are required upon award. The successful contractor must provide a minimum 2-year materials and workmanship warranty along with appropriate manufacturer warranties. Quotes for unit replacement must include all necessary support equipment, such as dumpsters, temporary toilets, and perimeter security.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Recreation agency in New Jersey is seeking a subcontractor for the complete resurfacing of its main swimming pool. The project involves comprehensive surface preparation, crack repair, and the application of a durable, waterproof, and code-compliant finish, such as quartz aggregate, epoxy, or plaster. All materials and applications must adhere to ASTM standards for aquatic environments to ensure long-term durability and safety. This opportunity is categorized under NAICS code 238390 and was posted on February 25, 2026. Interested parties must submit their responses by the deadline of March 11, 2026. There is no specific set-aside status designated for this contract.

General Info

Place of Performance

NJ, USA

Set-Aside

NONE

Documents

This scope was carved out of 01-2026.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Resurfacing and related repairs to the main pool at the Holmdel Swim Club

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Springdale JCC – Gymnasium Foundation WaterproofingOpen now, due in 17 days
  • Interior Architectural Renovations & FinishesOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Jersey → Recreation
ContactsNo contacts available
OfficeN/A
Organization / AgencyNew Jersey → Recreation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Complete resurfacing of the main swimming pool, including surface preparation, crack repair, and application of a durable, waterproof, code-compliant finish such as plaster, epoxy, or quartz aggregate coating. Must meet ASTM standards for aquatic environments.

More opportunities from New Jersey → Recreation

Same awarding agency

NAICS: 238910
SLED
Tonya Keller Community Center Demolition
Solicitation # 2026-Bid-35
The Township of Middletown, New Jersey, is soliciting bids for the demolition of the Tonya Keller Community Center located at 50 Bray Avenue. The scope of work encompasses comprehensive site preparation, asbestos and hazardous material abatement, the removal of universal waste, and the demolition of the building, including foundations and concrete slabs. Additionally, the project requires utility disconnection, site restoration with clean fill and stone, and electrical improvements to provide new service for existing basketball court lighting. Bids must be submitted electronically via the Township's procurement portal by December 1, 2026, and must include a bid guarantee of 10% of the bid amount, capped at $20,000. The contract will be awarded to the lowest responsive and responsible bidder. Required documentation for submission includes a Statement of Ownership Disclosure, equipment access certification, and various affidavits regarding prevailing wages and non-debarment. The successful contractor must adhere to OSHA safety standards, New Jersey prevailing wage laws if the contract exceeds $16,263, and mandatory equal employment opportunity requirements. The contractor is also required to maintain comprehensive insurance coverage, including general liability and workers compensation, and must provide a performance bond and payment bond. All hazardous waste must be handled and labeled according to DOT and EPA regulations, with waste manifests provided to the owner within 15 days of removal.
Site Preparation Contractors

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS