Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 3, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Port of Seattle and Northwest Seaport - T-18 Shore Power

Closed
c746fState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Dnr900200 Oil And Gas Dnrfra

POSTED

4 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The T-18 Shore Power project in Seattle, WA, involves installing shore power infrastructure at Berths 1 and 3 of Terminal 18 on behalf of the Port of Seattle and Northwest Seaport Alliance. The scope includes installing new electrical feeders from Seattle City Light substations N1 and N2 to each berth, trenching and directional drilling for conduit installation, and setting up new shore power substations at both locations. From these substations, feeders will connect to shore power vaults and outlets on the pier, with Berth 1 receiving two vaults and outlets and Berth 3 receiving three. The project aims to enable active cargo operations to continue during construction, with a total estimated cost between $25 million and $30 million and a substantial completion timeline of 750 calendar days. The contract emphasizes a 7% WMBE utilization goal and incorporates a Project Labor Agreement, with provisions for Longshore Insurance (USL&H), which bidders must review and include in their proposals. Bidders are encouraged to register through BuildingConnected if new to subcontracting with Absher Construction and are advised to contact Ryan Sours for questions. The project bid response deadline is September 16, 2025, and the project is classified under NAICS code 213111, with an estimated contract size ranging from $20 million to $40 million. The project’s primary focus is on electrical and infrastructure work to enhance shore power capabilities at the terminal, supporting sustainable port operations while maintaining ongoing cargo activities.

General Info

Agency

Washington → Absher Construction Company

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Absher Construction Company
Contacts1 person available
OfficeN/A
Organization / Agency
Washington → Absher Construction Company
Office AddressN/A
Contacts
Ryan SoursPoint of Contact

Full Description

Show more
Absher Construction Bid Notification Project: T-18 Shore Power Location: Seattle, WA Bids Due: 9/16/2025 at 2:00 p.m. Project Description: This project is on behalf of the Port of Seattle and Northwest Seaport alliance. The Terminal 18 (T-18) Shore Power Project will install shore power at Berths 1 and 3 of T18. The scope of this project includes installing a new electrical feeder from Seattle City Light substation N1 to Berth 1. A new feeder will also be installed from Seattle City Light substation N2 to Berth 3. To install the new feeders, new conduit will need to be installed by means of trenching and horizontal directional drilling. New shore power substations will be installed at Berths 1 and 3. From the new substations, feeders will be installed to provide power to shore power vaults and outlets located on the pier’s bull rail. Berth 1 will receive two shore power vaults and outlets, and Berth 3 will receive three shore power vaults and outlets. After completion of the shore power installation, the system will be tested and commissioned to ensure the system is functioning properly and as designed. The Terminal will continue active cargo operations during the duration of this Project. The Engineer’s estimate range for this project is $25M - $30M. Time limit for substantial completion of the work is 750 calendar days. The WMBE utilization goal is 7% for this contract. This contract has a Project Labor Agreement (PLA). It is anticipated this project will require Longshore Insurance (USL&H). Please review with your firms, your insurance providers. Please incorporate these costs into your bid proposal, and please note this on your bid proposal. If you’re new to subcontracting with us, please visit: BuildingConnected to get signed up. If you have any questions, please contact contact@example.gov . https://www.absherco.com/subcontracting-opportunities/

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS