Portable Roadway
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract calls for a heavy-duty portable roadway system designed to support Crash, Damaged, and Disabled Aircraft Recovery (CDDAR) operations by providing a rapid, durable surface that allows heavy recovery vehicles and equipment to access disabled aircraft on unprepared terrain. This system is essential for preventing recovery assets from becoming stuck in soft soil, sand, or mud during off-runway recovery efforts. It must be quickly deployable and assembled manually by a small team, with the potential for interlocking, modular, or foldable deployment methods to create a secure and continuous surface spanning 20 to 40 square meters. Issued by the Department of Defense through the FA4819 325 Cons Pkp office at Tyndall Air Force Base in Florida, this sources-sought contract is open with no set-aside restrictions under NAICS code 333998. Responses are due by June 17, 2026, and primary contacts for the contract are SSgt Tyler Smith and SrA Madalyn Coleman. The project emphasizes mobility, ease of assembly, and durability to facilitate rapid recovery operations in challenging environments.
General Info
Agency
NAICS
Place of Performance
Tyndall AFB, FL, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Heavy-Duty Portable Roadway System Description:
Portable Roadway / Rapid Runway / Matting System for support of Crash, Damaged, and Disabled Aircraft Recovery (CDDAR) operations to ensure heavy recovery vehicles and equipment can safely access a disabled aircraft on unprepared terrain.
The primary function is to provide a rapidly deployable and durable surface to prevent recovery assets from bogging down in soft soil, sand, or mud for off-runway recovery scenarios.
System Specifications
Deployment Method: May be interlocking, modular, foldable, etc.Product must be able to be manually assembled by a small team to form a secure, continuous surface.
Total Coverage Area: 20-40 Sq. Meters
