Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Portage Bridge Quebec Shoreline

Closed
NCC-DC-039024-RFPInternational

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Provide Swing Gates Station BEQ's
Solicitation # N400857415686
Solicitation N400857415686, issued by the Facilities Engineering and Acquisition Division at MCAS Cherry Point, North Carolina, requires the removal of four drop arm gates and the installation of new swing arm gates, including 20 foot single swing gates and all incidental related work. The project is located at the Station BEQs and CDC Complex and must be completed within 180 calendar days after award. To maintain operational continuity, gates 1 and 3 must be fully operational before work commences on gates 2 and 4. The contractor is required to provide a detailed Schedule of Prices within 15 calendar days of the award and must adhere to Davis Bacon Act wage determinations and Buy American requirements for construction materials. Proposals are due by 1500 local time on September 16, 2026, and will be evaluated based on the lowest price. Bonding requirements vary by proposal value, with no bonds required for amounts up to 35,000 dollars, payment bonds required up to 150,000 dollars, and both bid and performance/payment bonds required for proposals exceeding 150,000 dollars. The contractor must implement a comprehensive Quality Control program, utilizing an accredited testing laboratory for concrete materials and adhering to ASTM standards. Administrative requirements include submitting invoices via Wide Area Workflow and coordinating with the Contracting Officer's Technical Representative for Red Zone meetings and utility interruptions.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work, electrical installations, and a wide array of materials and services including aggregates, piping, asphalt paving, masonry, welding, and roofing. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a bid deadline of September 17, 2026, at 10:00 a.m. Because the project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, it is subject to the American Iron and Steel (AIS) provisions, Davis-Bacon Related Acts, and specific DBE Program requirements. Eligible bidders include certified DBE, MBE, WBE, SBE, and other disadvantaged or small business enterprises. Qualified respondents must possess a valid California Contractor’s license, provide acceptable insurance, and may be required to provide bonding for 100% of their contract value, though Kiewit will reimburse bond premiums. Kiewit also emphasizes the importance of labor harmony and will consider quotes from bidders capable of maintaining such relations on the project.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 7 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and comprehensive revetted mole repairs involving clearing, grubbing, stone rework, and vegetation removal. The estimated value of the work ranges between 1 million and 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, with a specific 10 percent price evaluation preference for HUBZone small business concerns. Bidders must provide performance and payment bonds and are required to submit an organization plan featuring key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Technical acceptance is based on pre- and post-dredge multi-beam hydrographic surveys meeting USACE accuracy standards and strict quality controls for stone materials. Bids must be submitted in sealed envelopes to the USACE Honolulu District office by the deadline, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 11 hours ago

DEADLINE

in 20 days
NAICS: 237990
New
SLED
Lake Forest Boat Ramp Maintenance Dredging Project
Solicitation # 20260908051
The Lake Forest Boat Ramp Maintenance Dredging Project, managed by the Tahoe City Public Utility District, involves the removal of approximately 391 to 400 cubic yards of accumulated silt and sand from the boat ramp fairway in Tahoe City, California. The primary objective is to restore the lakebed to a historic design elevation of 6,219 feet (Lake Tahoe Datum) to ensure safe vessel access. The scope of work includes mechanical dredging using a floating barge with an excavator and clamshell bucket, the removal and replacement of floating docks, and the installation of a full-depth turbidity curtain to contain suspended sediments. Dredged materials must be transported to shore via a conveyor system, dewatered, and hauled in watertight trucks to the Eastern Regional Landfill in Truckee. The project is scheduled to begin on November 2, 2026, with a completion deadline of December 4, 2026. The estimated contract value is 208,000 dollars. Qualified bidders must be Class A Contractors with a minimum of five projects of similar size and scope and provide at least three references. Bids are due by September 30, 2026, and must include a bid bond for 10 percent of the total amount. The contractor is required to comply with various regulatory permits from the USACE, Lahontan Regional Water Quality Control Board, USFW, and the California State Lands Commission, as well as California DIR and Davis-Bacon Act prevailing wage requirements. Key administrative details include liquidated damages of 500 dollars per day and the requirement for a Designated Biologist to be approved by the CDFW 30 business days prior to any ground-disturbing activities.
Tahoe City Public Utility District

POSTED

about 11 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Bellflower Park Phase I
Solicitation # 20260908039
The City of Adelanto is soliciting bids for the Bellflower Park Phase I project, located at 18361-18411 Bellflower Street, Adelanto, California. This construction project involves the development of a new public park, including the installation of sewer pipes and structures, concrete formwork, a complete basketball court, picnic area flooring, and bicycle racks. The engineer's estimate for the project is 1.7 million dollars, and the contract will be awarded to the responsible bidder who submits the lowest bid based on the total base bid schedule price. The project has a completion timeframe of 240 calendar days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per day. Bidders must provide a bid guarantee of at least 10 percent of the contract price and comply with prevailing wage rates, DIR registration, and the Build America, Buy America Act. Key requirements include a one-year guarantee on materials and workmanship, adherence to OSHA standards, and a waste diversion plan to keep 50 percent of waste material out of landfills. The contractor is required to submit an initial progress schedule within 14 days of the Notice to Proceed and provide monthly invoices. The project incorporates the City of Adelanto Standard Specifications for Public Improvements, Greenbook Standard Specifications, and 2015 Caltrans Standard Plans. Sealed bids are due by September 10, 2026.
City of Adelanto

POSTED

about 12 hours ago

DEADLINE

in about 14 hours

AI Contract Overview

Show more

The contract for the Portage Bridge Quebec Shoreline, issued by the National Capital Commission under the Government of Canada, involves extensive landscape and infrastructure work in Gatineau within the National Capital Region. The scope includes supplying and installing precast concrete footings for railings and light poles, as well as installing the railings themselves. Additional tasks consist of pathway grading and asphalt paving, rip rap placement, and the installation of armour stones with a geogrid-reinforced backfill. The work also covers underground electrical conduit and wiring installation, setup of lighting poles and fixtures, construction of armour stone benches and lookout points, and tree planting to enhance the shoreline environment. The solicitation was publicly posted on January 15, 2026, with proposals due by January 22, 2026. The primary contact for the contract is designated as Andrew Malo, the Contracting Authority. The contract documentation includes an addendum related to another RFP addressing online benefits and performance management, which provides clarifications on technical and administrative questions to inform offerors. However, this addendum remains separate from the primary contract but demonstrates the procurement environment’s focus on thorough support and transparent communication processes. The contract emphasizes high-quality landscaping and civil works intended to improve public infrastructure and visual appeal along the Portage Bridge shoreline area.

General Info

Portage Bridge shoreline project includes concrete footings, railings, paving, lighting, and landscaping in Gatineau.

Agency

Government of Canada → National Capital CommissionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

*Gatineau, CAN

Set-Aside

NONE

Documents

(13)

Addendum 1 for Portage Bridge Quebec Shoreline Rehabilitation

PDFamendment

Tender Documents

TENDER DOCUMENTS

Addendum 5 for Portage Bridge Quebec Shoreline Tender NCC-DC-039024-RFP

PDFamendment

Réhabilitation des berges Portage Phase 3 - Formulaire de mesures d’atténuation

PDF27 pagessow

Addendum 8 to Portage Bridge Quebec Shoreline Tender NCC-DC039024 RFP

PDF3 pagesamendment

Addendum 6 for Portage Bridge Quebec Shoreline Tender NCC-DC039024

PDF1 pageamendment

PBQS Form - Summary of Work and Pricing

XLSX4 pagespbqs-form

Addendum 3 for Portage Bridge Quebec Shoreline Tender NCC-DC039024 RFP

PDF1 pageamendment

Mitigation Measures Form for Portage Phase 3 Riverbank Rehabilitation Project

PDF28 pagesmitigation-measures-form

Addendum 7 for Portage Bridge Quebec Shoreline Tender NCC-DC039024

PDF1 pageamendment

PBQS Form - French - Detailed Work and Pricing Summary

XLSX4 pagesother

Addendum 2 Portage Bridge Quebec Shoreline NCC-DC-039024-RFP

PDF1 pageamendment

Addendum 4 for Portage Bridge Quebec Shoreline Tender NCC-DC039024

PDF3 pagesamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → National Capital Commission
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → National Capital Commission
View Agency Profile
Office AddressN/A
Contacts
AndrewPoint of Contact

Full Description

Show more
Work under this Contract comprises generally of landscape work, supply and installation of precast concrete footings for railings and light poles, railing installation, pathway grading and asphalt paving, rip rap placement, installation of armour stones with backfill reinforced with geogrid, installation of underground electrical conduits and wiring, installation of lighting poles and fixtures, armour stone benches and lookout, and installation of trees

More opportunities from Government of Canada → National Capital Commission

Same awarding agency

NAICS: 237130
International
New Underground Electric Service System
Solicitation # NCC-CS-041053-NRFP
The National Capital Commission has issued a Negotiated Request for Proposals, solicitation number NCC-CS-041053-NRFP, for the installation of a new underground electric service system at Jacques-Cartier Park North in Gatineau, Quebec. The primary objective is to establish a permanent, higher-capacity power supply to support major events, such as Winterlude, and reduce reliance on diesel generators. The scope of work is divided into two phases: Phase 1 focuses on core infrastructure and civil works near Laurier Street, including the installation of a new Hydro-Quebec infrastructure, a 600 V electrical entrance, and low-voltage distribution for the park and Maison du Vélo. Phase 2 is an optional scope extending the distribution to secondary kiosks and additional pull manholes. The project requires the removal of existing electrical infrastructure and the installation of a main 600 V switchboard and 208 V kiosks. Contractors must adhere to strict environmental and safety standards, including the implementation of tree protection, erosion and sediment control, and excess soil management plans. All work must be completed and the contractor demobilized by Winter 2027/2028, as the site will be required for other uses starting in spring 2028. Award selection is based on a multi-stage evaluation of mandatory requirements, technical capabilities, and pricing, with the top-ranked proponent entering direct contract negotiations. Required security includes performance and labour and material payment bonds, each equal to 50 percent of the project value.
Power and Communication Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS