Porter Creek Bridge Repair on Sweetwater Springs Road (Notification of Lake or Streambed Alteration, No. EPIMS-SON-50489-R3)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-50489-R3 for the repair of a scoured bridge footing at Porter Creek on Sweetwater Springs Road in Sonoma County. The project involves surrounding a 63 square foot footing with corrugated, galvanized steel sheets to expand the footprint to approximately 119 square feet, providing scour protection and reestablishing foundation bearing. These sheets must be embedded at least two feet into gravel and soil or six inches into hard rock, with the interior area filled with concrete backfill. Construction will utilize a vacuum truck and pneumatic hand tools, with all vehicles staged on the roadway above the creek bank to ensure only the work crew and hand tools operate below the top of the bank. Environmental protections are central to the project, requiring a water diversion system and dewatering if water is present, which must be maintained for 30 days post-repair to allow the concrete to cure. An on-site biologist will monitor for coho salmon and steelhead juveniles, though these species must not be collected or relocated. The project is expected to result in 56 square feet of permanent and 400 square feet of temporary impact to open channel habitat, with no removal of trees or riparian vegetation. This work is conducted under the authority of Section 1602 of the Fish and Game Code and is managed by the Sonoma County Permit and Resource Management Department.

General Info

CDFW agreement for Porter Creek bridge footing repair and scour protection in Sonoma County.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

EPIMS-SON-50489-R3 Notice of Exemption for Porter Creek Bridge Repair

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
James HansenEnvironmental Scientist
David WalshSenior Environmental Specialist

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SON-50489-R3, pursuant to Section 1602 of the Fish and Game Code to Sonoma County Permit and Resource Management Department. The project is limited to the repair of the existing scoured bridge footing, measuring approximately 63 square feet, within Porter Creek. The scoured footing perimeter will be fully surrounded with corrugated, galvanized steel sheets, expanding the footprint to approximately 119 square feet. The steel sheets will be embedded at minimum 2 feet into gravel and soil, or six inches into hard rock. The steel sheets will match the height of the existing footing, and the area inside the steel sheets will be backfilled underneath the footing with concrete backfill material. The purpose of the galvanized steel sheets is to provide scour protection below grade, act as forms and containment for the concrete backfill, and reestablish the bearing of the foundations of the bridge. Excavation will be performed with a vacuum truck and pneumatic hand tools. Concrete will be delivered through a tube running from a cement truck. All trucks would be staged above the creek bank on the roadway. Only the work crew and hand tools will be working below the top of bank. If water is present in Porter Creek at the time of project construction, a water diversion system will be installed and the work area will be dewatered. A biologist will be on-site to monitor for wildlife and to identify if any coho salmon (Oncorhynchus kisutch pop. 4) or steelhead (Oncorhynchus mykiss irideus pop. 8) juveniles are in the pools. At no time will coho salmon or steelhead be collected or relocated. The water diversion will be maintained for 30 days following the repair to allow concrete to properly cure. The project will result in approximately 56 square feet of permanent impact to open channel habitat and a temporary impact to approximately 400 square feet of open channel habitat due to dewatering. No trees or riparian vegetation will be removed as part of this project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS