Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on July 20, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Portsmouth Local Protection Project, Portsmouth, Ohio

Closed
W9123720R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

General Info

Contract Value

$42,452,518.2

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Portsmouth, OH, 45662, USA

Set-Aside

NONE

Award Issued Date

Documents

42

Amendment 0004 - RFP W9123720R0008 Summary of Changes

PDF, High priority: read this firstamendment
High

W9123720R0008 Amendment 0002 - Portsmouth Levee Repair

PDF, High priority: read this firstamendment
High

A.03.09+Appendix+E+-+Environmental+Analysis.pdf

PDF

A.03.09+Appendix+K+-+NPDES+Application.pdf

PDF

A.03.09+Appendix+L+-+Ph+I+ESA+report_Portsmouth+LPP_final_07+Apr+2020.pdf

PDF

A.03.09+-+KTR+Questions+-+2.pdf

PDF

A.03.09+Plans.pdf

PDF

A.03.09+Specifications.pdf

PDF

A.03.09+Specifications+Rev_01.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+10.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+1.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+2.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+3.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+4.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+5.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+6.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+7.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+8.pdf

PDF

Appendix+A+-+Geotechnical+Design+%28Vol.+1%29%2C+Part+9.pdf

PDF

B.04.20+Davis+Bacon+Wage+Rates+dtd+1+Jan+2021.pdf

PDF

B.08.02+W9123720R0008.pdf

PDF

B.08.03+W9123720R0008+Amendment+0001.pdf

PDF

B.08.03+-+W9123720R0008+-+Amendment+0003.pdf

PDF

B.08.03+-+W9123720R0008+-+Amendment+0004.pdf

PDF

Ohio+River+2019+WTP+monthly+reports.pdf

PDF

Ohio+River+2020+WTP+monthly+reports.pdf

PDF

Portsmouth+Seepage+Barrier+-+KTR+Questions.docx

DOCX

PSBR-MASTER+BASE+WITH+FEATURES_2020NOV21.zip

ZIP

Section+00+10+00+PRice+Breakout+Schedule+Rev_01.docx

DOCX

Section+00+22+00+Evaluation+Factors+Rev_01.docx

DOCX

Section+00+22+00+Instructions+and+Conditions+Rev_01.docx

DOCX

Section+00+73+00+Davis+Bacon+Wage+Rates+Rev_01.pdf

PDF

Summary+of+Changes+in+Solicitation.docx

DOCX

Video+1a.mp4

MP4

Video+1b.mp4

MP4

Video+1c.mp4

MP4

Video+1d.mp4

MP4

Video++2.MOV

MOV

Video+3a.mp4

MP4

Video+3b.mp4

MP4

Video+3c.mp4

MP4

WWTP+effluent+2020+DMRs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

16 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The point of contact changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Dec 7, 2020 to Jan 12, 2021.

Notice updated

The point of contact changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 12, 2021 to Jan 26, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts2 people available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA

Full Description

Show more
The Huntington District, U.S. Army Corps of Engineers intends to procure one Construction Contract for Huntington District U.S. Army Corps of Engineers (USACE) Portsmouth Local Protection Project, Portsmouth, Ohio. The general description of the work for this contract consists of furnishing all materials, equipment, labor, layouts of work features, and supervision needed to accomplish work related to the repairs and stabilization of the Portsmouth Local Protection Project, which includes replacement of approximately 750 feet of damaged 18-inch storm sewer pipe and manholes, replacement of three (3) 36-inch flood pump station discharge pipes with three (3) anti-siphon valves, removal and replacement of 120 feet of 30 to 36-inch sewer pump station discharge pipes and combustible air valve, protect and restore all athletic fields located near the construction site and bypass pumping during construction. Responsibilities of the Contractor include, but shall not be limited to, all planning, programming, administration, coordination, and management to ensure that all work is performed in accordance with all State and Federal laws, regulations, codes or directives. The Contractor shall be responsible for ensuring that the work performed meets or exceeds the requirements of the contract. The Contractor shall perform all related Contractor administrative services necessary to perform the work, such as quality control, contractor financial control, and maintenance of accurate and complete records and files. Also included in the Contractor's area of responsibility is establishing and executing a Contractor Safety Program to ensure that all work is performed in strict accordance with all health, safety and environmental laws, regulations, codes and directives (including EM385-1-1); to protect the general public, as well as Contractor and Government employees. The contract will be awarded to the offeror whose proposal conforms to the solicitation and is within a technical/price competitive range as determined by the Contracting Officer and has been evaluated as most advantageous to the Government, all factors considered. All responsive proposals will be evaluated utilizing the following factors: (1) Technical Approach, (2) Experience, (3) Management Approach, (4) Past Performance, (5) Small Business Participation Plan and (6) Cost/Price. Technical Approach, Experience, and Management Approach, are equal in importance and are more important than Past Performance, which is more important than Small Business Participation Plan. All evaluation factors, other than cost or price, when combined, are significantly more important than cost or price. The NAICS code for this procurement is 237990, which has a size standard of $36.5 million average annual receipts. Per FAR 52.219-14, the small business concern will be required to perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. An organized site visit will be conducted on November 13, 2020. See solicitation for full details. The contract will be awarded to the offeror who is found to be responsive and responsible and most advantageous to the Government, all factors considered. This procurement is a Full and Open competition. Solicitation documents will be available on or about November 5, 2020 and can be downloaded at http://www.beta.sam . ALL SUBMISSIONS TO THIS REQUEST FOR PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army's Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE - Getting Started Guide has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows: Send an email to the Contracting Officer, Samantha L. Stiles, and Contract Specialist, Karen L. Simmons, to receive the link to drop off your proposal. This will need to be completed no more than five (5) business days and no less than two (2) business days prior to the proposal due date. Offerors that fail to email to request a code no less than two (2) business days prior to the proposal due date accept the risk in not receiving a request cod in time for upload to the DOD SAFE site. Karen L. Simmons, Contract Specialist, at Karen.L.Simmons@usace.army.mil Samantha L. Stiles, Contracting Officer, at Samantha.L.Stiles@usace.army.mil b. You will receive an email with the link to submit your drop-off. c. Short Note to the email Recipients: Click the Add Files or Drag and Drop your files. For file description, enter W9123720R0008-FIRMNAME. d. Click the - Upload button to send documents. Please note, as of April 2018, GSA's System for Award Management (SAM) system is requiring new registrations and renewals of existing registrations to submit an original signed notarized letter identifying the authorized Entity Administrator. The notarized letter is not to be submitted to the Huntington Contracting Office as it is not our requirement. Vendors are encouraged to check their entity's status in www.SAM.gov and plan accordingly. If the prospective contractor is not registered in the SAM database, the Contracting Officer will follow the procedures in FAR 4.1103. Contact the supporting Federal Service Desk at www.fsd.gov, or by telephone at 866-606-8220 (toll free) or 334-206-7828 (internationally) Monday through Friday from 8 am to 8 pm EDT, for free assistance. The SAM registration process may take several weeks to process once submitted. Please carefully consider this information when deciding to submit your proposal.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS