Portugese Bend Landslide Remediation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Portuguese Bend Landslide Remediation Project, managed by the City of Rancho Palos Verdes in California, is a comprehensive effort designed to slow the movement of the Greater Portuguese Bend-Ancient Altamira Landslide Complex. The project focuses on reducing groundwater recharge and removing existing groundwater through the installation of deep dewatering wells, a surface drainage system, hydraugers, and fissure filling. To support these technical components, the project also includes grading activities to develop necessary access roads. This initiative is classified as a forecast and has been identified as an Emergency Project under CEQA Sections 21080(b)(4) and 15269(b)/(c), granting it a Notice of Exemption. The work is located in Rancho Palos Verdes, California, within Los Angeles County. Administrative oversight is provided by City Manager Ara Mihranian.

General Info

Rancho Palos Verdes emergency project to remediate landslides via groundwater removal and drainage.

Agency

California → City of Rancho Palos Verdes

Place of Performance

Palos Verdes Drive South, Rancho Palos Verdes, CA, 90275

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Rancho Palos Verdes
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Rancho Palos Verdes
Office AddressN/A
Contacts
Ara MihranianCity Manager

Full Description

Show more
The Portuguese Bend Landslide Remediation Project provides a comprehensive effort to address the Greater Portuguese Bend-Ancient Altamira Landslide Complex with the goal of slowing landslide movement. The Project would help slow the Landslide Complex by removing existing groundwater and substantially reducing groundwater recharge. This would be achieved through the installation of deep dewatering wells, a surface drainage system, hydraugers, and fissure filling. In addition, the Project would include grading to develop access roads to several of these project components.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

1 day ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS