Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Post-Construction Environmental Compliance Monitoring Services in support of WA NP LARO 208(1), Hawk Creek Road Stabilization and WA FLAP LINCOL 57860(1) Hawk Creek Road Improvements

Closed
69056726Q000036Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation 69056726Q000036 is a request for quotations from the U.S. Department of Transportation, Federal Highway Administration, for post-construction environmental compliance monitoring services. The contract supports two specific projects: the WA NP LARO 208(1) Hawk Creek Road Stabilization and the WA FLAP LINCOL 57860(1) Hawk Creek Road Improvements. This is a total small business set-aside under NAICS code 541990, with a firm-fixed-price structure and a period of performance extending from the date of award through November 30, 2027. Services must be performed in accordance with the provided Statement of Work and the Storm Water Pollution Prevention Plan, which includes mandates for endangered species protection, historic property screening, and Safe Drinking Water Act compliance. The government will award the contract using a Lowest Price Technically Acceptable process, evaluating offers based on price, personnel qualifications, relevant past experience within the last seven years, and past performance records from the last three years. Offerors must submit technical quotes, including key personnel resumes and a completed price schedule, electronically to the Western Federal Lands Division. Contract administration requires the use of the DELPHI system for invoicing and mandates adherence to Service Contract Act wage determinations. The Technical Point of Contact is responsible for the inspection and written acceptance of all deliverables, with a defined review timeline of 14 days for draft deliverables and 7 days for final review.

General Info

Post-construction environmental monitoring services for Hawk Creek Road projects in Davenport, Washington.

NAICS

541990 - All Other Professional, Scientific, and Technical Services

Place of Performance

Davenport, WA, 99122, USA

Set-Aside

SBA

Documents

8

69056726Q000036 Amendment 0001

PDF, High priority: read this first9 pages · amendment
High

Attachment 0001 - Price Schedule for Post-Construction Environmental Compliance Monitoring

PDF, High priority: read this first1 page · price-schedule
High

Past Performance Questionnaire for RFQ 69056726Q000036

PDF, High priority: read this first3 pages · past-performance
High

Solicitation 69056726Q000036 Post-Construction Environmental Compliance Monitoring Services RFQ

PDF, High priority: read this first66 pages · rfq
High

WA FLAP LINCOL 56760(1) Hawk Creek Road SWPPP

PDF, High priority: read this first247 pages · swppp
High

Wage Determination No. 2015-5545 for Washington Counties Clallam and Jefferson

PDF, High priority: read this first12 pages · wage-determination
High

69056726Q000036 Vendor Questions and Answers

PDF, Medium priority2 pages · q-and-a
Medium

Attachment 0003 Offeror Work Experience Form

PDF, Low priority1 page · offeror-work-experience
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Deadline changed

Response deadline changed from Sep 3, 2026 to Sep 10, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA
Office AddressVANCOUVER, WA, 98661, USA
Contacts
WFL Simplified Acquisition

Full Description

Show more

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with FAR 12.201-1, Simplified procedures.  This announcement constitutes the only solicitation.  Offers are being requested and a separate written solicitation will not be issued.


Solicitation number 69056726Q000036 is issued as a request for quotation (RFQ) for Post-Construction Environmental Compliance Monitoring Services in support of the WA NP LARO 208(1), Hawk Creek Road Stabilization and WA FLAP LINCOL 57860(1) Hawk Creek Road Improvements projects.


This acquisition is a TOTAL SMALL BUSINESS SET-ASIDE and incorporates provisions and clauses by reference.  The full text of provisions and clauses may be accessed electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52.


Additional information as required in RFO 12.202(b)(1) is provided in the RFQ document attached herein.

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 237310
New
Federal
WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3
Solicitation # 69056726R000020
The project WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3, is a firm-fixed-price task order contract under a Multiple Award Task Order Contract (MATOC) for the Western Federal Lands Highway Division. Located 0.4 miles southwest of Mammoth, Wyoming, the project involves the reconstruction of a 0.7-mile roadway section and associated parking areas within Yellowstone National Park. The scope of work is comprehensive, including 4R roadway reconstruction, excavation, blasting, rock scaling, embankment, drainage and roadside improvements, retaining wall construction, stone masonry, utility relocation, waterline construction, and the installation of concrete curbs, gutters, striping, and signage. The estimated price range for the project is between 45 million and 55 million dollars, with a tentative completion date set for Fall 2028. The solicitation is structured around two primary bid schedules and one option. Schedule A focuses on mainline construction with a 22-foot typical pavement width and the reconstruction of the Norris Geyser Basin parking lot, while Schedule B specifies a 30-foot typical pavement width for the same areas. Option Z covers grading, base, pavement, major drainage, and the construction of a steel boardwalk at the Rustic Falls Boardwalk and the Osprey Pit Road Box Culvert. Only one of the two schedules will be awarded. The project is solicited to approved MATOC contractors, with the formal request for proposal anticipated in Winter 2026/2027. All work must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects for the FP-24 project area.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 237310
New
Federal
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4
Solicitation # 69056726B000010
Solicitation 69056726B000010 is an Invitation for Bids for the Hurricane Ridge Rockfall Mitigation MP 9.4 project located in Olympic National Park, Clallam County, Washington. This firm fixed-price construction project, managed by the Department of Transportation's Federal Highway Administration Western Federal Lands Division, involves the installation of a flexible rockfall barrier system and the application of a weathering agent to 260 square yards of galvanized steel. The estimated project value ranges between 2 million and 5 million dollars, with a tentative completion date set for Fall 2027. The work must adhere to FP-24 standard specifications for the construction of roads and bridges on federal highway projects. This opportunity is a total small business set-aside, requiring bidders to be registered in the System for Award Management. The government will award the contract to the responsible bidder whose proposal is most advantageous based on price and price-related factors. Key requirements include the submission of a valid bid bond, compliance with the Davis-Bacon Act for wage standards, and the use of the government's Masterworks web-based system for daily reporting and pay notes. Specific brand-name justifications have been approved for the RXE-8000 flexible rockfall barrier system from Geobrugg North America and weathering agents from Natina Products. Bids are due by 1400 local time on November 4, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 13 days
View Details
NAICS: 237310
Federal
ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1
Solicitation # 69056726R000019
Solicitation 69056726R000019 is a firm fixed-price task order request for proposals issued by the Federal Highway Administration Western Federal Lands Division for the Yellowstone Trail Road, Segment 1 project in Kootenai County, Idaho. Located in the Coeur d'Alene National Forest, the 0.20-mile project involves roadway realignment and reconstruction, the installation of a new single-span precast prestressed concrete structure, and rock-mass stabilization. The estimated price range for the work is between 2 million and 5 million dollars, with a tentative completion date in Fall 2027 and an assumed notice to proceed date of January 12, 2027. This is a restricted MATOC solicitation, meaning proposals will only be accepted from six specific prime contractors: ASCORP Inc (DBA Debco Construction), Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. Award will be based on the best value, primarily focusing on the lowest price among responsible offerors. The project must adhere to the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-24) and requires strict compliance with various Federal Acquisition Regulation clauses regarding labor standards, equal opportunity, and material workmanship.
Highway, Street, and Bridge Construction

POSTED

9 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
Federal
AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads
Solicitation # 69056726B000011
The project AK NPS DENA 10(64) involves the reconstruction and paving of approximately 2.02 miles of roadway within the Riley Creek Campground in Denali National Park, Alaska. The scope of work includes the reconstruction of three campground loops to a width of 12 feet, paving of the frontage road and the USPS and mercantile parking lots, and the installation of a deep patch along the park road at mile post 14.8. Technical requirements encompass asphalt milling, roadway excavation, subgrade stabilization, the installation of Type 1 asphalt concrete pavement, and Method 2 aggregate base. The project also includes striping in accordance with the Manual on Uniform Traffic Control Devices, minor drainage improvements, and the removal and resetting of signs and trash receptacles. This full and open solicitation, numbered 69056726B000011, is managed by the Department of Transportation's Western Federal Lands Highway Division. The estimated price range is between 5 million and 10 million dollars, with a tentative solicitation date in fall 2026 or winter 2027 and a fixed completion date in fall 2027. A critical requirement for this contract is that all material sources must be certified free of noxious weeds and invasive plants by a federal, state, or local public agency, or through the North American Weed Free Forage Program. Prospective bidders are encouraged to conduct site visits during the fall before snow obstructs the area.
Highway, Street, and Bridge Construction

POSTED

24 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS