Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Pennsylvania was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Post-Installation Inspection and Quality Assurance

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency is seeking engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project under solicitation RFP-JV-26-013. The scope of work encompasses seven primary tasks, including project initiation, data gathering, a 30 percent design level basis of design report, detailed design (60, 90, and 100 percent), and engineering support during the procurement and bid phases for injection and monitoring wells. The project is set as a Small Business set-aside, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. Performance is located in California, with key construction milestones targeted for May 2028 and July 2029. The contract is a not-to-exceed agreement with a warranty period of at least one year following acceptance. Selection is based on a multi-stage process involving team qualifications, experience, and potential interviews, with final approval required by the IEUA Board of Directors. Deliverables must adhere to specific technical standards, including AutoCAD for designs, Bluebeam for reviews, and Class 1 AACE standards for cost estimates. The project must comply with various federal and state funding requirements, including the Davis-Bacon Act, the Endangered Species Act, and Buy America preferences for infrastructure materials. Invoicing is handled electronically via ACH on a monthly basis.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project. The scope of work includes project initiation, utility research, field investigations, and the development of a basis of design across multiple disciplines. The selected consultant will be responsible for creating detailed design drawings and reports at 30, 60, 90, and final design levels, as well as providing engineering support during the bid award process for the construction package. Key deliverables include construction schedules and Opinion of Probable Construction Cost estimates. This is a small business set-aside opportunity open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. The contract is structured on a time and material basis with a not-to-exceed total amount, featuring a 50,000 dollar allowance for mitigation measures. Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on project success factors, communication, regulatory requirements, and implementation plans. The project must adhere to specific engineering design guidelines and federal and state grant funding requirements, including compliance with the Davis-Bacon Act and Build America Buy America standards.
Inland Empire Utilities Agency

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 541330
New
SLED
Walk-In Evidence Freezer Room – Assessment & Planning Consulting Services for Sacramento Sheriff's Office (SSO)
Solicitation # 2026-RFP-0128
The Sacramento County Sheriff's Office (SSO) is seeking a qualified consulting firm to evaluate the existing walk-in evidence freezer room at the Property Warehouse. The primary objective is to assess current conditions, identify deficiencies, and provide a comprehensive report recommending whether to repair or replace the equipment and related systems. The project is divided into two phases: Phase 1 involves a thorough assessment including photographs, measurements, and an improvement plan, while an optional Phase 2 covers the production of bid-ready construction documents. All work must be led by a California-licensed engineer, and any design documents must be signed and sealed by one. This is a consulting services contract only; the selected firm will not be responsible for the actual furnishing or installation of the freezer. The project must adhere to California Penal Code Section 1417.5, California Department of Justice standards, IAPE guidelines, and NIST recommendations. Funding is provided by the County, though equipment may be purchased via the Edward Byrne Memorial Justice Assistance Grant (JAG), which subjects equipment purchases to the Buy American Act and NEPA rules. Proposals must be submitted via the SacCountyE bids portal by December 18, 2026. There is no specific set-aside status for this solicitation. Payment for the assessment and design phases is contingent upon County acceptance of the completed deliverables.
DGS: CAPSD - Procurement

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Professional Design Services For The Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project
Solicitation # 20261127006
The City of Emeryville is seeking professional design services for the Powell Street Sanitary Sewer Main Pipeline Rehabilitation Project. The scope of work involves the full replacement of the gravity sewer main from MH 21.100.27 to MH 21.000.00, with a focus on mitigating differential settlement caused by bay fill soil and increasing pipe slope by lowering the final invert elevation at MH 21.000. The selected engineering team will be responsible for delivering Plans, Specifications, and Estimates (PS&E), developing public outreach plans, and coordinating connections with the EBMUD North Interceptor pipeline, as well as collaborating with Caltrans and other agencies. Proposals are due by January 6, 2027, and will be evaluated based on technical experience with sewer main design in soft soil conditions, project approach, experience coordinating with EBMUD, and methods for maintaining budget and schedule. The selection process may include shortlisting and interviews before negotiating a not-to-exceed price contract. The project requires adherence to the City's standard professional services contract, including insurance requirements and compliance with Emeryville Municipal Code regarding minimum wage and living wage ordinances. Design submittals are required at 30%, 60%, 90%, and final design phases. There is no set-aside status for this solicitation.
City of Emeryville

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Water Department of Pennsylvania is seeking a subcontractor for a post-installation inspection and quality assurance project located in Philadelphia. The scope of work involves the technical inspection of installed window film to identify defects such as discoloration, edge lifting, or bubbles, while providing necessary compliance documentation and punch list support. This subcontract opportunity is categorized under NAICS code 541330. The solicitation was posted on March 27, 2026, with a response deadline of April 7, 2026. There is no specific set-aside status designated for this requirement.

General Info

Place of Performance

Philadelphia, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of B2626734.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Window Tinting Film

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Consulting Services for Chino Basin Program Aquifer Replenishing Facilities DesignOpen now, due in 59 days
  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Water Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Technical inspection of installed window film for defects such as bubbles, edge lifting, or discoloration, including compliance documentation and punch list support.

More opportunities from Pennsylvania → Water Department

Same awarding agency

NAICS: 811310
SLED
Carrier Chillers Inspection, Repair & Maintenance
Solicitation # B2728145
The City of Philadelphia Water Department is soliciting bids for a requirements contract to provide inspection, repair, and maintenance services for two 263-ton Carrier chillers located at the Water Department’s Central Laboratory. The scope of work includes a start-up inspection and oil analysis in early April, two routine inspections in June and August, a shut-down inspection and oil analysis in November or December, winter cleaning of condensers, and an annual inspection of the cooling tower. The contract will be awarded to the lowest responsive and responsible seller who bids on all items. The initial term is twelve months, with the City's option to renew for up to four additional one-year periods. All services must be performed by Carrier Certified Technicians using new, first-quality products that meet original equipment manufacturer specifications. Bidders must submit their quotes via the PHLContracts portal by December 16, 2026, at 10:30 AM. Required documentation includes a Consent and Authorization Agreement, a Seller Checklist Form, and a Solicitation and Participation Form. The project establishes a total Small Business Enterprise (SBE) participation range of 16%. Additionally, sellers must provide demographic data on their workforce and board members, as well as disclose the percentage of female executive officers and board members. There is no specified set-aside status for this solicitation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

8 days ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS