This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on March 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

POTABLE WATER MAIN RUPTURE REPAIR AND REPLACEMENT AT USCG SECTOR ST. PETERSBURG

Closed
37130PR250000047Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract involves the repair and replacement of a ruptured 1 ½ inch copper nickel potable water main at USCG Sector St. Petersburg, Florida. It is a fixed-price, small business set-aside solicitation under NAICS code 237110, focusing on water and sewer line construction. The scope includes excavation, inspection, repair, backfilling, soil compaction, and concrete slab replacement, with the contractor responsible for all labor, tools, materials, transportation, and disposal, ensuring compliance with environmental laws. The work requires careful handling of materials, site safety measures, and adherence to federal, state, and local regulations, including OSHA standards. The project emphasizes safety, environmental protection, and security, with personnel identification and site access controls in place. The contract will be awarded based on best value, considering past performance and cost, with an anticipated award date approximately 10 days after the solicitation closes on April 10, 2025. A site visit is scheduled for March 25, 2025, and all questions must be submitted by April 4, 2025. The contractor must be registered in SAM and provide a detailed cost breakdown in their proposal.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Saint Petersburg, FL, 33701, USA

Set-Aside

SBA

Documents

2

Solicitation 37130PR250000047 - Potable Water Main Repairs

PDF, High priority: read this firstrfq
High

SOW - Potable Water Main Rupture Repair and Replacement - USCG Sector St. Petersburg

PDF, High priority: read this first10 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more
This combined synopsis/solicitation for services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued. The solicitation number is 37130PR250000047 Applicable North American Industry Classification Standard (NAICS) codes are: 237110 Water And Sewer Line and Related Structures Construction This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, Best Value. When submitting your proposals, request a price breakdown of the following: a. Cost of labor and supervision b. Cost of materials and equipment needed to perform the work. Prospective contractors shall also provide along with your proposal past performance documents which will be used to determine expertise to perform such work. Contract will be awarded to the vendor who can perform the work outlined in the provided SOW in the time frame needed by unit. Past Performance and Cost factors will also be used when selecting the award. Anticipated award date: 10 business days after close of solicitation, OOA 23 April 2025 ****Quotes are to be received no later than close of business (3 p.m. EST) on Thursday April 10, 2025. Quotes can be email to: Mehdi.Bouayad@uscg.mil Quotations sent via the US Postal Service or hand delivered should be sent to: Commanding Officer USCG Base Miami Beach (P&C) Attn: Mehdi Bouayad 16001 SW 117th Ave Miami, FL 33177 Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in Beta.Sam.Gov (SAM.gov | Workspace) ***** SITE VISIT**** Tuesday Mar 25, 2025 AT 09:00 AM EST AT PROJECT SITE (USCG Sector St. Petersburg) 600 8th Ave SE, St. Petersburg, FL 33701 POC: CWO Justin David Email: Justin.H.David@uscg.mil Phone: 619-788-7170 SCOPE OF WORK: SCOPE OF WORK Contractor shall provide all labor, tools, and replacement materials to conduct repairs to a ruptured 1 copper nickel schedule 40 potable water main and associated fittings. Work shall include excavation, inspection, repair, back fill, soil compaction, and rebar/concrete slab replacement. Source and location of leak has been identified and marked for visual reference. Remove and properly dispose of existing materials that need to be removed to access rupture in accordance with all applicable state and federal laws. Provide all transportation and disposal provisions. Contactor shall at no time dispose of any materials in the water. Contractor shall provide necessary tools, equipment and materials required to saw cut concrete slab on waterfront pier and excavate to a depth of 2-4 feet to access section of ruptured piping. Contractor shall perform inspections and operational verifications during installation services. This includes visual, environmental, mechanical, and functional verifications of the system. The contract can be modified with contracting officer approval only if further damages are discovered during excavation portion of this contract. Contractor shall be responsible for the removal of all trash and debris from project area upon completion. Contractor shall adhere to all local, state, and federal environmental regulations for entire duration of project. All work and/or contract modifications must be approved by the contracting officer only and be approved by the Contracting Officer's Representative CWO Justin H. David. Contractor shall be responsible for removal and reinstallation of all obstacles throughout the duration of contract. Upon completion contractor shall conduct flow and leak test pre and post back fill/concrete pour. Q&A's: Questions concerning the work requested must be sent to Mehdi.Bouayad@uscg.mil by COB (3 PM EST) on Friday 04 April 2025. These Q&A's will be answered and posted to this solicitation as an amendment prior to close of solicitation. STORM PROTECTION Should warnings of extreme weather (such as storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work. DELIVERY AND STORAGE Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment. RECEIPT OF MATERIALS Shipment of equipment, materials, and supplies shall be addressed to the Contractor - not the Government. The Contractor must be on hand to accept shipments; the Government will not accept shipments. CLEANUP The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials on a daily and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters. SECURITY Working Personnel List. The Contractor shall provide the COR CWO Justin David with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site. Personnel Identification. All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual's driver's license, or a company issued ID. The identification must be laminated, and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises. QUALITY Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications and lead and asbestos free. WARRANTIES All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government. General The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the service area, prevents damage to property and avoids work interruptions. The Contractor shall provide appropriate safety measures including but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations. Compliance The Contractor is specifically required to comply with the requirements of the U. S. Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the - Accident Prevention clause (FAR 52.236-13). Once accepted, this safety plan shall become part of the contract requirements. Note: This review/acceptance does not in any way relinquishes the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations. APPLICABLE FAR CLAUSES FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items). ATTACHED BY REFERENCE 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984) 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984) 52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995) Work hours: Monday through Friday, 0730 - 1800 (7:30 am - 6 pm) No weekends or Holidays authorized. See attached applicable FAR Clauses by reference. Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov. Request Company's Tax ID information and UEI number. Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an - ACTIVE status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award