Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Potter County — CSJ 6500-19-001 — May 2026 Letting — State-Let Maintenance

Closed
6500-19-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 12 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract for Potter County under solicitation number 6500-19-001 is a state-let maintenance solicitation issued by the Texas Department of Transportation for roadside mowing services along IH-40 in Potter and Randall Counties, with performance beginning in May 2026 and extending through October 2026. Work is scheduled with full mowing cycles in June, August, and October, and partial cycles in May, July, and September, with daily productivity rates of 46 acres for full cycles and 33 acres for partial cycles. The contract specifies that work starts on the 15th of each applicable month, adjusted to the following Monday if the 15th falls on a Sunday, and performance may be extended once but not beyond the original contract period. The scope of work is governed by TxDOT’s Standard Specifications effective September 1, 2024, and incorporates mandatory compliance with the Texas Manual on Uniform Traffic Control Devices, Departmental Material Specifications, and special provisions that override the standard specs in case of conflict. Inspections and final acceptance occur on-site by the TxDOT Engineer based on adherence to performance standards, traffic control requirements, and the approved Performance Review Plan, with liquidated damages applicable for missed deadlines. Contractors must comply with a range of state-specific certifications and restrictions, including verification through E-Verify for all new hires, a certification regarding non-participation in the boycott of Israel if the contract exceeds $100,000 and the business has 10 or more employees, and certification that they are not affiliated with any foreign adversary as defined under federal statutes. Additional requirements include adherence to data security protocols under Texas Business and Commerce Code §521.002, with subcontractors held accountable for data breaches, and submission of a Certificate of Interested Parties for contracts valued at $1 million or more, updated whenever changes exceed $1 million. Contractors must also certify no discrimination based on firearm affiliation, no illegal surveillance or intimidation of state officials, no unpaid child support obligations, and no bid collusion. While traditional federal procurement clauses such as FAR-based contract terms, detailed pricing tables, or formal evaluation factors are not present, the procurement follows state-directed procedures with binding special provisions and internal TxDOT forms. There is no specified contract value due to incomplete or inconsistent pricing data, and delivery terms do not apply as this is a service contract with no goods shipment. Contract administration responsibilities fall under the TxDOT Amarillo

General Info

Potter County roadside mowing contract via TxDOT starts May 2026, includes three full and three partial cycles, governed by 2024 specs and state compliance rules.

Place of Performance

Potter, TX, USA

Set-Aside

NONE

Documents

2

Potter 6500-19-001.pdf

PDF

Potter 6500-19-001 Proposal.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeTX, USA
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
Potter County — CSJ 6500-19-001 — May 2026 Letting — State-Let Maintenance

More opportunities from Texas Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
BRIDGE REPAIR
Solicitation # 6510-75-001
Solicitation 6510-75-001 is a contract issued by the Texas Department of Transportation for callout bridge structure repair on IH 20 and other roadways within Ector, Crane, Ward, Loving, Winkler, Midland, Stanton, Andrews, and Upton Counties. The scope of work involves non-site-specific repairs, including concrete structure and beam repairs utilizing carbon fiber reinforced polymer and strand splicing. The project is to be completed within 365 calendar days, with work executed via individual emergency or routine work orders issued by the Engineer. The contract is awarded to the lowest bidder, provided the bid is not mathematically unbalanced and the bidder complies with DHS E-Verify and other state and federal certifications, including nondiscrimination laws under 49 CFR 21 and various Texas Government Code boycott and discrimination prohibitions. Technical requirements mandate adherence to the September 1, 2024, Standard Specifications for Construction of Highways, Streets and Bridges and the Texas Manual on Uniform Traffic Control Devices. Specific quality standards include AWS D1.1, D1.5, and ANSI/AWS D1.3 for welding, and AASHTO LRFD specifications for steel bridge fabrication. All work is subject to inspection by Maintenance Supervisors, with payment requests certified by the Odessa Maintenance Office. Safety protocols require personnel to wear ANSI 107-2004 Class 2 or 3 high-visibility apparel. Compensation includes mobilization paid per county, while specific repair costs are negotiated and agreed upon prior to the commencement of work.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS