POWER SUPPLY, 24VDC,
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This contract is for the procurement of two 24VDC power supplies, identified by NSN 1680-01-519-7271 and Beckman Coulter part number 230-300-7052. The agreement specifies a delivery timeframe of 171 days after order, with a required delivery date of January 8, 2027, and a need ship date of February 12, 2027. Shipping is FOB Origin, with the final destination being DLA Distribution San Diego. The contract mandates strict adherence to DLA technical and quality requirements, including CMMC Level 2 self-assessment and specific sampling methods per MIL-STD-1916 or ASQ H1331. Packaging must comply with ASTM D3951 and MIL-STD-129, while palletization must follow RP001 requirements. Quality assurance is focused on destination inspection and acceptance, with a zero percent quantity variance allowed.
General Info
Agency
NAICS
Place of Performance
3581 CUMMINGS ROAD BLDG 3581, SAN DIEGO, CA, 92136-3581, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
POWER SUPPLY,24VDC,
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
RD002, COVERED DEFENSE INFORMATION APPLIES
RQ001: TAILORED HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS
(MANUFACTURERS AND NON-MANUFACTURERS)
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES
BECKMAN COULTER
CAGE 80740
P/N 230-300-7052
SAMPLING:
THE SAMPLING METHOD SHALL BE IN ACCORDANCE WITH MIL-STD-1916 OR ASQ
H1331, TABLE 1 OR A COMPARABLE ZERO BASED SAMPLING PLAN UNLESS OTHERWISE
SPECIFIED BY THE CONTRACT. IF THE APPLICABLE DRAWING, SPECIFICATION,
STANDARD, OR QUALITY ASSURANCE PROVISION (QAP) SPECIFIES CRITICAL, MAJOR
AND/OR MINOR ATTRIBUTES, THEY SHALL BE ASSIGNED VERIFICAITON LEVELS OF
VII, IV AND II OR AQLS OF 0.1, 1.0 AND 4.0 RESPECTIVELY. UNSPECIFIED
ATTRIBUTES SHALL BE CONSIDERED AS MAJOR UNLESS SAMPLING PLANS ARE
SPECIFIED IN APPLICABLE DOCUMENTS. FOR MIL-STD-1916, THE MANUFACTURER
MAY USE THE ATTRIBUTE OR VARIABLE INSPECTION METHOD AT THEIR OPTION OR
PER THE CONTRACT. MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT
SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT
UNLESS OTHERWISE SPECIFIED IN THE CONTRACT.
RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RD004: Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-Assessment RQ017: PHYSICAL INDENTIFICATION/BARE ITEM MARKING
BECKMAN COULTER, INC. 80740 P/N 230-300-7052
DLA issues this document using the DoD authorized unit of issue, please refer to the following URL to
SPE4A7-26-T-666A
SECTION B
PR: 7017914118 PRLI: 0001 CONT’D
determine the corresponding ANSI X12 unit of issue.
https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.dla.mil%2FPortals%2F104%2FDocuments% 2FDLMS%2FeApplications%2FLogDataAdmin%2FUnitofIssueandPurchaseUnit.xlsx&wdOrigin=BROWSELINK
CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE.
0001 7017914118 0001 EA 2.000
NSN/MATERIAL:1680015197271
DELIVERY (IN DAYS):0171
DELIVER FOB: ORIGIN
QTY VARIANCE: PLUS 0% MINUS 0%
INSPECTION POINT: DESTINATION
ACCEPTANCE POINT: DESTINATION
PREP FOR DELIVERY:
PKGING DATA-QUP:001
WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.
All DLA Master List of Technical and Quality Requirements take precedence over ASTM D3951. Mark and label all packaging and packing in accordance with MIL-STD-129. The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) will be as specified in the contract/purchase order. PALLETIZATION SHALL BE IN ACCORDANCE WITH RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
PARCEL POST ADDRESS:
SW3218
DLA DISTRIBUTION SAN DIEGO
3581 CUMMINGS ROAD BLDG 3581
SAN DIEGO CA 92136-3581
US
FOR TRANSPORTATION SEE DLAD DLAD PROC NOTE C19. FOR FIRST DESTINATION TRANSPORTATION SEE DLAD PROC NOTE
C20 AND CONTRACT
FREIGHT SHIPPING ADDRESS:
SW3218
DLA DISTRIBUTION SAN DIEGO
3581 CUMMINGS ROAD BLDG 3581
SAN DIEGO CA 92136-3581
US
Need Ship Date:02/12/2027 Original Required Delivery Date:01/08/2027
SPE4A7-26-T-666A NSN/Part Number: 1680-01-519-7271 Quantity: 2 EA Purchase Request: 7017914118QTY: 2 Delivery: 171 days ADO
Similar Contracts
Same NAICS industry code
More opportunities from Department Of Defense → ASC SUPPLIER OPER AE AND AF DIV
Same awarding agency
