This Sources Sought opportunity from Department Of Defense was posted on April 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Power Supply to South LAMS

Closed
FA568226QA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections to identify thermal anomalies, installing standardized external oil sampling devices to improve safety during collection, and performing detailed oil testing and analysis. Additionally, the selected contractor must provide on-site training for up to 20 agency staff members and develop comprehensive standard operating procedures. All work must adhere to NETA MTS standards, IEEE guidelines, NFPA 70E safety protocols, and ASTM D923 and D924 sampling requirements, with infrared inspections performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable offeror based on their project experience with utilities or industrial facilities, proposed staffing and methodology, personnel availability, and cost-effectiveness. Proposals must be submitted electronically via PlanetBids by December 23, 2026, at 3:00 pm. Required documentation includes a detailed project approach, a company profile, three references from the last five years, and various certifications including a Non-Collusion Statement and Workers Compensation Certificate. The contract will utilize fixed pricing with a not-to-exceed total value and requires the contractor to be registered with the Department of Industrial Relations as a public works contractor. Payment will be processed electronically via ACH within 30 days of invoice approval.
Inland Empire Utilities Agency

POSTED

about 7 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project scope requires a qualified electrical contractor to inspect, test, repair, and certify all emergency lighting systems, which includes inventorying fixtures, simulating utility outages for functional testing, and replacing ten failing or outdated ballasts with LED-compatible versions. Key deliverables include the application of durable, uniquely numbered labels to all fixtures and the integration of a recurring 30-day functional testing schedule into the facility's Computerized Maintenance Management System. All work must adhere to NFPA 101 (2024 Edition), NFPA 70, and OSHA safety regulations. The estimated contract value ranges between $25,000 and $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and will be awarded based on overall best value. Mandatory requirements for submission include a physical site visit, a detailed cost breakout on company letterhead, and a bid bond guarantee of 20% for bids exceeding $25,000. Awarded contractors must provide performance and payment bonds and comply with the Davis-Bacon Act, Federal Contractor Minimum Wage requirements, and various FAR clauses regarding small business utilization and security. This opportunity is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in about 1 month

General Info

Agency

Department Of Defense → FA5682 31 Cons (unit 6102)

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Campia Turzii, RO-CJ, 405100, ROU

Set-Aside

NONE

Documents

1

Power+Supply+to+South+LAMS+%28Statement+of+Work%29.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5682 31 Cons (unit 6102)
Contacts2 people available
OfficeAPO, AE, 09604-6102, USA
Organization / Agency
Department Of Defense → FA5682 31 Cons (unit 6102)
Office AddressAPO, AE, 09604-6102, USA
Contacts

Full Description

Show more

Statement of Work (SOW) / Performance Work Statement (PWS)


Project Title: South LAMS Electrical Power Supply Installation – Air Base 71, Câmpia Turzii, Romania


1.0 Purpose and Background


The purpose of this project is to design, install, test, and commission a permanent electrical power supply system for the South LAMS (Large Aircraft Maintenance Shelter) at Air Base 71, Câmpia Turzii, Romania. The new system will replace temporary generator‑based power and provide a stable, utility‑fed 120 kW supply to support aircraft maintenance operations.


The project includes trenching, conduit installation, underground cable routing, panel modifications, grounding and lightning protection upgrades, and full civil restoration. The installation is classified as Importance Category “C” under Romanian construction regulations, indicating a standard‑importance infrastructure system requiring compliance with national norms, safety standards, and quality assurance procedures.


2.0 Scope of Work


The contractor shall furnish all labor, materials, equipment, and supervision necessary to deliver a fully functional electrical power supply system. Work includes:


  • Installation of a 315 A switch (disconnector) in the existing electrical panel.
  • Excavation of a 156‑meter trench, 80–90 cm deep, along the designated route.
  • Placement of sand bedding and installation of Ø110 mm protective conduit.
  • Installation of underground copper power cables sized for a 120 kW load.
  • Installation of a new external electrical panel with a 250 A switch and revenue metering.
  • Construction of a grounding electrode system using OL‑Zn electrodes and galvanized flat bar.
  • Lightning protection and low‑voltage electrical installations.
  • Civil engineering works and full site restoration.

3.0 Requirements


3.1 Electrical Power Supply


  • Installed electrical power: 120 kW
  • Maximum absorbed power: 110–120 kW/kVA
  • Power factor: 0.92
  • Utilization voltage: 230/400 V, 50 Hz

3.2 Trenching & Conduit Installation


  • Excavate a trench 156 meters in length, with a finished depth of 80–90 cm, ensuring compliance with IEC 60364‑5‑52 and Romanian underground cable installation norms.
  • Provide a 10 cm sand bedding layer at the trench bottom prior to conduit placement.
  • Provide HDPE or PVC conduits, minimum Ø110 mm, suitable for underground electrical installation.
  • All phase conductors (L1, L2, L3) and neutral (N) shall be installed together within the same conduit or in grouped conduits arranged to maintain close physical proximity, in accordance with IEC 60364-5-52, to prevent inductive heating and impedance imbalance.
  • Provide two (2) additional Ø110 mm HDPE or PVC conduits along the full trench length for future expansion. Spare conduits shall be installed parallel to the primary conduit with proper spacing and shall be fully usable (no crushed, blocked, or discontinuous sections).
  • Maintain required horizontal and vertical separation from existing utilities; contractor is responsible for utility locating and avoidance.
  • After conduit installation, place 10 cm sand cover above the conduits, achieving a total sand thickness of 20 cm (approx. 12.48 m³).
  • Install approved warning tape at standard depth above the sand layer along the entire trench.
  • Backfill with native soil, compacted in layers, and restore all disturbed surfaces (soil, gravel, asphalt, pavers) to original condition.

3.3 Cable Installation


  • Install underground copper NYY single-core power cables rated for direct burial or conduit installation, sized for a 120 kW load at 400v, 3-phase, 50Hz:
    • 3 × 1×240 mm² (L1, L2, L3)
    • 1 × 1×120 mm² (Neutral)
  • Cables shall be installed together within the conduit system in a trefoil or closely grouped configuration to minimize electromagnetic effects and comply with IEC installation practices.
  • Provide minimum of 20 meters of additional cable length (10 m at each end) to allow for service loops, pulling requirements, and termination inside the existing panel and new subpanel.
  • Pull cables using rollers, lubricants, and approved methods to prevent insulation damage.
  • Minimum bending radius shall comply with cable manufacturer specifications.
  • Identify all conductors at both ends using permanent phase labeling
  • Perform insulation resistance testing and continuity checks prior to energization.
  • Install a dedicated grounding conductor along the trench, including redundant grounding paths per reviewer comments.
  • Ensure cable installation accounts for voltage drop over 156 m distance.

3.4 Electrical Panels


  • Modify the existing electrical panel to install a 315 A disconnector, including all internal wiring adjustments required for safe and compliant integration.
  • Install a new external electrical panel at the designated location, mounted on a reinforced concrete foundation sized to manufacturer requirements.
  • The new electrical panel shall be designed, manufactured, and certified in full compliance with IEC 61439 (Low‑Voltage Switchgear and Controlgear Assemblies) and shall include:
    • 250 A disconnector
    • IP54 minimum enclosure rating
    • Certified 3‑phase revenue metering unit
    • Surge protection devices (SPDs), labeling, and breaker configuration in accordance with IEC 60364 and IEC 61643
  • Provide all required terminations, lugs, labeling, and panel identification plates, ensuring workmanship and materials meet IEC and Romanian standards.

3.5 Grounding & Lightning Protection


  • Construct a grounding electrode system consisting of:
    • 25×4 mm galvanized steel flat bar
    • 1.5 m OL‑Zn electrodes (3.8 kg)
  • Install redundant grounding conductors to ensure equipotential bonding between the existing panel, new subpanel, and LAMS structure.
  • Achieve a grounding resistance of Rp < 4 ohms, verified through certified earth resistance testing.
  • Install lightning protection and bonding in accordance with Romanian regulation and the IEC 62305.

3.6 Safety & Occupational Health


  • All work must comply with Romanian and EU safety regulations, including:
    • Law 319/2006 (Occupational Safety)
    • GD 1425/2006
    • GD 300/2006
    • Law 307/2006 (Fire Defense)
  • Electrical work must be performed de‑energized, following LOTO procedures.
  • Trenches must comply with safe excavation standards.

3.7 Environmental Protection


  • Comply with GEO 195/2005, Law 211/2011, and GD 856/2002.
  • Manage waste (soil, concrete, asphalt, metals) per regulations.
  • Restore all disturbed areas to original condition.
  • Minimize dust, noise, and vibration during construction.

4.0 Deliverables


The contractor shall provide:


  • Fully installed and operational electrical supply system.
  • New electrical panel with breaker, metering, and labeling.
  • Completed trench, conduit, cable, and grounding system.
  • Testing & commissioning documentation, including:
    • Insulation resistance tests
    • Continuity and phase sequence checks
    • Earth resistance measurements
    • Functional load tests
  • As‑built drawings (PDF + editable format).
    • Exact horizontal location of all conduits, trenches, manholes, and access points.
    • Depth profile along the full 156 m route.
    • Final conduit configuration, including spare conduits.
    • Locations of bends, junctions, and any deviations from the design.
    • Grounding electrode locations and bonding paths.
    • Panel locations, cable entry points, and termination details.
  • Material certificates and warranties.
  • O&M briefing notes.
  • Daily work reports are required and must be submitted in PDF format.
  • Includes a one‑year warranty on all electrical line work.

5.0 Period of Performance


  • The construction phase shall be completed within 45 working days after all materials are available on site.


  • Weather delays caused by heavy snow, frozen ground, or severe storms may extend the schedule and will be coordinated through the contracting officer.

6.0 Place of Performance


Air Base 71, RoAF Câmpia Turzii, Romania


Work occurs along the designated 156 m trench route and at the South LAMS location.




7.0 USAF & RoAF Assistance


The USAF and RoAF will provide coordination, site access, and utility marking support as required.


8.0 Contractor‑Furnished Equipment & Materials


The contractor shall provide all labor, materials, and equipment, including:


  • Excavators, compactors, cable pulling equipment
  • Copper power cables (1×240 mm², 1×120 mm²)
  • Protective conduit Ø110 mm
  • Sand bedding
  • 315 A and 250 A disconnectors
  • LV subpanel and metering unit
  • Grounding materials
  • Traffic management equipment
  • All consumables, labels, connectors, and accessories

9.0 Acceptance Criteria


  • Electrical system installed per approved design and Romanian/EU standards.
  • Grounding resistance Rp < 4 ohms.
  • Successful completion of all testing and commissioning.
  • Site restored to original condition.
  • Final inspection and acceptance by the USAF project officer.

10.0 Security Requirements


  • All personnel must comply with USAF and RoAF access procedures.
  • RoAF requires seven working days’ advance notice to process base access requests for Romanian nationals.
  • Work areas must remain secured and controlled at all times.

11.0 Safety


  • PPE is mandatory.
  • LOTO procedures must be strictly followed.
  • Trenches must comply with safe excavation standards.
  • Winter safety measures must be implemented.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS