Power Your Drive Charging Station Installation by Dole Fresh Fruit at Tenth Avenue Marine Terminal
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Dole Fresh Fruit plans to install an electric vehicle charging station at the Tenth Avenue Marine Terminal in San Diego, California, as part of a small-scale initiative to support the transition from diesel to electric cargo handling equipment under the Maritime Clean Air Strategy. The project involves placing a 48-inch by 54-inch EV charger skid, equipped with built-in steel bollards, next to Substation 1, with the charger mounted using existing terminal cargo handling equipment. Electrical connections will be made via an above-ground cable tray running conduit from the substation to the charger, accompanied by the installation of a new Cutler Hammer HLD3300 circuit breaker into an available slot in the substation and the addition of load monitors to the existing switchboard. An all-in-one charging dispenser will be integrated into the unit, and no excavation or trenching is required. Power to Substation 1 will be temporarily shut off for one day during construction, which is scheduled for Summer 2026 and expected to be completed in a single day using only hand tools and on-terminal equipment. The project’s minimal scope ensures negligible impacts on traffic, air quality, and greenhouse gas emissions, and Dole Fresh Fruit will be responsible for compliance with all federal, state, and local regulations concerning construction debris, hazardous materials, and stormwater management.
General Info
Agency
NAICS
Place of Performance
San Diego, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
