Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Wireless Permit No. 25-003, Coastal Development Permit No. 25-095, and Categorical Exemption No. 25-184

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Malibu has issued Wireless Permit No. 25-003, Coastal Development Permit No. 25-095, and Categorical Exemption No. 25-184 for the modification of an existing T-Mobile wireless facility. The project is located at 23816.5 Malibu Crest Drive on a Southern California Edison wood utility pole, identified as SCE Pole ID No. 4553030. The scope of work involves removing one panel antenna, one mounting arm, and one equipment shroud to install a new side-mounted antenna approximately eight inches in diameter, along with cabling, an electrical shutoff switch, and associated equipment. Additionally, existing radio equipment within the underground equipment vault will be replaced in-kind with a new radio unit. All improvements are restricted to the existing pole and underground vault, with no changes to the height, dimensions, or footprint of the 43-foot pole. The project explicitly prohibits any excavation, trenching, or the installation of new ground-mounted equipment. The project is claimed exempt under CEQA Guidelines Sections 15301(e) and 15303(e), with no significant environmental impacts anticipated. In addition to the permits issued by the City of Malibu, the applicant must obtain the necessary permits from Southern California Edison for the use of the utility pole.

General Info

City of Malibu permits T-Mobile to modify wireless equipment at 23816.5 Malibu Crest Drive.

Place of Performance

Malibu, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Malibu
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Malibu
Office AddressN/A
Contacts
Gail DuncanAdministrative Assistant
Yolanda BundyCommunity Development Director

Full Description

Show more
An application to modify an existing T-Mobile wireless facility on a Southern California Edison wood utility pole located along a private road within the 23800 block of Malibu Crest Drive. The project would remove one panel antenna, one mounting arms, and one equipment shroud, and would install one new side-mounted antenna (approximately eight inches in diameter), along with cabling, an electrical shutoff switch, and associated equipment. Existing radio equipment in the underground equipment vault would be replaced in kind with a radio unit. The existing 43-foot wood utility pole (SCE Pole ID No. 4553030) and underground vault would remain in place with no change in height, dimensions, or footprint. No excavation, trenching, or new ground-mounted equipment is proposed. All improvements would occur on the existing pole and within the existing underground vault. In addition to City-issued permits, the applicant is required to obtain permits for use of the pole by Southern California Edison.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
BLUE BIRD EXPANSION
Solicitation # PE-33552-NONST-2027-000000021
The Fort Valley Utility Commission is soliciting sealed bids from experienced and licensed contractors for a labor-only contract to construct the electric primary feeder system for the Blue Bird Expansion Project in Fort Valley, Georgia. The scope of work involves the installation of a 7.2 kV phase-to-ground and 12.47 kV phase-to-phase three-phase underground electric distribution system. Key components include the installation of underground primary cable and conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding, and the subsequent testing and commissioning of the system. The project supports a significant site expansion featuring a 918,390 square foot building and a 39,474 square foot building. Under this labor-only agreement, the Fort Valley Utility Commission will provide all major electrical materials, while the contractor is responsible for providing all supervision, qualified personnel, construction equipment, tools, transportation, and safety equipment necessary for completion. All work must adhere to ECG Construction Assembly Specifications, FVUC standards, NESC, OSHA, Georgia 811, and all applicable federal, state, and local regulations. A mandatory pre-bid meeting is scheduled for November 2, 2026, at 10:00 AM at 500 Anthoine Street, Fort Valley, Georgia, with a final response deadline for bids on November 10, 2026. The final completion date will be determined by Parrish Construction and Blue Bird.
Fort Valley Utility Commission

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
International
Electric Utility Construction & Maintenance Services
Solicitation # 2026-093
The City of Red Deer has issued Request for Proposals 2026-093 for Electric Utility Construction and Maintenance Services, focusing on overhead and underground distribution linework. The selected contractor will be responsible for installing, upgrading, and modifying electrical distribution infrastructure, ranging from major capital projects like feeder rebuilds and new residential subdivisions to supporting City crews during vacation seasons and emergency responses. The contract features an initial one-year term with the City holding sole discretion to extend for up to four additional years in one-year increments. While the solicitation establishes a framework for services, it does not guarantee a minimum contract value. Proponents are evaluated through a multi-stage process involving mandatory requirement reviews, rated criteria scoring, and potential interviews, with the highest-ranking proponent receiving the award. Evaluation categories include the River Crossing Project scope, summer and winter labor and equipment rates, company history, safe work practices, and quality manuals. Successful bidders must provide a performance bond via certified cheque or letter of credit and adhere to strict safety and quality standards, including compliance with the Alberta Electrical Utility Code and the Occupational Health and Safety Act. Key deliverables include project execution plans with Gantt charts, final sag tension records, and comprehensive closeout packages containing GPS survey data and installation inventory. All invoices must include purchase order numbers and separate GST, with standard payment terms set at 30 days from receipt.
City of Red Deer

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Power Delivery General Engineering Services
Solicitation # 20260925052
The City of Pasadena Water and Power Department is soliciting proposals under RFP 2026-RFP-0300 to establish a pool of qualified professional engineering firms for Power Delivery General Engineering Services. The contract aims to provide supplemental support for the operation, maintenance, and modernization of the electric power delivery system across six specific scope of work groups: substation design, SCADA/automation and control, system planning, civil and structural engineering, electric vehicle charging infrastructure, and renewable energy and energy storage. The resulting agreement will have an initial five-year term with three optional one-year extensions, with work authorized through individual task orders on a lump-sum or time-and-materials basis. Qualified firms must demonstrate at least five years of relevant experience and five completed projects within the last five years for each group they bid on, and staff must include engineers registered in the State of California. Proposals are due by October 22, 2026, and must be submitted electronically via the City's eProcurement Portal in two separate volumes: a technical proposal and a price proposal. Evaluation is based on a weighted system consisting of qualifications (35%), cost (20%), and preferences for local Pasadena businesses (5%) and certified small or micro-businesses (5%). Selected contractors must comply with California prevailing wage laws, ADA accessibility standards, and specific cybersecurity requirements for SCADA systems. Invoicing is managed through the City's Vendor Invoice Portal with a 30-day payment term.
City of Pasadena

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS