Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on September 16, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pratt River Trail Connector #1035 Relocation

Awarded
AG-05M6-S-10-0060Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation AG-05M6-S-10-0060 is a negotiated request for proposals issued by the Mt Baker Snoqualmie National Forest, specifically the Snoqualmie Ranger District in King County, Washington. The project involves the construction and relocation of the Pratt River Trail Connector #1035. This procurement is designated as a 100 percent set-aside for certified HubZone businesses. The scope of work encompasses comprehensive trail reconstruction activities, including clearing and grubbing, excavation, the installation of drain dips, rock retaining walls, puncheon, and stream fords, as well as mobilization and specialized bridge or ford work. The project is governed by the USDA Forest Service Region 6 standard specifications for trail construction and maintenance in the Pacific Northwest. Technical requirements are detailed through specific relocation drawings and guidelines covering trail cross sections, clearing limits, and fish protection blasting guidelines. The solicitation underwent two amendments to refine the description of work, update the schedule of items, and modify regulations regarding the use of motorized equipment. Bidders are required to provide a bid bond to guarantee the execution of the contract upon acceptance.

General Info

Contract Value

$219,361.3

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

King County Snoqualmie Ranger District Mt. Baker Snoqualmie National Forest, WA, USA

Set-Aside

NONE

Award Issued Date

Documents

8
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low
PDF, Low priority2 pages · bid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts1 person available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA
Contacts
Bonnie L. ChildsContract Specialist

Full Description

Show more
This project involves the relocation of approximately 3/4 mile of the Pratt River Trail. The intent is to award a contract with a Base plus one Option Item. Work includes clearing, grubbing, and excavation, blasting,streamford construction, and the installation of a variety of drainage structures, and surfacing. Several sections involve constructing trail in bedrock. Blasting will be necessary. The project is located in the Middle Fork Snoqualmie River drainage, and is inside of newly designated wilderness. The trailhead is approximately 12 miles north of the town of North Bend, Washington, in the Middle Fork of the Snoqualmie River Valley. Drive Interstate 90 east from Seattle or Bellevue to Exit 34. Turn left, travel 1/4 mile to the Middle Fork Road (FSR #56). Park at the Middle Fork Trailhead. Hike the Middle Fork Trail approximately 300 feet, crossing the arched bridge. The project begins at the end of the bridge, to the right and downstream. Estimated issue date for the solicitation is on or about July 15, 2010. Estimated start work date is August 06, 2010 with all work to be completed by November 15, 2011.The government estimated price range is between $100,000.00 and $250,000.00. The project is 100% set aside for HUBzone small business. Bonding will be required for this project. The technical contacts for this project are Bill Sobieralski at North Bend, who can be reached at +1 (555) 000-0000 or Kathy White at +1 (555) 000-0000. Interested parties can download a copy of the Solicitation documents from this website when they are available.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS