Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Advertisement Notice for Path 400 Trail Extension (#1038)

Closed
State & Local
Submission Closed
Solicitation #
PE-66062-NONST-2026-000000431

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
EN27NAN619 South Island Forest District Road & Bridge Maintenance
Solicitation # EN27NAN619
The EN27NAN619 contract is a general works agreement issued by the Ministry of Forests for the South Island Forest District in British Columbia, Canada. The scope of work involves routine maintenance, road reactivation, and repairs of Forest Service roads, bridges, and culverts, including the installation of major culverts and bridges and a 24-hour emergency response requirement for storm damage. The contractor is responsible for providing all necessary manpower, equipment, accommodations, and transportation, with specific work assignments managed by a Ministry Representative. The agreement is dated for reference January 11, 2027, and contracts are awarded on an annual basis. The contract is awarded to the lowest compliant bidder, with ties resolved via a draw using Random.org. Bidders must be eligible to work in Canada and must be certified in the BC Forest Safety Council SAFE Company program. Evaluation factors include total bid price, compliance, and a review of business organization, qualifications, and experience. Financial security requirements include a performance bond and a labour and material payment bond, each valued at at least 50% of the total contract price. Payment is processed through monthly applications certified by the Ministry Representative. There is no specified set-aside status for this solicitation.
Ministry of Forests

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT
Solicitation # MCP 2026-07
The MCP 2026-07 Cascade Canyon Trail Bridge Project is a construction solicitation issued by the Marin County Open Space District for improvements at the Cascade Canyon Open Space Preserve in Fairfax, CA. The scope of work involves the installation of two clear-span steel bridges above the 100-year flood elevation of San Anselmo Creek, featuring a primary 90-foot long, 6-foot wide prefabricated weathered steel connector style truss bridge with a redwood deck and a second 60-foot bridge located approximately 1,000 feet upstream. Additional requirements include the construction of concrete spread footings, installation of engineered fill, repair of rock riprap slope protection, and the creation of compacted road and trail surfaces. The engineer's estimate for the project is $900,000, with a required completion date for all on-site construction by October 15, 2027. Bids are due by December 3, 2026, at 2:00 PM PST and must be submitted electronically via Bid Express or as sealed paper bids. To be considered responsible, bidders must demonstrate financial strength, provide a list of at least three similar or larger bridge projects, and have successfully completed at least five similar projects in the San Francisco Bay Area. The contract requires a bid bond of 10% of the total bid, as well as performance and payment bonds. Insurance requirements include $2,000,000 in Commercial General Liability and $1,000,000 in Automobile Liability. Contractors must adhere to California prevailing wage rates and submit a Subcontractor Debarment and Suspension Certification. There is no set-aside status for this solicitation.
County of Marin

POSTED

about 22 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The City of Atlanta’s Department of Transportation is initiating a multi-step sealed bid process for the construction of the PATH400 Peachtree Park and Adina Drive segments, a 0.47-mile multi-use trail and cycling infrastructure project. The work includes concrete trails, side paths, on-street cycle tracks, drainage enhancements, traffic control systems, ADA-compliant features, signage, pavement markings, erosion control, demolition, and site restoration, all aligned with City of Atlanta specifications, GDOT standards, and approved construction plans. Vendors must first undergo a pre-qualification phase to demonstrate proven experience in delivering similar transportation and trails projects, with emphasis on safety, schedule adherence, and regulatory compliance. Selected contractors will be expected to provide strong project management, coordinate extensively with utilities and other stakeholders, and ensure full compliance with state and federal requirements. The solicitation, numbered PE-66062-NONST-2026-000000431, was posted on June 23, 2026, with a response deadline of July 23, 2026, at 1:00 PM. A pre-solicitation conference will be held to clarify requirements and respond to vendor inquiries. The project is being managed by the City of Atlanta under the Georgia state agency structure, with Todd Stratton listed as the primary point of contact for inquiries. All work must be performed within Georgia, and vendors are expected to meet the City’s high standards for quality, accessibility, and timely delivery in the execution of this infrastructure enhancement.

General Info

Atlanta seeks qualified contractors to build 0.47-mile multi-use trail with ADA compliance, drainage, and cycling infrastructure by July 23, 2026.

Place of Performance

GA, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstsow
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecial-provision
High
PDF, High priority: read this firstsow
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

12 mandatory

13 requirements in 8 areas

  • Eligibility2 · 2 must
    002

    GDOT Prequalification certification

  • Compliance2 · 2 must
    005

    Contract term and renewal

  • Technical2 · 2 must
    007

    Sidewalk and lane closure applications

  • 10 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 13 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 3 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 18 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Atlanta
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Atlanta, on behalf of the Department of Transportation, will shortly undergo a Multi-Step competitive Sealed Bid process comprised of a pre-qualification phase, followed by an Invitation for Bid (IFB) for the construction of the PATH400 Peachtree Park and Adina Drive segments. The project consists of approximately 0.47 miles of multi-use trail and cycling infrastructure, including concrete trails, side paths, on-street cycle tracks, drainage improvements, traffic control, utility coordination, ADA-compliant features, signage and pavement markings, erosion control measures, demolition and restoration work, and all associated construction activities necessary to complete the project in accordance with City of Atlanta specifications, GDOT standards, and approved construction plans. Interested vendors during the prequalification phase should be prepared to demonstrate experience in the construction of multi-use trails, shared-use paths, bicycle facilities, streetscape and transportation infrastructure projects of similar size and complexity. The City's expectation is to identify vendors capable of delivering the PATH400 Peachtree Park and Adina Drive segments safely, on schedule, and in accordance with the approved plans and specifications. Selected vendors will be expected to provide effective project management and coordination while maintaining compliance with all applicable City of Atlanta, GDOT, and ADA requirements. A Pre-Solicitation Conference will be noticed and held to provide more details and address questions. We hope to see you there.

More opportunities from Georgia → City of Atlanta

Same awarding agency

NAICS: 541370
SLED
Geotechnical Testing, Investigation Services & Topographically Surveying Services
Solicitation # PE-66062-NONST-2027-000000525
The City of Atlanta, on behalf of the Department of Watershed Management, is seeking qualified firms for an annual contract to provide professional services including geotechnical engineering, subsurface investigations, environmental site assessments, construction materials testing, topographical and land surveying, and subsurface utility engineering. The scope includes Phase I Environmental Site Assessments consistent with CERCLA, soil sampling, wash boring, and diamond rock coring. All work must be performed within the City's service areas, with the requirement that firms be available for field work during non-business hours, weekends, or holidays to avoid disruptions. To be deemed a responsible and responsive proponent, firms must hold a current Georgia Utility Contractor's License and have successfully completed three similar projects within the last seven years. Key personnel requirements include a Project Manager with two similar contracts in the last seven years, a QA/QC Manager with ten years of experience, and a certified Site Safety Officer. Safety standards are strict, requiring an average Experience Modification Rate (EMR) not exceeding 1.0, a Total Recordable Case Rate of 3.6 or less, and an Injury and Illness with Lost Work Days rate of 0.9 or less over the last three years. Additionally, proponents must comply with Equal Business Opportunity and Equal Employment Opportunity requirements, including non-discrimination policies and M/FBE participation goals.
Surveying and Mapping (except Geophysical) Services

POSTED

12 days ago

DEADLINE

in 18 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS