Pre-Construction Planning & Design Coordination

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Setback Levee Projects - Architecture and Engineering Services
Solicitation # 2026-RFQ-260
Pierce County Planning and Public Works is soliciting architecture and engineering services for setback levee projects along the Puyallup River under solicitation 2026-RFQ-260. The scope of work involves the refinement of alternatives from a 2023 feasibility study and the development of full plans, specifications, and cost estimates for the NE, SW, and NW quadrants, as well as 30 percent plans for the SE quadrant. Specific technical requirements include engineered bio-revetments, log jams, habitat features, and existing levee removal. Because the county has obtained most property rights for the NE quadrant, that section is expected to accelerate into construction ahead of other projects. The selected consultant must also provide a Delivery Strategy Plan covering funding, permitting, and construction timelines. The contract is anticipated to have an initial 12 month period with an option for a three year renewal. Award selection is based on the most qualified team, evaluated through a points based system involving statements of qualification, interviews, and reference checks. Proposals must be submitted electronically by November 25, 2026, and must not exceed 20 pages. Key compliance requirements include adherence to RCW 39.12 prevailing wage laws, a minimum CGL insurance limit of 1 million dollars per occurrence, and a commitment to MWV business participation. Payments will be processed through the county voucher system.
Planning and Public Works

POSTED

about 1 hour ago

DEADLINE

in 19 days
NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is seeking professional design services for the Etnies Skatepark Improvement Project (25P03) located at 20028 Lake Forest Drive. The selected consultant will refine two preliminary concept designs into a final concept and develop a complete, permit-ready, and bid-ready construction package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to the street lane, plaza, and various bowls, the replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing building renovation project and develop a construction phasing plan that minimizes operational disruptions. The contract is structured on a time and materials, not-to-exceed basis, with monthly invoicing and a 30-day payment term. Award selection is based on a multi-phase evaluation involving mandatory compliance checks, a qualitative proposal review, and a weighted final score consisting of interviews (80 percent) and cost proposals (20 percent). Requirements include the identification of key personnel such as a Project Manager, Lead Skatepark Designer, and Civil Engineering Lead, all of whom must hold necessary California professional licenses. Additionally, the consultant must comply with California prevailing wage laws, register with the Department of Industrial Relations, and ensure all designs meet ADA standards. Proposals are due by December 4, 2026, via the City's eProcurement portal.
Public Works

POSTED

about 2 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

This subcontract opportunity, issued by the Maryland Department of General Services, seeks a provider to deliver pre-construction planning and design coordination for the MSD Frederick Campus project. The scope of work focuses on essential preparatory services, including the development of phasing plans, detailed cost estimating, design coordination, and the production of BIM and CADD deliverables. The solicitation was posted on December 5, 2025, with a response deadline of December 16, 2025. Classified under NAICS code 541330, the contract is intended to ensure technical and financial alignment before the primary construction phase begins at the Frederick Campus facility.

General Info

Agency

Maryland → Department Of General Services

Place of Performance

MD, USA

Set-Aside

NONE

Documents

This scope was carved out of BPM053842.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

A-000-201-001 - Maryland School for the Deaf (MSD) Frederick Campus Dormitories, Student Center, & Satellite Student Health Center

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Department Of General Services
ContactsNo contacts available
OfficeN/A
Organization / Agency
Maryland → Department Of General Services
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide pre-construction services including design coordination, phasing plans, cost estimating, and BIM/CADD deliverables for the MSD Frederick Campus project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS