Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Vermont was posted on March 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-Engineered Steel Frame Erection

Closed
State & Local
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
SLED
McIntosh Power Plant Security Barrier Wall
Solicitation # 2026-RFP-138
The City of Lakeland is seeking a qualified contractor for solicitation 2026-RFP-138 to install a precast concrete security barrier wall approximately 3,916 feet long at the McIntosh Power Plant located at 3030 E. Lake Parker Drive, Lakeland, Florida. The wall must be 10 feet high with columns generally spaced 20 feet apart, hurricane rated for the local wind zone, and feature visually appealing finishes on both faces. The contractor is responsible for providing all engineering, drawings, color renderings, permits, materials, equipment, labor, and supervision. Work must begin within 30 days of the Purchase Order issuance and be completed within 90 days of the first ground break. Proposals are evaluated on a total score basis of 100 points, focusing on the quality of the closure construction plan, pricing, safety performance records (expecting a 5-year average TRIR of 1.0 or less), reference strength, and team qualifications. Bidders must provide a total firm fixed price and a bid bond or certified check of at least 5% of the price. Required documentation includes a State Certified License (CGC or CBC), IRS Form W-9, Sunbiz registration, and a signed Hold Harmless agreement. Payment is based on a schedule of values and a Critical Path Method schedule, subject to a 10% retainage. There is no specified set-aside status for this solicitation.
LE - Engineering

POSTED

3 days ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Department of Economic Development for Vermont is seeking a subcontract for the supply and installation of a pre-engineered steel frame. The scope of work includes the provision and erection of columns, beams, and bracing systems under NAICS code 238120. The solicitation was posted on March 11, 2026, with a response deadline of April 30, 2026. There is no specific set-aside status designated for this opportunity.

Documents

This scope was carved out of 73463.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MIL DEPT - EAAFB Museum Addition

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Decorative Metal Fencing and RailingsOpen now, due in 19 days
  • Structural Steel & Industrial Painting ContractorOpen now, due in 62 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of pre-engineered steel frame including columns, beams, and bracing systems.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 423310
New
SLED
2027 Northeast Region State Parks Firewood
Solicitation # 77330
The State of Vermont, through the Department of Forests, Parks and Recreation, is soliciting bids for the supply and delivery of high-quality camping firewood for the 2027 operating season. The primary goal of this program is to provide reliable, affordable firewood to park visitors to deter the cutting of park trees and prevent the spread of invasive species, such as the Emerald Ash Borer. The contract will commence within 30 days of award and end on April 23, 2027, with the possibility of two additional one-year extensions. Bids are due by January 20, 2027, and will be evaluated based on cost per cord, value-added services, delivery responsiveness, load size optimization, and previous service history. The scope of work involves delivering kiln-dried firewood to various Northeast region state parks, including Maidstone, Brighton, Little River, Smugglers’ Notch, New Discovery, Ricker Pond, Stillwater/Big Deer, and Seyon Lodge. Firewood must be between 13 and 16 inches in length, with a maximum thickness of 6 inches, and must not exceed 25% moisture content upon delivery. Treated firewood must be certified and meet specific heat treatment standards, maintaining a core temperature of 160 degrees Fahrenheit for at least 75 minutes. Deliveries must be completed within seven calendar days of a request during normal park hours. Payment terms are net 30 from the date of invoice. There is no specific set-aside status for this solicitation.
Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS