Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on March 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SBU / Atlantic Hall Boiler Replacement - Structural Steel

Closed
SUNY-25/26-059MCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6-meter wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached, while also performing structural repairs to anchor bolts and roof materials. All work must comply with the National Parks Act, the Fisheries Act, and the 2025 National Building Code of Canada. The project is scheduled to be performed during the off-season when the tower is closed, with a final completion deadline of March 31, 2027. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan. Bidders must follow a strict two-submission process, providing the Indigenous Participation Plan as Submission 1 and the Bid and Acceptance Form as Submission 2. Official bids must be submitted via email to [email hidden] or by fax to [phone hidden] by the closing date of October 29, 2026, at 2:00 PM NDT. Submissions via SAP Ariba, courier, or in-person will not be accepted. Contractors are required to implement comprehensive site-specific health, safety, and environmental plans, including spill control and resource protection, and must provide security personnel to guard the site after working hours.
Parks Canada Agency

POSTED

1 day ago

DEADLINE

in 6 days
NAICS: 238120
New
SLED
New Combination Harford Academy and Elementary School: 05A Package–STEEL
Solicitation # HRM-26-3
The Board of Education of Harford County is soliciting sealed, lump-sum bids for the 05A Package-Steel for the construction of the New Combination Harford Academy and Elementary School located at 1605 Eva Mar Boulevard, Bel Air, Maryland. This project, estimated at approximately 150 million dollars, requires the provision of all labor, materials, equipment, and services for the steel package, including a base bid and several add alternates for classroom additions and floor finishes. Bids are due by 2:00 p.m. local time on October 29, 2026, at the Harford County Public Schools Planning and Construction Department Facilities Training Center. The contract emphasizes strict compliance with the Buy American Steel Act and Maryland prevailing wage standards. A Minority Business Enterprise goal of 15 percent is established, with a specific 8 percent subgoal for African American subgroups. Bidders must provide a bid bond of at least 5 percent of the combined bids, and the awarded contractor must provide 100 percent performance and payment bonds. Logistics are critical, as the project requires a phased, just-in-time delivery of structural steel, with materials not to be delivered to the site more than 14 calendar days before scheduled erection. Evaluation is based on the lump sum bid adjusted by unit price bids and alternates, with a preference order for award given to Harford County bidders, followed by out-of-county Maryland bidders. The contract includes a liquidated damages provision of 1,000 dollars per calendar day for delays beyond completion dates. Contractors must adhere to the T.J Vinton Schafer Safety Manual and the Construction Manager's Quality Control Program, and they must submit monthly LEED template updates to avoid payment holds. Required submission documents include the MBE Utilization and Fair Solicitation Affidavit, the Affidavit of Qualification to Bid, and a bid bond.
Harford County Public Schools

POSTED

1 day ago

DEADLINE

in 1 day

General Info

Documents

1

25/26-059MC Atlantic Hall Boiler Replacement Structural Steel IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState University of New York
Contacts1 person available
OfficeNY
Organization / AgencyState University of New York
Office AddressNY
Contacts
Jill Mccahill

Full Description

Show more
Overview: This Event is issued by the State University of New York at Stony Brook (herein after referred to as "SUNY”) to solicit proposals to provide and install all labor and materials as required to construct a new structural steel equipment platform on the existing low flat roof of the SUNY at Stony Brook, Southampton Campus, Library Building. This work will support the ongoing boiler replacement at Atlantic Hall (adjacent building). Work includes but is not limited to: new structural steel equipment platform; reinforcement of the existing roof structure (interior); incidental roofing work to install the new equipment platform; and rigging of new equipment. The contractor shall coordinate all of their work with ongoing work being completed by the University, as herein described delivered NET FOB Destination in accordance with SUNY at Stony Brook bid# 25/26-059MC and Exhibits A (Standard Contract Clauses), A-1 (Affirmative Action Clauses), Exhibit D (Non-Collusive Bidding Certification), Exhibit M (MWBE Forms), Exhibit N (Subcontracting Form), Exhibit L (Procurement Lobbying Law), Exhibit SDVOB (Service-Disabled Veteran-Owned Business), Exhibit R (Certification Under Executive Order No.16), Exhibit T (ST-220) Exhibit V (Vendor Responsibility), Exhibit E (EO 177 Certification) and Exhibit H (N.Y. State Finance Law §139-l Certification), and PRC#2026003543 attached hereto and made part of this proposal. Background: Stony Brook University, part of the State University of New York system, is located 60 miles from New York City on Long Island's North Shore. Our 1,100-acre campus is home to almost 26,000 undergraduate, graduate, and doctoral students and more than 14,500 faculty and staff. Stony Brook University is a comprehensive research-intensive university and a member of the prestigious Association of American Universities (AAU). It consists of 12 schools and colleges and a teaching hospital that provides state-of-the-art healthcare in the Long Island region. The University consists of approximately 4,962,878 square feet of building space and over 16 miles of roadway. Key Events: Mandatory In-Person Pre-Bid Conference/ Site Visit: March 25, 2026 at 11:00 AM EST Stony Brook Southampton Campus Library Building, 1st floor 25 Tuckahoe Rd, Southampton, NY 11968 Bidder Questions: Last day to post question to Q&A Board. All questions must be posted to the Sourcing Q&A Board to be considered. Question after the question period will not be addressed. April 1, 2026 at 12:00 PM EST Proposals Due Date and Time (Any proposal received after the deadline will not be considered) April 16, 2026 at 12:00 PM EST RESTRICTED PERIOD: In accordance with the requirements of New York State Finance Law Sections 139j and 139k (“Lobbying Law”), the RESTRICTED PERIOD for this procurement is now in effect. Therefore, all communications regarding this procurement must be handled through Stony Brook University’s “Designated Contacts” ONLY. See Exhibit L for additional information. Please see below for the DESIGNATED CONTACT. Acceptance of Bid Content: The contents of the Bid and the Bidder’s response to this Bid shall become contractual obligations if a contract ensues. Failure of the Bidder to accept these obligations may result in the rejection of the Bidder’s response. Any additional vendor terms which are attached or referenced with a submission shall not be considered part of the bid or proposal but shall be deemed included for informational purposes only. SUNY reserves the right, in its sole discretion, to modify the above schedule. Bidders will be notified via email of any changes in a timely manner. Bidder Questions: Questions regarding the electronic bidding process should be directed to the Question and Answer board on the Sourcing System. DESIGNATED CONTACT: Jill McCahill Assistant Director of Strategic Sourcing +1 (555) 000-0000 contact@example.gov All questions should be submitted on the Q&A Board citing the particular event section where applicable. Bidders should make efforts to ensure all questions are submitted no later than the date listed in the Key Events section as questions received after the closing date for questions may not be responded to prior to the proposal due date. Bidder identifying information will not be included in the response. Only answers posted on the Q&A Board are official. Responses to inquiries that substantially change or clarify the event in a substantial manner will be posted as an addendum. It is the responsibility of the Bidder to inquire about any requirement of this event that is not understood. SUNY will not be bound by oral responses to inquiries or written responses other than addenda. Mandatory Pre-Bid Conference/Site Visit: The Mandatory Pre-bidders Conference is scheduled for March 25 at 11:00 AM (SHARP) at the Stony Brook Southampton Campus Library Building, East side of the main library on the first floor. Address: 25 Tuckahoe Road, Southampton, NY 11968 ** Failure to attend the Mandatory Pre-Bidders conference will result in rejection of your proposal ** Bid Opening: SUNY reserves the right to not hold a public bid opening or at any time to postpone or cancel a scheduled bid opening. In the event a public bid opening is scheduled, Bidders will be notified. If a public bid opening is not held, the University will release the names of the companies that submitted a bid and the unaudited total of each bid to those who submitted a bid. Method of Award (IFB): This IFB is part of a competitive procurement process designed to serve the best interests of the SUNY and the People of the State of New York. It is also designed to provide all bidders with a fair and even opportunity to have their products and services considered. SUNY will conduct a comprehensive review of each responsive bid submitted in accordance with the terms of this IFB. Award will be by grand total to the lowest responsible, qualified bidder who meets all qualifications and specifications. Bidder must respond as requested. Administrative Review: Each proposal received by the due date and time will be screened for completeness and conformance with requirements for proposal submission as set forth in this IFB. Cost Evaluation Phase: The lowest cost proposal needs to meet the bidder’s references and will be evaluated. The responsive and responsible Bidder submitting the proposal with the lowest prices/rates will be selected to contract with SUNY. The award shall be made by issuance of an award notice. SUNY contracts may be subject to approval by the New York State Attorney General and the Office of the State Comptroller. Bidder’s References Review: The lowest cost proposal after Administrative Review will advance to a committee to review the response to the Bidder’s References. Information provided in the proposal will be used to validate Bidder’s References and SUNY reserves the right to contact client references to validate required experience. If review of responses and reference checks determine the Bidder does not meet the Bidder’s References, the proposal will be deemed inadequate and will not be considered further. Finalist Review: In accordance with Section 163 (9) f of the NYS Finance Law, prior to making a contract award each contracting agency shall make a determination of responsibility of the proposed Contractor as discussed in Vendor Responsibility Section. SUNY will conduct a review of vendor responsibility for the Bidder earning the highest final composite score, and any proposed subcontractors. SUNY will consider any information that raises issues concerning the vendor’s responsibility, with consideration given to its relevance to the scope of work. The review will include factors such as financial and organizational capacity, legal authority, integrity and previous contract performance. Pricing Page Submission Instructions: Bidder must respond to all items as requested with a numerical value, otherwise the University reserves the right to consider the bid submission as non-responsive. No modifications may be made to the Pricing Page Submission Form. Bidders are encouraged to seek clarification during the question period. Modifications to the Pricing Page Response Form may result in disqualification. Items: Price shall be in accordance with the items listed or on the Cost Proposal Submission Form, if provided. No other charges, other than those listed in the items or on the Financial Proposal Submission Form shall be allowable under the agreement. Price Adjustment: The prices are to remain fixed for the life of the contract. There is no price escalation. The University will not accept any fuel surcharges or increases based on fuel. The Department of Procurement, Purchasing Section, will be the interpreter of all contract documents. FOB: Price shall be FOB (Free on Board) Destination, Freight Prepaid. Preparation Costs: Bidder is responsible for all costs, direct or indirect, that it incurs related to the preparation and submission of a proposal in response to this event. Prevailing Wage: Bidder agrees that their bid shall be submitted with the requirement that all wages paid to the workers shall be no less than the minimum prescribed by the New York State Department of Labor for the specific crafts used in the area where the work is performed. The NYS prevailing wage rate schedule is PRC# 2026003543 and is included in these specifications. See https://labor.ny.gov/workerprotection/publicwork/PWContents.shtm. OSHA 10-hour Construction Safety and Health Course – S1537-A: This provision is an addition to the existing prevailing wage rate law, Labor Law §220, section 220-h. It requires that on all public work projects of at least $250,000.00, all laborers, workers and mechanics working on the site, be certified as having successfully completed the OSHA 10-hour construction safety and health course. Pricing: All prices and conditions must be included in the original proposal. Prices and conditions not included in the original proposal will be rejected. Quote Hold: The submission of a proposal constitutes a non-revocable, binding offer to perform and provide said services. Such binding offer shall be firm and not revocable for a period of ninety (90) days from event close date. Subsequent to such ninety (90) days, the proposal is subject to withdrawal communicated in writing and signed by the Bidder. Tax Exempt: SUNY is exempt from sales tax. All prices should be quoted without the sales tax. Standard Clauses: Any contract resulting from this Proposal shall include Exhibit A (Standard Contract Clauses), Exhibit A-1 (attached - the Affirmative Action Clauses), Exhibit D (Non-Collusive Bidding Certification), Exhibit M (MWBE Forms), Exhibit L (Procurement Lobbying Law), Exhibit T (ST-220), Exhibit V (Vendor Responsibility Questionnaire), Exhibit E (EO 177 Certification), and Exhibit H (N.Y. State Finance Law §139-l Certification), Exhibit R (Certification Under Executive Order No.16), the provisions of which shall take precedence over any provision in the Proposal. These clauses relate to, among other things, assignment of the contract, availability of funds, non-discrimination, affirmative action, non-collusion, worker’s compensation. Compliance: The successful Bidder shall comply, and shall cause each of its employees, agents, subcontractors and the employees and agents of such subcontractors, if any, to comply, with all applicable laws, ordinances, rules, orders, regulations, and requirements of Federal, State and Municipal governments, and all applicable rules, regulations and policies of SUNY, including the policies of Stony Brook University. University policies may be found at https://www.stonybrook.edu/policy/. Award Protest: Upon notification of the selection and award of the contract, the bidder or offeror whose bid or proposal was not selected as the successful bid or proposal is entitled to submit a Bid Protest in accordance with SUNY’s Contracts Award Procedure (Document # 7561). The SUNY’s Protest Procedure is available at http://www.suny.edu/sunypp/documents.cfm?doc_id=699. The University's Protest Officer is Assistant Vice President Procurement Services, RSS Bldg., Stony Brook, NY, 11794-6000. The Appeals Officers is Vice President for Finance & Administration, Administration Bldg., Rm 221, Stony Brook NY, 11794-1002. Contract Term: The term of this agreement shall be within 180 days after the date of the Notice to Proceed. For the contract to be effective, the contract requires the approval of the New York State Attorney General and Office of the State Comptroller. Legislature Changes: In the event any governmental restrictions are imposed which would necessitate alteration of the material, quality, workmanship or performance of the items and/or services offered in this proposal whatsoever, prior to their delivery or thereafter, it shall be the responsibility of the successful bidder to immediately notify the University in writing of the specific regulation which requires alteration. Upon acceptance of such alteration by the University, it shall be the responsibility of the successful bidder to give effect to such alterations in accordance with terms and conditions of the agreement entered into hereinafter. Any price adjustments occasioned due to any alterations shall be subject to the approval of the University. Parking and Other Regulations of the University: It will be the responsibility of the successful contractor to contact the Traffic Office at +1 (555) 000-0000 to make arrangements for parking passes or permits if required. Illegally parked vehicles are subject to ticketing and/or towing. Bidder will operate vehicles responsibly under campus rules and regulations and will not park vehicles in unauthorized areas. Illegally parked vehicles will be towed. Successful bidder will abide by all the applicable rules and regulations of the University, and breach whereof shall make vendor liable under such rules and regulations. Recycle Clause: In accordance with the provisions of Section 177 of the State Finance Law, the State University is required to purchase recycled products, if available, made with significant recycled content in accordance with standards established by the State Department of Environmental Conservation. The law provides that if the price of a recycled product is within 10% of the price of a comparable product made without significant recycled content, or within 15% of such comparable product if the recycled materials used in such products are generated in New York State, the recycled product must be purchased. If you believe any products you will provide hereunder should be considered as qualifying recycled products under this law, please attach a copy of the authorization from the Department of Environmental Conservation confirming that such product has been approved for inclusion in the State recycling program. In the absence of such written confirmation, the product(s) will not be considered as qualifying for purposes of determining the selected vendor hereunder. Payment Terms: Payments under the resulting contract award shall be made to the Contractor, upon receipt of goods/services and properly approved and completed valid and proper invoice/s (Go to attached link to ensure you are meeting New York State proper invoicing requirements: https://osc.state.ny.us/agencies/guide/MyWebHelp/Content/files/XII.4.Fatt.pdf) and State of New York Department of Labor, Bureau of Public Works, Certified Payroll submitted to the attention of Accounts Payable, SUNY at Stony Brook. Payment may be withheld if a contractor has outstanding data, sales or MWBE reports. The Contractor shall provide complete and accurate billing valid and proper invoice/s to the University in order to receive payment for its services. Billing valid and proper invoice/s submitted to the University must contain all information and supporting documentation required by the University and OSC (All valid and proper invoice/s must be submitted with contractor’s Federal ID number). Payment for valid and proper invoice/s submitted by the Contractor shall only be rendered electronically unless payment by paper check is expressly authorized by the Vice President for Administration or designee, in her/his sole discretion, due to extenuating circumstances. Such electronic payment shall be made in accordance with ordinary New York state procedures and practices. The Contractor shall comply with the OSC procedures to authorize payments. Authorization forms are available at the OSC website at www.osc.state.ny.us/vendors/index.htm, by email at contact@example.gov or by telephone at +1 (555) 000-0000. The Contractor acknowledges that it will not receive payment on any valid and proper invoice/s submitted under this contract if it does not comply with the OSC’s electronic payment procedures, except where the Vice President or designee has expressly authorized payment by paper check as set forth above. Customs Clearance: If the product is being manufactured in another country and will require customs service, the cost of such service and any applicable importation fees shall be born by the vendor and incorporated in the price bid. Date/Time Warranty: Contractor warrants that Product(s) furnished pursuant to this Contract shall, when used in accordance with the Product documentation, be able to accurately process date/time data (including, but not limited to, calculating, comparing, and sequencing) transitions, including leap year calculations. Where a Contractor proposes or an acquisition requires that specific Products must perform as a package or system, this warranty shall apply to the Products as a system. Where Contractor is providing ongoing services, including but not limited to: i) consulting, integration, code or data conversion, ii) maintenance or support services, iii) data entry or processing, or iv) contract administration services (e.g., billing, invoicing, claim processing), Contractor warrants that services shall be provided in an accurate and timely manner without interruption, failure or error due to the inaccuracy of Contractor’s business operations in processing date/time data (including, but not limited to, calculating, comparing, and sequencing) various date/time transitions, including leap year calculations. Contractor shall be responsible for damages resulting from any delays, errors or untimely performance resulting therefrom, including but not limited to the failure or untimely performance of such services. Reserved Rights: SUNY Reserves the right to: Reject any and all proposals received in response to this IFB, make a contract award in whole or in part. Make no contract award. Reject any or all portions of any proposal, to negotiate terms and conditions consistent with this IFB and to make an award for any or all remaining portions. Withdraw the IFB at any time, at SUNY’s sole discretion. Disqualify any Bidder whose conduct or proposal fails to conform to the requirements of the IFB. Use proposal information obtained through site visits, management interviews and the state’s investigation of a Bidder’s qualifications, experience ability or financial standing, and any material or information submitted by the Bidder in response to SUNY’s request for clarifying information, in the course of evaluation and/or selection under the IFB. Prior to the bid opening, amend the IFB specifications to correct errors of oversights, or to supply additional information, as it becomes available. Upon University request, Prospective Bidder shall provide certified and/or non-certified audited financial statements with a letter from a CPA firm that GAAP was followed and they are not aware of any material misstatements for the past three (3) completed fiscal years, and/or other appropriate supplementation including, but not limited to, interim financial statements and credit reports as evidence of its ability to meet the service and requirements of the SUNY Stony Brook. Request references and contact any or all references and perform other related due diligence. Adjust or correct cost or cost figures with the concurrence of the Bidder if mathematical or typographical errors exist. Waive requirements or amend this IFB upon notification to all Bidders. Mandatory requirements may be eliminated if unmet by all Bidders. Negotiate with Bidders responding to this IFB within the requirements necessary to serve the best interests of SUNY. Require clarifications from Bidders for purposes of assuring a full understanding of responsiveness, and permit revisions from all Bidders determined to be susceptible to contract award prior to award. Miscellaneous Instructions: Delivery: Deliveries made to the University departments must be pre-established with the departments prior to orders being submitted to suppliers. Locations: Failure of contractor to familiarize him/herself with each separate location will not relieve contractor from responsibilities under the resulting contract award Installation: Delivery shall include unloading, moving to point of use, uncrating, assembling, complete installation, adjusting, connecting all services, testing, demonstrating and leaving ready to operate to the full extent of its design capabilities. Debris Removal: All accumulated debris, cartons, packing, etc. stemming from the installation shall be removed and disposed daily in the Contractor’s trash receptacles. Use of SUNY trash receptacles will not be allowed. Ordering: SUNY must be able to return, change, or cancel orders at any time before shipment without penalty or up to seven (7) days of receipt of delivery for any reason including, but not limited to, contractor error, damaged goods, “decided we don’t need,” etc. The terms of goods returned after seven (7) days will be mutually agreed upon by both parties. The Contractor shall honor all manufacturers’ guarantees. Inventory: The Contractor shall stock adequate inventories to service SUNY. Material and Equipment: Security of contractor’s material and equipment shall be the responsibility of the contractor. Payroll Documentation: SUNY and the New York State Department of Labor (NYS DOL) reserve the right to request Certified Payroll documentation for any work performed on this contract from the Contractor. SUNY does not require submittal of Certified Payroll documentation with invoicing; however, the Contractor shall provide such documentation immediately upon request. Substitutions: During the contract, substitutions will not be made without the approval of the University. In order to access the bid documents you will need to register your company on our web-based solution powered by Jaggaer: Jaggaer Supplier Registration: https://solutions.sciquest.com/apps/Router/SupplierLogin Public Site URL: https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=SUNY Tutorial Video on registration process https://www.youtube.com/watch?v=EPwSanSotkw Bid Opportunities https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=SUNY

More opportunities from State University of New York

Same awarding agency

NAICS: 238990
New
SLED
SBU / Engineering Research Center at Heavy & Old Engineering
Solicitation # 26/27-022MC
The State University of New York at Stony Brook is soliciting proposals for solicitation number 26/27-022MC to provide all labor, materials, equipment, and services necessary for the installation of equipment at the SBU Engineering Research Center at Heavy and Old Engineering. The scope of work includes delivery NET FOB Destination, unloading, assembly, connection of services, testing, and demonstration to ensure equipment is fully operational. The contract term is 180 days from the Notice to Proceed. Contractors are strictly required to remove all installation debris daily using their own receptacles and must provide certified payroll documentation upon request. The award will be granted based on the grand total to the lowest responsive and qualified bidder following a multi-phase review consisting of administrative screening, cost evaluation, reference checks, and a final vendor responsibility determination. Bidders must attend a mandatory pre-bidders conference on November 5, 2026, and submit proposals via the electronic sourcing system by December 11, 2026. Compliance with New York State prevailing wage rate schedule PRC# 2026029431 is required, and for projects exceeding 250,000 dollars, all on-site workers must hold OSHA 10-hour construction safety health certification. Submissions must include various mandatory certifications, including non-collusive bidding, MWBE forms, and vendor responsibility questionnaires.
All Other Specialty Trade Contractors

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS