Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Massachusetts was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Pre-fabricated Dugout Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The project has an estimated value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of open and covered concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, and the installation of new instrumentation, electrical systems, and motor control center components. Additional tasks include excavation, trench work, surveying of reactors, and the installation of platforms for improved access. The solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The project encourages the participation of certified DBE, DVBE, and SBE subcontractors for services such as welding, electrical work, concrete rehabilitation, and coating. All work must comply with applicable state, county, and federal regulations. The response deadline for this solicitation is December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract for the Town of Holliston involves the installation of pre-fabricated dugout structures for sports field projects. The selected contractor will be responsible for anchoring and securing these units to poured concrete pads using specific construction details, field designs, anchoring hardware, and hoisting equipment to ensure the structures are fully installed and secured. The project is managed by the Holliston Park and Recreation department and is located on Washington Street in Holliston, Massachusetts. Requirements for the contractor include maintaining general liability insurance and adhering to Prevailing Wage Rates. Interested parties must submit their responses by October 30, 2026.

General Info

Subcontract for installing prefabricated sports dugouts in Holliston, MA, due October 30, 2026.

Place of Performance

Washington Street Holliston, MA, 01746, USA

Set-Aside

NONE

Documents

This scope was carved out of BD-27-1627-HOLLP-1750-133937.

The full solicitation package (37 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Baseball/Softball Dugout Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fencing & Perimeter SecurityOpen now, due in 7 days
  • Pavement MarkingsOpen now, due in 53 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → HOLLPARK - Park and Rec
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs pre-fabricated dugout structures for prime contractors on Town of Holliston sports field projects. Anchors and secures pre-fab units to poured concrete pads according to construction details and field design using anchoring hardware and hoisting equipment. Requires payment of Prevailing Wage Rates and general liability insurance. Delivers fully installed and secured dugout structures.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS