Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project

Active
299-3104108-AR-PQState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pre-Qualification for Prima Zone 4 Phase A Main Gas Line Project, solicitation number 299-3104108-AR-PQ, is issued by OC Waste & Recycling in Santa Ana, California. The project involves the design, permitting, and construction of the Zone 4 Phase A Landfill Gas Collection and Control System header installation at the Prima Deshecha Landfill. Key deliverables include trenching, the installation of new HDPE header piping with associated valves and appurtenances, tie-ins to existing infrastructure, backfilling, testing, and the restoration of all disturbed areas. Contractors are required to manage site constraints such as traffic control, construction sequencing, and coordination with landfill operations while ensuring no damage occurs to existing infrastructure. The project is supported by detailed planning and design packages including site plans, line profiles, and survey control points. Bidders must adhere to a response deadline of September 18, 2026. Additionally, the project is subject to strict labor law compliance and fair wage requirements as overseen by the Orange County District Attorney's Office Public Works Unit, necessitating the submission of accurate certified payroll records in accordance with the California Labor Code.

General Info

OC Waste & Recycling pre-qualification for Prima Zone 4 gas line installation project.

Agency

California → OC Waste & RecyclingView Agency

NAICS

237120 - Oil and Gas Pipeline and Related Structures ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(8)

Pre-Qualification #2993104108 AR-PQ - Prima Zone 4 Main Gas Line

PDF28 pagesrfq

Prima LFGCCS Zone 4 Phase A - 100% Technical Specifications

PDF105 pagesspecifications

IFB 299-3104108-AR - Prima Zone 4 Phase A Main Gas Line Project

PDF2 pagesifb

Prima Deshecha Landfill GCCS Zone 4 Phase A Site Plan

PDF21 pagessow

OSHA Calculation Template - Buyer Internal Instructions

XLSX1 pageother

County of Orange Contract 299 3104108 AR - Prima Zone 4 Main Gas Line Project

PDF77 pagescontract-document

Prima Deshecha Landfill LFGCGS Zone 4 Phase A Engineer's Estimate

PDF2 pagesengineer's-estimate

Orange County District Attorney's Office Public Works Unit Certified Payroll and Labor Code Guidance

PDF14 pagesother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → OC Waste & Recycling
Contacts1 person available
OfficeSanta Ana, CA, 92701, USA
Organization / Agency
California → OC Waste & Recycling
View Agency Profile
Office AddressSanta Ana, CA, 92701, USA
Contacts
Albert RodriguezProcurement Contract Manager

Interested Companies (21)

Show more
Biogas Engineering
Long Beach, CA
ConstructConnect
Cincinnati, OH
T.E.Roberts
Irvine, CA

See All 21 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The project consists of design, permitting, and construction of the Zone 4 Phase A Landfill Gas (LFG) Collection and Control System (LFGCCS) header installation. Work to include trenching, installation of new HDPE header piping, associated valves and appurtenances, tie-ins to existing LFG infrastructure, backfilling, testing, and restoration of disturbed areas. Contractors should account for site constraints including traffic control, construction sequence, coordination with landfill operations, subcontractor scheduling, and materials procurement. Completed work will provide the owner with improvements to the LFGCCS, including the fully installed Zone 4 Phase A header and associated connections to the existing LFG infrastructure, with the requirement that the contractor avoid damage to any existing infrastructure not designated for demolition and removal.

Similar Contracts

Same NAICS industry code

NAICS: 237120
New
Federal
Freedom Connection Natural Gas Pipeline
Solicitation # W51DQV26Z1BHC
The U.S. Army Corps of Engineers, Latin America and Caribbean District, is conducting market research for the Freedom Connection Natural Gas Pipeline project in Puerto Rico. Funded by the U.S. Department of Energy, the project aims to enhance the resilience of the northern power grid by constructing an approximately 4.2-mile, 20-inch diameter natural gas pipeline to supply the Palo Seco Power Plant from the San Juan liquid natural gas terminal. The anticipated procurement will be a design-bid-build contract under NAICS code 237120, with an estimated construction magnitude between 25 million and 100 million dollars. The anticipated award date is the second quarter of Fiscal Year 2027, with a performance period of 365 calendar days from the notice to proceed. The scope of work encompasses integrated procurement, labor, and services, including the acquisition of long-lead materials, site preparation, and pipeline installation using both open trench and trenchless methods such as horizontal directional drilling. Responsibilities also include the construction of mainline block-valve stations, pig launcher and receiver stations, delegated design management, and final testing and commissioning. This current notice is a request for information to gauge the capabilities and interest of various small business concerns and certified entities. Interested firms must submit a capability statement of no more than ten pages by September 24, 2026, detailing their corporate information, bonding capacity, and relevant project experience.
W2SR Endist Caribbean(provis)

POSTED

3 days ago

DEADLINE

in 18 days
View Details

More opportunities from California → OC Waste & Recycling

Same awarding agency