PRE-QUALIFICATION - Hermitage Dam Rehabilitation Project – Construction Works (Phase 1)

Active
1618/1422International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The National Water Commission of Jamaica is soliciting prequalification bids for the urgent rehabilitation works of the Hermitage Dam, aiming to enhance its structural stability to meet minimum acceptable standards in line with modern engineering practices. The primary objective is to ensure the continued reliable operation of the water supply pipeline servicing critical communities in the coming years, addressing immediate safety and functionality concerns through targeted construction interventions. This initial phase focuses on pre-qualifying qualified contractors capable of delivering complex geotechnical and civil works under tight timelines and stringent safety requirements. The solicitation, numbered 1618/1422, was posted on July 22, 2026, with a response deadline of August 26, 2026, at 4:00 PM. The project is classified as a construction works tender under Phase 1, with no set-aside provisions applied. Interested entities must meet technical and financial criteria to be considered for inclusion in the pre-qualified bidder pool. All submissions must be directed through the official government procurement portal, and performance of the subsequent works will be localized to the Hermitage Dam site within Jamaica. This prequalification effort is a foundational step before awarding the actual rehabilitation contract, ensuring only competent and credible construction firms proceed to the next stages.

General Info

Prequalification sought for urgent Hermitage Dam rehabilitation to ensure water supply and structural safety in Jamaica.

Agency

Government of Jamaica → National Water CommissionView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

JAM

Set-Aside

NONE

Documents

(1)

tender-notice-10048487.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGovernment of Jamaica → National Water Commission
ContactsNo contacts available
OfficeJAM
Organization / Agency
Government of Jamaica → National Water Commission
View Agency Profile
Office AddressJAM
ContactsNo contact information available

Full Description

Show more
The NWC is seeking to procure for Prequalification to undertake Urgent Rehabilitation Works of the Hermitage Dam which involves the Improvement of the dam stability up to a minimum acceptable level, following modern standards and to guarantee the operation of the water supply pipeline in the next years.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Deaerator (DA) and Condensate System UpgradesThe Port of Seattle’s Aviation Project Management Group is seeking contractors to replace the Deaerator and Condensate tanks in the Central Mechanical Plant at Seattle-Tacoma International Airport, with an estimated contract value between $6.25 million and $7.5 million. The scope of work requires full procurement, installation, testing, and commissioning of new equipment in accordance with performance-based specifications outlined in Divisions 0 through 48 of the Project Manual, ensuring compliance with industry standards including ANSI A13.1, UL 969, ASTM E84, ASTM F594, and the International Building Code. All work must be performed on-site with strict adherence to safety protocols requiring OSHA 500-certified Safety Representatives and designated Competent Persons for fall protection, excavation, and lock-out/tag-out procedures, alongside a site-specific safety plan, hot work permits, and a drug-free workplace policy. The contract follows a Lowest Price Technically Acceptable award model, where bidders must be financially and technically responsible, meet bonding and insurance requirements, and demonstrate compliance with WMBE participation goals of at least 5% through documented outreach and self-certification. Submissions must be made electronically via email with a specific subject line format, not exceeding 10 MB per email, and late submissions will be rejected. Materials must be delivered to the site in factory packaging, with responsibility transferring upon arrival, and all labeling must meet ANSI and UL standards using durable brass or multilayer plastic materials with white-on-black contrast text and stainless steel fasteners. Final acceptance is contingent upon successful testing, submission of operation manuals, as-built drawings, and compliance certifications, with inspections conducted exclusively at the project site by the Port or its Engineer, though the Contractor retains sole responsibility for ensuring all work meets contractual obligations.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2028 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a wide-ranging modernization and safety upgrade initiative for the airfield infrastructure at the Port of Seattle, targeting critical systems including lighting, pavement, utilities, drainage, and fire access. Key components involve replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to enhance energy efficiency and operational reliability, while also replacing deteriorating pavement and essential utilities to maintain structural integrity and prevent service disruptions. Wildlife hazard mitigation measures include eliminating turf edge dams along runways and taxiways, installing anti-perching devices on airfield signage to deter birds, and addressing ponding issues through regrading and the installation of comprehensive storm drainage infrastructure to reduce wildlife attraction and improve safety. Additionally, the project includes the replacement of failing flush fire hydrant access hatches to ensure prompt and unimpeded access for emergency responders during incidents. All work is coordinated under a single solicitation titled AIRFIELD 2028 ALL PROJECTS, which bundles multiple capital improvement efforts funded through aviation infrastructure programs. The contract is managed by the Aviation Project Management Group at the Port of Seattle, with Yanet Maldonado serving as the primary point of contact for inquiries and coordination. The initiative aligns with long-term aviation safety and operational standards, aiming to reduce risks, improve regulatory compliance, and extend the service life of critical airfield assets through comprehensive, integrated upgrades.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive suite of airfield infrastructure improvements at the Port of Seattle, focusing on modernization, safety, and operational reliability. Key components include the replacement of airfield lighting circuits that demonstrate low megger readings with new LED lighting fixtures and signage to enhance visibility and energy efficiency. Concurrently, failing pavement sections and critical utilities throughout the airfield will be upgraded to prevent deterioration and ensure continued airfield integrity. Wildlife hazard mitigation efforts involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on airfield signs to deter bird activity, and addressing ponding issues through regrading and the installation of storm drainage infrastructure to reduce water accumulation and associated risks. Additional work includes the replacement of deteriorated flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response teams. The project is classified under NAICS code 237990 and is managed by the Aviation Project Management Group under the Port of Seattle, with Yanet Maldonado serving as the primary point of contact. While the solicitation number is not provided, the forecast was posted on July 23, 2026, indicating this is a planned procurement intended to align with long-term airfield improvement goals under AIP, AUI, CIRCUITS, and FOD initiatives. All work is expected to be performed at the Port of Seattle’s airfield facilities, with an emphasis on maintaining uninterrupted operations during execution.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details

More opportunities from Government of Jamaica → National Water Commission

Same awarding agency

NAICS: 238210
New
International
Instrumentation and Control Systems IntegrationThe contract involves the installation, calibration, and integration of instrumentation and control systems for water treatment processes, specifically including sensors, control panels, SCADA interfaces, and automation systems designed to monitor and regulate operations with precision and reliability. The scope requires qualified vendors to ensure seamless interaction between hardware and software components to achieve optimal performance, real-time data acquisition, and automated control of critical water treatment functions. All systems must meet industry standards for durability, accuracy, and cybersecurity, and must be compatible with existing infrastructure to support continuous and safe water treatment delivery. This is a subcontract opportunity posted by the National Water Commission under the Government of Jamaica, with a solicitation response deadline of August 19, 2026. The North American Industry Classification System code 238210 indicates the work falls under electrical and other construction installation services. There is no set-aside designation specified, and performance is expected to occur at facilities managed by the agency in Jamaica. Interested parties must submit proposals prior to the deadline, and all technical execution must align with the commission’s operational and regulatory requirements for public water infrastructure.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

7 days ago

DEADLINE

in 27 days
View Details
NAICS: 238220
New
International
Mechanical and Process Piping for Chlorine BuildingThe contract pertains to the installation of mechanical and process piping systems within a chlorine handling facility, encompassing chlorine gas handling equipment, ventilation and exhaust systems, and safety interlocks designed to ensure operational integrity and personnel protection. The scope includes all associated piping and infrastructure required to support the safe and efficient operation of the chlorine system, with strict adherence to industry standards for hazardous material handling. The work is classified under NAICS code 238220, indicating it involves specialized mechanical contracting services, and is structured as a subcontract under the National Water Commission of the Government of Jamaica. The solicitation was posted on July 16, 2026, with a response deadline set for August 19, 2026, at 4:30 PM. The place of performance is not explicitly detailed but is implied to be within Jamaica, given the agency’s jurisdiction. There is no set-aside designation specified, and the contract is open to qualified subcontractors with demonstrated expertise in chemical process systems and safety-critical mechanical installations. Interested parties must submit proposals through the official ePPS portal prior to the deadline, with no point of contact provided for inquiries, suggesting all communication be handled via the online portal linked in the posting.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

7 days ago

DEADLINE

in 27 days
View Details