Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Pre-solicitation Notice for Bonneville Spillway Gantry Crane Rehabilitation Project

Active
W9127N24R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers, Portland District, intends to award a firm fixed-price design-build construction contract for the rehabilitation of two 350-ton spillway gantry cranes at the Bonneville Dam in Skamania, Washington. The project, valued between $10 million and $25 million, involves restoring and upgrading critical crane components to maintain their lifting capacities. Work includes electrical, mechanical, structural, and general rehabilitation tasks, such as replacing operator cabins, upgrading electrical systems, repairing crane brakes and motors, rehabilitating structural elements like handrails and bracing, and ensuring updated access platforms for maintenance. The contract will require 100% performance and payment bonds and is open to all businesses without a small business set-aside. The procurement process will follow a Two-Phase Design-Build Selection procedure, with a 30% conceptual design package provided in the second phase to guide further design development. A single site visit will be offered during Phase II. The solicitation is expected to be released in March 2025 on the sam.gov website, with proposals due about 30 days thereafter. The anticipated contract start date is December 2025, with an estimated duration of 26 months. Offerors must be registered in the System for Award Management (SAM) to be eligible for contract award. Evaluation will use a best-value trade-off method under the design-build process.

General Info

Firm fixed-price contract for rehabilitating two 350-ton cranes at Bonneville Dam, $10-$25M, December 2025 start.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Cascade Locks, OR, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
Contacts1 person available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
Contacts

Full Description

Show more

Pre-solicitation Notice for Bonneville Spillway Gantry Crane Rehabilitation Project


This is a pre-solicitation notice, not a solicitation for proposals, and NO contract will be awarded from this synopsis.  No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. 


The U.S. Army Corps of Engineers (USACE), Portland District has been tasked to solicit and award one firm fixed-price contract for the Bonneville Spillway Crane Rehabilitation Project.


Project Description:


The U.S. Army Corps of Engineers, Portland District has a requirement from Bonneville Power Administration to provide the rehabilitation of two 350-ton Spillway Cranes at the Bonneville Dam.  The work is located in Skamania, Washington.


This will be a firm-fixed-price, design build construction contract. The magnitude of construction is between $10,000,000 and $25,000,000. 100% performance and payment bonds will be required. The government expects to award one contract in December 2025.  The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction and the associated small business size standard is $45 Million. This solicitation is not set aside for small business, i.e. unrestricted and open to both small and large businesses


The solicitation will follow the Two-Phase Design-Build Selection Procedures as outlined in FAR Subpart 36.3. A site visit will be offered during Phase II of the two-phase selection process. Only one site visit is expected to be offered.


The solicitation is expected to be made available for download on the sam.gov Contract Opportunities website in March 2025. Offerors are responsible for checking the referenced page for any updates to the Notice. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the documents posted at the referenced website. Proposals will be due approximately 30 days after the solicitation is posted. The exact proposal due date will be indicated in the solicitation.


System for Award Management (SAM): Offerors must register in the SAM at https://sam.gov/content/home prior to receiving an award.


Summary Scope of Work


The scope of this project encompasses the rehabilitation of the two identical spillway gantry cranes, designated as Crane 5 (south) and Crane 6 (north), along with any incidental work related to the project. Each crane is a gantry type with a capacity of 350 tons, featuring four gantry legs, one main hoist trolley, and one auxiliary hoist trolley. The main hoist of each crane is rated for 350 tons. The main hoists are utilized for lifting the spillway gates and splitting the gates, whereas the auxiliary hoists are employed for lifting deck lids and other lighter loads. The rehabilitation work must ensure that the lifting capacities of each crane are preserved.


Design:


A 30% conceptual design package which conveys the Government’s design intent will be provided with the Phase II Solicitation. The design package will include schematic plans and specifications.


Proposed design features include:


  1. Gantry Crane Rehabilitation Electrical Work
  2. Spillway Gantry Crane Mechanical and Structural Rehabilitation
  3. Operator Cabin

The Contractor will be responsible for continuing this design package to completion. Provide as-built drawings for the new configuration of the existing spillway gantry cranes.


Construction:


Proposed construction features are divided into the following primary categories for this project includes:


  1. General:
    1. Replace:
      1. Operator Cab on Gantry Crane 5 and 6, including but not limited to hoist trolley and gantry travel controls inside the operator cab.
      2. Move distribution panels in operator cab to generator platform.
  2. Electrical
    1. Remove
      1. Gantry 5 & 6 decommissioned genset throttle control cable to cab on each
    2. Replace
      1. Runway conductor (bus bar power) and Collector (Bus Collector Shoes) system with cable reel system
      2. Main and auxiliary hoist control and brake system, travel control and brake system, and limit switch control system, bus collector shoes.
      3. Auxiliary hoist trolley power with a cable festoon on gantry 5 similar to the replacement that was done on gantry 6, diesel generators, power distribution panels in operator cab to generator deck, automatic transfer switches, lighting, receptacles, conduit (as needed), and the hoists’ trolley and gantry travel control systems in the operator cab.
  3. Mechanical
    1. Rehabilitate:
      1. Hoist brakes, lower blocks (optional), upper blocks (optional), main hoist drums (optional) and final stage gearing (optional), lifting beams (optional), trolley brakes, and gantry drive motor brakes.
    2. Replace:
      1. Wire ropes for main and auxiliary hoists, auxiliary hoist motor, auxiliary hoist brake, auxiliary hoist speed reducer, trolley motors, gantry drive motors, and generator level roof panels (optional).
    3. Remove:
      1. Gantry 5 decommissioned fuel piping near operator cab.
  4. Structural:
    1. Rehabilitate:
      1. Re-paint and repair handrails as needed.
      2. Connection plates on Gantry 5 and 6
      3. Auxiliary hoist support beams, surface corrosion and section lost on Gantry 5 and 6
      4. Gantry 6, north face of the south leg
      5. Diagonal beam of Gantry 5 channel web
      6. Re-paint lifting beams. (optional)
      7. Touch up painting of the primary structure as needed to prevent further corrosion or concern for structural integrity. (optional)
    2. Replace:
      1. Contractor to design access to auxiliary hoist maintenance platforms on both Gantry cranes
      2. Damaged bracing over 3 feet of length of the Gantry 6 NW corner diagonal strut.

Estimated duration for the contract will be approximately 26 months and is anticipated to start December 2025.


Proposals will be evaluated under the Two-Phase Design Build Process, using the best-value trade-off process.


The solicitation (request for proposal) posting will follow this synopsis and is anticipated to be posted on or about 6 March 2025.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 10 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 10 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 15 hours ago

DEADLINE

N/A
View Details

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
The Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project in Cascade Locks, Oregon, is a total small business set-aside procurement issued by the USACE Portland District. The project involves replacing a seismically deficient 248-foot swing bridge with a new single-span steel girder bridge featuring a concrete deck, two travel lanes, shoulders, and a sidewalk. The scope includes partial demolition of the existing structure, construction of a concrete stub abutment anchored into rock and a south abutment supported by drilled shafts, and the development of approach roadways. Due to the requirement for continuous vehicular access, the work will likely be performed in phases and must adhere to strict environmental and seasonal restrictions, including specific in-water work windows for 2029 and 2030. The contract is a firm-fixed price agreement with a performance period of 1,295 calendar days from the notice to proceed. Key technical requirements include lead and asbestos removal, barge crane lifting near high-voltage power lines, and compliance with CMMC Level 1 cybersecurity standards. Specialized qualifications are required for ground anchors, jet grouting, and professional archaeological monitoring. The project is subject to rigorous quality control and inspection processes, including a three-stage sequence of punch-out, pre-final, and final acceptance inspections. Bidders must provide a bid guarantee and 100 percent performance and payment bonds. The final solicitation closing date was extended to October 29, 2026.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 484220
Federal
Pre-Solicitation Notice - Bonneville Dam Equipment Transport Blanket Purchase Agreement (BPA)
Solicitation # W9127N27A0001
The U.S. Army Corps of Engineers, Northwestern Division, Portland District intends to establish a Blanket Purchase Agreement (BPA) for commercial equipment transport services at the Bonneville Lock and Dam. This 100% small business set-aside, categorized under NAICS 484220, involves the on-call transport of light to heavy-haul equipment, ranging from 1.5 to 60 tons, between facilities on the Oregon and Washington shores via public highways. The agreement will span a five-year ordering period with an estimated annual volume of 60,000 dollars and a total potential value of up to 300,000 dollars. Selected BPA holders will be required to provide DOT-compliant vehicles and manage all route planning, including obtaining necessary permits from local, state, and federal authorities. Performance standards include a standard response time of 48 hours and a best-effort emergency response within 12 hours. For call orders under 2,500 dollars, selection will be based primarily on cost and availability with payment via credit card; orders exceeding 2,500 dollars will be competed among BPA holders and paid via electronic invoice. Contractors must maintain current insurance, adhere to FMCSA securement regulations, and submit a Quality Control Plan for government approval prior to the post-award conference.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

14 days ago

DEADLINE

in about 23 hours
View Details
NAICS: 238220
Federal
John Day Dam Powerhouse HVAC Upgrades
Solicitation # W9127N26BA006
The U.S. Army Corps of Engineers Portland District is seeking a single firm-fixed-price contract for comprehensive HVAC upgrades at the John Day Dam Powerhouse, located across Oregon and Washington. The project involves replacing primary and secondary chillers, installing four new chiller skid packages with approximately 600 tons of refrigeration capacity, and implementing a new automated digital HVAC control system. Key technical requirements include a mix of water-cooled and air-cooled systems, new intake and exhaust ducting for fire smoke propagation prevention, and the installation of mini-split units. The work must be performed within an active powerhouse containing high-voltage electrical equipment and areas prone to water intrusion, with a construction period of 1,004 calendar days. The estimated project magnitude is between 25 million and 100 million dollars under NAICS code 238220. A critical condition for award is compliance with Cybersecurity Maturity Model Certification, specifically CMMC Level 2 (Self) for the prime contractor and appropriate levels for subcontractors based on the type of information processed. The solicitation is expected to be issued as an Invitation for Bids in mid-September 2026, requiring bidders to have an active SAM registration and a current NIST SP 800-171 assessment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

19 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS