Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pre-stressed Concrete Slab Girder Fabrication

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and delivery of pre-stressed concrete slab girders for a culvert replacement project at Jones Road. The selected contractor is responsible for producing a bridge structure measuring 38 feet in length and 33 feet in width, ensuring all work adheres to project specifications and Washington State Department of Transportation standards. Managed by the Washington Public Works Roads agency under NAICS code 327310, the contract requires the supplier to deliver the completed girders directly to the project site. The solicitation was posted on November 5, 2026, with a response deadline set for December 3, 2026.

General Info

Fabrication and delivery of pre-stressed concrete slab girders for Jones Road culvert replacement.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

This scope was carved out of 90-21F171900171.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Jones Road MP 1.71 Culvert Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Public Works- Roads
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies pre-stressed slab girders for prime contractors on WSDOT bridge projects, here a culvert replacement at Jones Road. Fabricates a 38-foot long by 33-foot wide pre-stressed slab girder bridge according to project specifications and WSDOT standards. Delivers the fabricated girders to the project site.

Similar Contracts

Same NAICS industry code

More opportunities from Washington → Public Works- Roads

Same awarding agency

NAICS: 237310
New
SLED
Jones Road MP 1.71 Culvert Replacement Project
Solicitation # 90-21F171900171
The Jones Road MP 1.71 Culvert Replacement Project is a public works initiative managed by the Board of County Commissioners of Lewis County, Washington. The primary scope of work involves improving Jones Road at milepost 1.71 by replacing an existing culvert with a 38-foot long by 33-foot wide pre-stressed slab girder bridge featuring steel pipe abutments. The project also includes related infrastructure improvements such as shoulder finishing, the application of 195 tons of HMA, the installation of beam guardrails, and the implementation of erosion and water pollution control measures. All construction must adhere to the 2021 International Building and Residential Codes, the Washington State Energy Code, the Lewis County Master Site Plan, and WSDOT and City of Centralia standards. Proposals must be submitted by 12:15 p.m. on December 3, 2026, to the Public Works Contract Team in Chehalis, WA. Required submission documents include a bid bond, a non-collusion declaration, certification of wage law compliance, a local agency subcontractor list, and company UBI and UEI numbers. The contract mandates strict quality controls, including hydrostatic pressure testing of pipes at 25 PSI and compaction of backfill to 95 percent density. Payments are to be made via certified check to the Lewis County Treasurer, and the Lewis County Engineer serves as the primary authority for contract alterations.
Highway, Street, and Bridge Construction

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS