Precast Manhole Supply and Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement involves the supply and installation of precast reinforced concrete sectional manholes for prime contractors working on City of Fillmore water facility projects. The scope of work includes providing cylindrical sectional manholes, bases, tops, inserts, ladder rungs, and frames, ensuring all materials adhere to ASTM A36 steel and ASTM C478 precast section specifications. All deliverables must strictly comply with ASTM and AASHTO standards to ensure structural integrity and regulatory alignment. The project is located in Fillmore, California, under NAICS code 237110. The solicitation was posted on September 1, 2026, with a response deadline of October 1, 2026. The selected subcontractor will be responsible for the full delivery and installation of the precast manhole systems as required by the City of Fillmore.

General Info

Subcontract for supplying and installing precast concrete manholes for City of Fillmore projects.

Agency

California → City of FillmoreView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Fillmore, CA, 93015, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-03B.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Well 10 Equipping & Pump House Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fillmore
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Fillmore
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs precast reinforced concrete sectional manholes for prime contractors on City of Fillmore water facility projects. Provides cylindrical sectional manholes, bases, tops, inserts, ladder rungs, and frames using ASTM A36 steel and ASTM C478 precast sections. Must comply with ASTM and AASHTO standards. Delivers installed precast manhole systems.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Technical and environmental services are also required, including surveying, testing and inspections, settlement monitoring, videography, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage their participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of associated appurtenances such as trenchless crossings, air release valves, blowoff assemblies, valves, and fittings, as well as connections to existing water facilities. Additional requirements encompass the construction of flow control facility components, site improvements, pavement removal and restoration, traffic control, and the overall commissioning and disinfection of the system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for this project, with a response deadline of September 18, 2026, by 2:00 PM PT. The solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, DBE, and DVB. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Requested trade scopes include trenchless construction, steel pipe welding, electrical and instrumentation, cathodic protection, and various restoration and hauling services. Point of contact for the project is Alyssa Callaway.
Garney Pacific, Inc.

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements encompass drainage improvements, electrical upgrades, instrumentation and controls, piping systems, excavation of cobbles and boulders, welding, disinfection, and surface restoration. This opportunity is designated as a small business set-aside, specifically welcoming SBA-certified Service-Disabled Veteran-Owned Small Businesses, Minority Business Enterprises, and Woman Business Enterprises. James W. Fowler Co. provides support for M/W/DBE subcontractors in securing bonding, insurance, lines of credit, and necessary materials. Bids are due by September 29, 2026, and all negotiations must be finalized 24 hours prior to the bid opening. The project also encourages the utilization of apprentices and requires quality control testing.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details

More opportunities from California → City of Fillmore

Same awarding agency

NAICS: 237110
New
SLED
Well 10 Equipping & Pump House Project
Solicitation # 25-03B
The Well 10 Equipping and Pump House Project (Spec No. 25-03B) is a solicitation by the City of Fillmore, California, for the complete equipping of a well and construction of a new pump house at Delores Day Park. The scope of work includes the installation of well pumps, motors, piping, and valves, as well as the implementation of a sodium hypochlorite chemical system with spill containment. Additionally, the contractor must install comprehensive electrical systems, including transformers, a generator, and an automatic transfer switch. All work must be completed within 175 consecutive working days from the date of the Notice to Proceed. Bidders must hold a valid Class A California Contractor's License and submit their bids electronically via the PlanetBids portal by October 1, 2026. The project adheres to the 2024 Standard Specifications for Public Works Construction and requires compliance with NSF/ANSI/CAN 60 and 61 standards for chemicals and tubing. Contractors are required to pay prevailing wages as established by the California Department of Industrial Relations and provide electronic certified payroll records. Payment is based on actual materials used via unit costs, with a five percent retention deducted from progress payments. Final payment is issued sixty days after the recordation of project acceptance by the Ventura County Recorder.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in 28 days
View Details