This Government Contract opportunity from Ohio was posted on September 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Precast Vault and Utility Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

This subcontract for Precast Vault and Utility Installation involves the installation of precast vaults and vent lines for prime contractors on State Division gas well projects in Ohio. The scope of work includes installing precast vault sections with resilient joint seals, GAS WELL marked frames and covers, and 2 inch diameter schedule 40 galvanized steel pipe stubs. The contractor is responsible for placing aggregate bedding and dry Quikrete backfill according to ODOT CMS items and utilizing appropriate hoisting equipment to deliver the completed gas well vault and vent system. The opportunity is managed by the Ohio Department of Natural Resources Oil and Gas division under NAICS code 238910. The solicitation was posted on September 11, 2026, with a response deadline of October 8, 2026, at 4:00 PM.

General Info

Subcontract for precast vault and utility installation for Ohio State Division gas wells.

Place of Performance

OH, USA

Set-Aside

NONE

Documents

This scope was carved out of SRC0000041826.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ODNR, Division of Oil & Gas – OWP – Federal Project –Lorain 13F - 4 Wells AMENDMENT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Dnr900200 Oil And Gas Dnrfra
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs precast vaults and vent lines for prime contractors on State Division gas well projects. Installs precast vault sections with resilient joint seals, GAS WELL marked frames and covers, and 2" diameter schedule 40 galvanized steel pipe stubs. Places aggregate bedding and dry Quikrete backfill per ODOT CMS items. Utilizes hoisting equipment. Delivers installed gas well vault and vent system.

More opportunities from Ohio → Dnr900200 Oil And Gas Dnrfra

Same awarding agency

New
SLED
ODNR, Division of Oil & Gas – OWP – Wyandot 3 - 3 Wells
Solicitation # SRC0000042681
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Wyandot 3 project to plug and plate three orphan wells located in Wyandot County, specifically within Crawford and Ridge townships. The scope of work includes mobilization, site development, drilling, cleaning out, and plugging of the wells, as well as the decommissioning and disposal of all casing, tubing, and production equipment. The project requires the restoration of all disturbed areas to a condition equal to or better than their original state, with all work adhering to Ohio Administrative Code 1501-9-11-10 and specific technical drawings. The project must be completed by April 2, 2027, and includes a one-year warranty on all work and materials. To be eligible for award, suppliers must be active on state contract CSP900922 (DAS Index No. MAC110), maintain good standing with other agency projects, and have attended the mandatory pre-bid meeting held on November 3, 2026. The contract will be awarded to the lowest responsive and responsible bidder, provided their offer is mathematically and materially balanced. Bidders must submit their proposals via the OhioBuys portal by November 19, 2026. Payment is processed through the Orphan Well Project Management Contractor Portal and requires mutual agreement on work completion between the contractor and the Division's Project Representative. For federally funded portions of the project, contractors must comply with the Buy American Act and submit payroll reports with each invoice.

POSTED

2 days ago

DEADLINE

in 22 days
View Details
NAICS: 213111
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project –Scioto 3F - 2 Wells
Solicitation # SRC0000042633
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Scioto 3F Project to plug and plate two orphan wells, Oertels Corner #1 and Romanello #1, located in Jefferson Township, Scioto County. The scope of work encompasses mobilization, well site development, drilling or cleaning out and plugging of the wells, decommissioning and disposal of all casing and production equipment, and full restoration of disturbed areas. Key technical deliverables include the installation of cement plugs from 210 feet to within 30 inches of ground level and the maintenance of strict well control throughout the process. Work must be performed in accordance with Ohio Revised Code 1509 and Ohio Administrative Code Chapters 1501:9-11 and 1501:9-12. As a federally funded project, contractors must comply with Davis-Bacon prevailing wage requirements and Buy America sourcing mandates for iron, steel, and manufactured construction materials. Eligible bidders must be active on CSP900922 (DAS Index No. MAC110), attend the mandatory pre-bid meeting on November 4, 2026, and be in good standing with the agency. The contract will be awarded to the lowest responsive and responsible bidder based on submissions via OhioBuys. Performance must begin within three months of the contract end date and be completed by May 1, 2027, or five months after the effective date, whichever is sooner. Invoicing is managed through the Orphan Well Project Management Contractor Portal and requires supporting documentation, including payroll reports for federal compliance.
Drilling Oil and Gas Wells

POSTED

5 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS