Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 27, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Preliminary and Final Design of the Palms Reservoirs Demolition and Palms Zone Pressure Reducing Stations (PRS) Construction

Closed
D120073State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 11 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves comprehensive planning and design work related to the Palms Reservoirs demolition and the construction of Palms Zone Pressure Reducing Stations (PRS) for the Olivenhain Municipal Water District in California. The scope includes initial coordination with district staff to confirm operational, hydraulic, electrical, and instrumentation requirements, as well as collaboration with EFI on facility layout, connection points, power, and SCADA needs. A preliminary design will be developed, identifying optimal locations for the PRS, necessary facility replacements such as valves and relief points, and providing cost estimates. This will be followed by the creation of an anticipated construction schedule covering the installation of new PR stations, demolition of existing reservoirs, and site cleanup. Once the preliminary design is approved, the contractor will prepare detailed final design and bidding documents, including plans and specifications for installing owner-furnished pre-fabricated PRSs, modifications to existing infrastructure, and demolition activities. The contractor will also support environmental documentation, public outreach, and construction administration efforts throughout the project. The contract is valued between $500,000 and $1,500,000, with a response deadline of August 6, 2024, and is managed by Diana Spencer, reachable via email or phone.

General Info

Agency

California → Olivenhain Municipal Water District

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Olivenhain Municipal Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Olivenhain Municipal Water District
Office AddressN/A

Full Description

Show more
The key objectives of the project include:1. Meet with OMWD staff to confirm operations, hydraulics, valve sizing, PRS layout, and electrical and instrumentation needs.2. Coordinate with EFI on PRS facility layout, dimensions, connection points, power and SCADA requirements, and other information.3. Prepare a preliminary design of PRS replacements, including the recommended locations, other required facility replacements (e.g. valves, relief locations, etc.), and estimated costs. 4. Prepare an anticipated construction schedule including construction of the PR stations, demolition of the existing reservoirs, and clean up of the existing site. 5. Upon approval of the preliminary design(s), prepare final design and contract documents for bidding including plans and specifications for installation of the owner-furnished pre-fabricated PRSs, modifications to the existing PRS (if any), demolition of the reservoirs, and any other relevant portions of the project.6. Provide support to District staff for the Environmental Documentation, Public Outreach, and Construction Administration efforts.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS