Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Preliminary Geotechnical Study at Nokomis Avenue Bridge Over San Anselmo Creek

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Anselmo is conducting a preliminary geotechnical study at the Nokomis Avenue Bridge over San Anselmo Creek in Marin County. The primary objective of this project is to collect soil and groundwater data through geotechnical borings and subsurface investigations to support the development of engineering plans to repair scour damage at Pier 2 and Pier 3. These efforts are intended to protect the historical bridge from high-flow events and ensure the crossing remains safe for residents. The scope of work involves information collection and resource evaluation with minimal environmental impact. The project will not include any in-water work or the removal of healthy, mature, or scenic trees. Activities are limited to temporary, minor ground disturbance followed by immediate backfilling and restoration. Scott Schneider, the Public Works Director, serves as the primary point of contact for this effort, which is classified under NAICS code 541360.

General Info

San Anselmo seeks a geotechnical study for Nokomis Avenue Bridge scour damage repairs.

Agency

California → City of San Anselmo

Place of Performance

Nokomis Avenue at San Anselmo Creek, San Anselmo, CA, 94960

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Anselmo
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Anselmo
Office AddressN/A
Contacts
Scott SchneiderPublic Works Director

Full Description

Show more
Preliminary geotechnical study to gather information for developing plans to repair scour damage at Pier 2 and Pier 3. No in-water work or tree removal will occur. The purpose of the repairs is to prevent further damage to the historical bridge from scour and high-flow events, and to maintain the bridge as a safe crossing for residents to access their homes. The project consists of geotechnical borings and subsurface investigations to collect soil and groundwater data for engineering analysis. The activity involves information collection and resource evaluation and will not result in significant disturbance to environmental resources. Further, the activity involves temporary, minor ground disturbance, followed by backfilling and restoration, with no removal of healthy, mature, or scenic trees.

Similar Contracts

Same NAICS industry code

NAICS: 541360
SLED
City of Norco 2050 General Plan Update Project
Solicitation # 2024110840
The City of Norco is undertaking the 2050 General Plan Update Project to establish a long-term vision for land use, development patterns, infrastructure planning, and resource conservation within the city's incorporated limits. The project focuses on preserving the rural, equestrian-oriented atmosphere of residential agricultural neighborhoods, supporting local businesses, and creating a prominent downtown identity. To comply with State Planning and Zoning Law, the update includes six mandatory elements: Land Use and Community Character, Circulation, Infrastructure and Facilities, Open Space and Conservation, Safety, and Noise. The plan incorporates goals and policies developed through community outreach to enhance public facilities, parks, and transportation safety. The project is managed by the Community Development Director, Colby Cataldi, with support from Meridian Consultants. A Program Environmental Impact Report has been developed to ensure compliance with CEQA guidelines, identifying a significant environmental impact regarding paleontological resources that requires specific mitigation. The project also mandates adherence to the Americans with Disabilities Act for pedestrian infrastructure and requires strict confidentiality regarding tribal cultural resources. Additionally, any construction activities involving soil disturbance must comply with NPDES General Permit requirements, including the development of a Stormwater Pollution Prevention Plan. The public review period for the draft environmental documents was scheduled from August 14, 2026, to September 28, 2026.
City of Norco

POSTED

8 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS