Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Preliminary Geotechnical Study at Nokomis Avenue Bridge Over San Anselmo Creek

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Anselmo is seeking a preliminary geotechnical study at the Nokomis Avenue Bridge over San Anselmo Creek to gather essential soil and groundwater data. This investigation is necessary to develop engineering plans for repairing scour damage at Pier 2 and Pier 3, ensuring the historical bridge remains a safe crossing for residents and is protected from future high-flow events. The scope of work involves geotechnical borings and subsurface investigations that will result in only temporary, minor ground disturbance followed by full restoration. There will be no in-water work or removal of healthy, mature, or scenic trees, ensuring that the activity does not cause significant disturbance to local environmental resources.

General Info

San Anselmo seeks a geotechnical study for Nokomis Avenue Bridge scour damage repairs.

Agency

California → City of San Anselmo

NAICS

N/A

Place of Performance

Nokomis Avenue at San Anselmo Creek, San Anselmo, CA, 94960

Set-Aside

NONE

Documents

(1)

CEQA NOE_SIGNED_STAMPED_NokomisAveGeotechStudy_08112026

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Anselmo
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Anselmo
Office AddressN/A
Contacts
Scott SchneiderPublic Works Director

Full Description

Show more
Preliminary geotechnical study to gather information for developing plans to repair scour damage at Pier 2 and Pier 3. No in-water work or tree removal will occur. The purpose of the repairs is to prevent further damage to the historical bridge from scour and high-flow events, and to maintain the bridge as a safe crossing for residents to access their homes. The project consists of geotechnical borings and subsurface investigations to collect soil and groundwater data for engineering analysis. The activity involves information collection and resource evaluation and will not result in significant disturbance to environmental resources. Further, the activity involves temporary, minor ground disturbance, followed by backfilling and restoration, with no removal of healthy, mature, or scenic trees.