Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Preliminary Project Analysis (PPA) Development for Coconino, Coronado, Santa Fe and Tonto NF

Active
127EAV26Q0102Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This project involves the acquisition of Preliminary Project Analysis (PPAs) to determine the locations and acquisition methods for office consolidation within the Coconino National Forest. The scope also includes relocating the Supervisor's Office in the Coronado National Forest, assessing options for the Las Vegas Ranger Station on the Santa Fe National Forest, and an optional relocation of the Supervisor's Office in the Tonto National Forest. The solicitation is a total small business set-aside issued by the USDA Forest Service, Csa Southwest 5, under NAICS code 541330. Interested offerors must submit questions by August 28, 2026, at 12:00 PM PST, with final quotes due by September 8, 2026, at 5:00 PM PST.

General Info

USDA Forest Service project for office consolidation and relocation analysis across multiple forests.

Agency

Department Of Agriculture → Csa Southwest 5 Usda-FsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

NM, USA

Set-Aside

SBA

Documents

(10)

Pima County Wage Determination (AZ) - 2026 Revision

PDFwage-determination

2016 Tonto National Forest Facility Master Plan

PDFother

Wage Determination No. 2015-5465, Coconino County, AZ

PDFwage-determination

Coronado National Forest Facility Master Plan (June 2020)

PDFother

Wage Determination No. 2015-5469, Arizona (Maricopa and Pinal)

PDFwage-determination

San Miguel WD 2015-5451 Wage Determination

PDFwage-determination

Santa Fe National Forest Facility Master Plan, December 2016

PDFsow

Coconino National Forest Facility Master Plan (October 2016)

PDFsow

C04+SOI+127EAV26Q0102.xlsx

XLSX

127EAV26Q0102 - Preliminary Project Analysis PWS

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Csa Southwest 5 Usda-Fs
Contacts1 person available
OfficeAlbuquerque, NM, 871023498, USA
Organization / Agency
Department Of Agriculture → Csa Southwest 5 Usda-Fs
View Agency Profile
Office AddressAlbuquerque, NM, 871023498, USA
Contacts
Ma Estrellita Dasmarinas

Full Description

Show more

This Project is for the acquisition of Preliminary Project Analysis (PPAs) to determine locations and method of acquisition for consolidation of offices in the Coconino National Forest, the moving of the Supervisor's Office in the Coronado National Forest, assessing options for the Las Vegas Ranger Station on the Santa Fe National Forest and the moving of the Supervisor's Office in the Tonto National Forest (optional). - See attached Statement of Work (SOW) for details. 


Read through the entire solicitation and follow instructions to Offerors (52.212-1) to be considered for evaluations


Questions are due NLT 28 August 2026 by 12:00 PM PST.


Quotes are due NLT 08 September 2026 by 5:00 PM PST.


Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details

More opportunities from Department Of Agriculture → Csa Southwest 5 Usda-Fs

Same awarding agency