Preliminary Sewer Collection System Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Ojai Valley Sanitary District involves the preliminary engineering design and layout required to convert existing septic systems into a centralized sewer system. The selected professional will be responsible for developing 30 percent design plans, establishing the preliminary routing for sewer mains and lateral connections, and performing all necessary hydraulic calculations. Key deliverables for this project include a Preliminary Engineering Report and a 30 percent Design Plan Set. To qualify for this engagement, the contractor must be a Professional Engineer licensed in the state of California and possess the necessary CAD software and GIS mapping tools. The work is categorized under NAICS code 541330 and will be performed in the 93001 zip code area. This role serves as a support function for prime contractors managing the broader district projects.

General Info

CA licensed engineer to provide preliminary design and layout for Ojai sewer conversion.

Agency

California → Ojai Valley Sanitary District

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, 93001

Set-Aside

NONE

Documents

This scope was carved out of Septic to Sewer Conversion Project- 30% Design- West Casitas Springs.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ojai Valley Sanitary District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Ojai Valley Sanitary District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs initial engineering design and layout for converting septic systems to a centralized sewer system for prime contractors on Ojai Valley Sanitary District projects. Develops 30% design plans, preliminary routing of sewer mains and lateral connections, and hydraulic calculations. Requires CAD software and GIS mapping tools. Must be a Professional Engineer (PE) licensed in California. Delivers 30% Design Plan Set and Preliminary Engineering Report.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is soliciting sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessment and permitting support. The solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested parties must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a final bid deadline of September 11, 2026. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Additionally, Kiewit emphasizes the importance of labor harmony, as they are signatories to several collective bargaining agreements. Detailed plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries regarding the project schedule or requirements should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS