This Solicitation opportunity from California was posted on February 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Mt. San Antonio College is seeking qualified contractors to submit responses through its eProcurement Portal by 4:30 pm on March 13, 2026, for a waterline replacement project at its 26-acre Wildlife Sanctuary. The sanctuary, established in 1966, functions as a natural habitat and outdoor classroom supporting studies in biology, horticulture, ecology, and sustainability by preserving diverse ecosystems and providing habitat for protected species. The existing waterline infrastructure, which has been in place for nearly six decades, is largely failing, causing multiple supply disruptions that threaten the sanctuary’s ecosystems and limit instructional activities reliant on functional irrigation.
The project involves the installation of new main waterline infrastructure and conveyance equipment, including a distributed hose connection system to support spot irrigation throughout the sanctuary. This work is a component of the 2021/22 State Scheduled Maintenance Program, designed by Psomas Engineering in collaboration with the college’s Facilities Maintenance & Operations and Natural Sciences teams. The recent installation of an 8-inch main waterline loop through Lot W has set the stage for this upgrade. Construction is scheduled for the summer to minimize disruption to instructional programs and avoid weather-related difficulties during trenching. The solicitation is managed by Mt. SAC’s Facilities, Planning, and Management office, located in Walnut, California, with primary contact available for inquiries.
General Info
Mt. San Antonio College seeks contractors for summer 2026 waterline replacement at Wildlife Sanctuary.
PDF, High priority: read this first12 pages · construction-drawings
HighAI Summary for 100% Construction Drawings - WLS Waterline Replacement: This document is the 100% Construction Drawings for the Mt SAC Wildlife Sanctuary Water System Replacement Project, dated 10/17/2025. It includes detailed engineering plans, specifications, and construction requirements for the waterline replacement. The document outlines contractor responsibilities, inspection requirements, traffic control, environmental protection measures, and material specifications such as pipe ratings and installation standards. It serves as a comprehensive guide for construction execution and compliance with local ordinances and engineering standards.
PDF
PDF, High priority: read this first21 pages · prequalification-application
HighAI Summary for 2023 Prequalification Application for Bidders over $200,000 at Mt. San Antonio College: This document is a bidder's pre-qualification package for prime contractors wishing to bid on projects greater than $200,000 at Mt. San Antonio College. It outlines the requirements for prequalification under Public Contract Code Section 20651.5, including financial statements, experience in public works, and compliance with labor codes. The prequalification status is valid for 12 months and may be updated. The document details submission instructions, screening criteria, financial information requirements including audited or reviewed statements, and public works project experience. Confidentiality of submitted information is emphasized, and the document includes standards for financial capacity and accountant certifications.
PDF
PDF, High priority: read this first23 pages · contract-document
HighAI Summary for Bid Bond and Agreement for Mt. San Antonio Community College District Project: This document includes a Non-Collusion Declaration, Bid Bond, and Agreement related to a project for Mt. San Antonio Community College District. The Non-Collusion Declaration certifies the bid proposal is genuine and not collusive. The Bid Bond outlines the surety's obligation to the district for 10% of the bid amount, ensuring the bidder will enter into the contract and provide performance bonds. The Agreement section details the contractor's obligations to perform the work within the contract time and price, including provisions for liquidated damages if the work is not completed on time. The document is a formal contract document essential for the procurement process.
PDF
PDF, High priority: read this first47 pages · contract-document
HighAI Summary for Community Workforce Agreement - Mt. San Antonio College: This Community Workforce Agreement is entered into by Mt. San Antonio Community College District, the Los Angeles and Orange Counties Building and Construction Trades Council, and the signatory Craft Councils and Unions. It establishes labor relations guidelines and procedures for capital construction and major renovation projects funded by Bond Measure RR or Measure GO. The agreement outlines definitions, scope, union recognition, wages, work conditions, grievance procedures, and compliance monitoring. It includes attachments such as a Letter of Assent and policies on drug testing. The document is intended to bind contractors and subcontractors working on covered projects to the terms of the agreement, ensuring labor standards and cooperation among parties.
PDF
PDF, High priority: read this first59 pages · escrow-agreement
HighAI Summary for Escrow Agreement for Security Deposits - Mt. San Antonio College: This Escrow Agreement document, pursuant to California Public Contract Code Section 22300, outlines the terms for depositing securities as a substitute for retention earnings between Mt. San Antonio College (Owner), the Contractor, and an Escrow Agent. It specifies responsibilities for holding, investing, and withdrawing escrowed funds, conditions for default, and release of securities upon contract completion. The agreement includes provisions for fees, interest earnings, and authorized representatives. The document is intended for use in construction contracts to manage retention funds securely and ensure compliance with contract terms.
PDF
PDF, High priority: read this first31 pages · rfb
HighAI Summary for Formal CWA Bid Documents - Mt. San Antonio Community College District: This document is a formal bid package for a construction project at Mt. San Antonio Community College District. It includes a Non-Collusion Declaration affirming the bid's authenticity and compliance with anti-collusion laws, a Bid Bond outlining surety obligations and conditions for bid validity, and a draft Agreement specifying the scope of work, contract time, contract price, and liquidated damages. The document is intended for bidders to submit competitive bids and enter into a contract for the specified project. It is a critical solicitation document dated for the current bidding cycle.
PDF
PDF, High priority: read this first63 pages · general-conditions
HighAI Summary for General Conditions REV 2.2021: This document titled 'General Conditions REV 2.2021' provides comprehensive contractual terms and conditions for construction projects. It includes detailed articles covering definitions, roles of the district, architect, project manager, and contractor responsibilities. Key topics include subcontractor management, insurance requirements, contract time, safety protocols, wage rates, and compliance with laws. The document serves as a foundational contract component outlining administrative, procedural, and legal obligations for all parties involved in the construction contract.
PDF
PDF, High priority: read this first62 pages · general-conditions
HighAI Summary for General Conditions with Community Workforce Agreement: This document titled 'General Conditions with Community Workforce Agreement' outlines the contractual terms and conditions for a construction project. It includes detailed articles covering definitions, roles of the district, architect, project manager, and contractor responsibilities. Key topics include subcontractor management, insurance requirements, contract time, labor and materials, safety, wage rates, and compliance with laws. The document also addresses the Community Workforce Agreement (CWA) and Disabled Veteran Business Enterprise (DVBE) provisions. It serves as a foundational contract document specifying administrative, procedural, and legal obligations for all parties involved in the project.
PDF
PDF, High priority: read this first33 pages · geotechnical-report
HighAI Summary for Geotechnical Study Report for Wildlife Sanctuary Water Line Replacement: This Geotechnical Study Report, dated September 23, 2025, was prepared by Converse Consultants for Mt. San Antonio College. It evaluates the geotechnical site conditions for the proposed water line replacement project within the Wildlife Sanctuary at Mt. San Antonio College in Walnut, California. The report includes site reconnaissance, subsurface exploration with ten exploratory borings, laboratory testing of soil samples, and earthwork recommendations. It provides detailed findings on fill soils, groundwater, and subsurface variations, supported by maps and appendices with field exploration and laboratory testing data. The report is intended for use by the college and its design team and is not a bidding document but may inform potential contractors.
PDF
PDF, High priority: read this first38 pages · bid-documents
HighAI Summary for Informal CWA Bid Documents - Mt. San Antonio CCD: This document contains informal bid documents for a project at Mt. San Antonio Community College District. It includes a Non-Collusion Declaration affirming the bid's authenticity and compliance with anti-collusion laws, a Bid Bond outlining surety obligations and conditions for bid withdrawal or contract award, and an Agreement section detailing the contract terms including scope of work, contract time, contract price, and liquidated damages. The document is intended to support the bidding and contracting process for the specified project.
PDF
PDF, High priority: read this first30 pages · bid-documents
HighAI Summary for Informal Non-CWA Bid Documents - Mt. San Antonio CCD: This document contains informal non-CWA bid documents for Mt. San Antonio Community College District. It includes a Non-Collusion Declaration affirming the bid is genuine and not collusive, a Bid Bond outlining surety obligations and conditions for the bid, and an Agreement section detailing the contract terms between the District and the Contractor. Key elements include bid bond conditions, contract price, contract time, and liquidated damages provisions. The document is intended to support the bidding and contracting process for a public works project under Bid No. and Project Name placeholders.
PDF
PDF, High priority: read this first52 pages · specifications
HighAI Summary for Mt SAC Wildlife Sanctuary Water System Replacement Project Technical Specifications: This document contains the technical project specifications for the Mt SAC Wildlife Sanctuary Water System Replacement Project dated October 17, 2025. It includes detailed sections on demolition, earthwork, exterior improvements, and utilities, specifying requirements for demolition work, protection of existing facilities, environmental and safety standards, and restoration of landscaping. The specifications outline quality assurance, job conditions, performance standards, and field quality control measures to ensure proper execution of the water system replacement at Mt San Antonio College, Walnut, CA.
PDF
PDF, High priority: read this first47 pages · contract-document
HighAI Summary for Mt. San Antonio College Community Workforce Agreement: This Community Workforce Agreement is entered into by Mt. San Antonio Community College District, the Los Angeles/Orange Counties Building and Construction Trades Council, and signatory Craft Councils and Unions. It establishes labor relations guidelines and procedures for capital construction and major renovation projects funded by Bond Measure RR or Measure GO. The agreement mandates contractors to adhere to its terms, including signing a Letter of Assent, and outlines roles such as the Community Workforce Coordinator for compliance monitoring. Key content includes definitions, scope, union recognition, wages, work conditions, grievance settlement, and regulatory compliance. The document is critical for contractors bidding on or performing project work under the College's construction contracts.
PDF
PDF, High priority: read this first11 pages · presolicitation
HighAI Summary for Prequalification for Wildlife Sanctuary Waterline Replacement Project - Mt. San Antonio College: This document is a prequalification solicitation for the Wildlife Sanctuary Waterline Replacement Project at Mt. San Antonio College, released in 2026. It outlines the requirement for contractors to undergo a mandatory prequalification process before bidding, ensuring they have the necessary experience, technical qualifications, financial capacity, and licensing. The project involves replacing the existing water distribution and irrigation systems within the sanctuary using HDPE piping, including demolition, trenching, and installation of new water infrastructure while protecting the environment. Key dates include a mandatory job walk on March 6, 2026, and prequalification package submission by March 13, 2026. The document includes scope of work, engineer's estimate, and submission instructions.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Wildlife Sanctuary Plans August 1966 Mark Ups: This document contains detailed plans and specifications for a Wildlife Sanctuary at Mt San Antonio College, Walnut, California, created by John Robert Russell. It includes an index of drawings covering site preparation, grading, staking and layout, irrigation and sprinkler systems, construction details, footbridge, sun shelter, and planting legend. The planting legend lists various trees and shrubs with botanical names, sizes, container types, and remarks. The document serves as a technical guide for the construction and landscaping of the sanctuary, dated August 1966.
PDF
PDF, Low priority3 pages · other
LowAI Summary for WLS New Waterline Site Utility Exhibit 202508: This document appears to be a utility exhibit related to a new waterline site, identified as WLS New Waterline Site Utility Exhibit 202508. The content includes numerous references to utility features such as vents, asphalt, concrete, benches, elevations, easements, and various utility lines including sewer, gas, and electrical. It also mentions specific locations and infrastructure elements like wildlife sanctuary, ponds, bridges, and roads. The document seems to be a technical or planning exhibit with detailed annotations and measurements but lacks typical solicitation or contract language.
Responses must be submitted via Mt. SAC's eProcurement Portal , located on Mt. SAC's Purchasing Website prior to 4:30 pm on Friday, March 13, 2026 . The District will only accept responses submitted electronically via Mt. SAC's eProcurement Portal. Established in 1966, the Mt. San Antonio College Wildlife Sanctuary is a 26-acre natural habitat and outdoor classroom that provides critical instruction and observation opportunities for biology, horticulture, ecology, and sustainability studies. The sanctuary serves as a preserve for diverse ecosystems—including coastal sage scrub, oak woodland, and freshwater ponds—and provides a migratory refuge for various animals, such as the federally threatened coastal California gnatcatcher. The existing waterline infrastructure serving the sanctuary (including piping, valves, and control equipment) has been in service for approximately 58 years. Most downstream outputs are currently broken beyond repair. Over the past five to ten years, the main water supply has experienced multiple failures that have threatened these critical habitats and put established ecosystems at risk by impacting the ability to maintain water levels in the sanctuary's three water bodies. Furthermore, instructional activities for Natural Sciences and Horticulture are currently limited due to the lack of functional irrigation for exhibition gardens and habitat development. In 2024, the Sand Volleyball & Lot W project installed a new 8-inch main waterline loop through Lot W, which included a water service pipe stub branched into the WLS specifically to facilitate this planned infrastructure replacement. This project will provide and install new main waterline infrastructure and conveyance equipment, ensuring reliable water service for the sanctuary's water bodies and a distributed system of hose connections for spot irrigation. The project is part of the 2021/22 State Scheduled Maintenance (SSM) Program. Design was completed in Spring 2025 by Psomas Engineering in coordination with the Facilities Maintenance & Operations team and the Natural Sciences Division. To avoid impacts on instructional operations and mitigate weather complications during extensive trenching work, construction is planned to occur during the summer months.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.