Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Prequalification for Wildlife Sanctuary Waterline Replacement Project

Closed
2026-049State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Mt. San Antonio College is seeking qualified contractors to submit responses through its eProcurement Portal by 4:30 pm on March 13, 2026, for a waterline replacement project at its 26-acre Wildlife Sanctuary. The sanctuary, established in 1966, functions as a natural habitat and outdoor classroom supporting studies in biology, horticulture, ecology, and sustainability by preserving diverse ecosystems and providing habitat for protected species. The existing waterline infrastructure, which has been in place for nearly six decades, is largely failing, causing multiple supply disruptions that threaten the sanctuary’s ecosystems and limit instructional activities reliant on functional irrigation. The project involves the installation of new main waterline infrastructure and conveyance equipment, including a distributed hose connection system to support spot irrigation throughout the sanctuary. This work is a component of the 2021/22 State Scheduled Maintenance Program, designed by Psomas Engineering in collaboration with the college’s Facilities Maintenance & Operations and Natural Sciences teams. The recent installation of an 8-inch main waterline loop through Lot W has set the stage for this upgrade. Construction is scheduled for the summer to minimize disruption to instructional programs and avoid weather-related difficulties during trenching. The solicitation is managed by Mt. SAC’s Facilities, Planning, and Management office, located in Walnut, California, with primary contact available for inquiries.

General Info

Mt. San Antonio College seeks contractors for summer 2026 waterline replacement at Wildlife Sanctuary.

Documents

17
PDF, High priority: read this first12 pages · construction-drawings
High
PDF, High priority: read this first21 pages · prequalification-application
High
PDF, High priority: read this first23 pages · contract-document
High
PDF, High priority: read this first47 pages · contract-document
High
PDF, High priority: read this first59 pages · escrow-agreement
High
PDF, High priority: read this first31 pages · rfb
High
PDF, High priority: read this first63 pages · general-conditions
High
PDF, High priority: read this first62 pages · general-conditions
High
PDF, High priority: read this first33 pages · geotechnical-report
High
PDF, High priority: read this first38 pages · bid-documents
High
PDF, High priority: read this first30 pages · bid-documents
High
PDF, High priority: read this first52 pages · specifications
High
PDF, High priority: read this first47 pages · contract-document
High
PDF, High priority: read this first11 pages · presolicitation
High
PDF, High priority: read this first12 pages · specifications
High
PDF, Low priority3 pages · other
Low
PDF

Read all 17 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 10 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 20 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Facilities, Planning and Management
Contacts2 people available
OfficeWalnut, CA, 91789, USA

Interested Companies (22)

American Pipeline ServicesMONROVIA, CA
BidamericaSheridan, WY
BidJudge.comHigley, AZ

See All 22 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Responses must be submitted via Mt. SAC's eProcurement Portal , located on Mt. SAC's Purchasing Website prior to 4:30 pm on Friday, March 13, 2026 . The District will only accept responses submitted electronically via Mt. SAC's eProcurement Portal. Established in 1966, the Mt. San Antonio College Wildlife Sanctuary is a 26-acre natural habitat and outdoor classroom that provides critical instruction and observation opportunities for biology, horticulture, ecology, and sustainability studies. The sanctuary serves as a preserve for diverse ecosystems—including coastal sage scrub, oak woodland, and freshwater ponds—and provides a migratory refuge for various animals, such as the federally threatened coastal California gnatcatcher. The existing waterline infrastructure serving the sanctuary (including piping, valves, and control equipment) has been in service for approximately 58 years. Most downstream outputs are currently broken beyond repair. Over the past five to ten years, the main water supply has experienced multiple failures that have threatened these critical habitats and put established ecosystems at risk by impacting the ability to maintain water levels in the sanctuary's three water bodies. Furthermore, instructional activities for Natural Sciences and Horticulture are currently limited due to the lack of functional irrigation for exhibition gardens and habitat development. In 2024, the Sand Volleyball & Lot W project installed a new 8-inch main waterline loop through Lot W, which included a water service pipe stub branched into the WLS specifically to facilitate this planned infrastructure replacement. This project will provide and install new main waterline infrastructure and conveyance equipment, ensuring reliable water service for the sanctuary's water bodies and a distributed system of hose connections for spot irrigation. The project is part of the 2021/22 State Scheduled Maintenance (SSM) Program. Design was completed in Spring 2025 by Psomas Engineering in coordination with the Facilities Maintenance & Operations team and the Natural Sciences Division. To avoid impacts on instructional operations and mitigate weather complications during extensive trenching work, construction is planned to occur during the summer months.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS