Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pressure Grouting and Foundation Stabilization

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sacramento is seeking a subcontractor for pressure grouting and foundation stabilization to support prime contractors on various bridge projects. The scope of work involves using high-pressure grout pumps and specialized mixtures to pump grout under the Abutment 1 footing, ensuring bearing is re-established across its entire length and width. The primary goal is to deliver a stabilized bridge footing with a verified bearing capacity. Qualified candidates must possess specialized grouting certification and relevant experience in foundation stabilization. This subcontract falls under NAICS code 238990 and is based in Sacramento, California. There is no specific set-aside status designated for this opportunity.

General Info

Place of Performance

Sacramento, CA, USA

Set-Aside

NONE

Documents

This scope was carved out of R15222210.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction Management Services For Tangerine Avenue Bridge And Watt Avenue Bridge Scour Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 17 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 6 documents on the prime contractFrom Construction Management Services For Tangerine Avenue Bridge And Watt Avenue Bridge Scour Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CITY OF SACRAMENTO
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs pressure grouting to re-establish bearing for bridge footings for prime contractors on City of Sacramento bridge projects. Pumps grout under the Abutment 1 footing to re-establish bearing along its entire length and width using high-pressure grout pumps and specialized grout mixtures. Requires specialized grouting certification and experience. Delivers a stabilized bridge footing with verified bearing capacity.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 3 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → CITY OF SACRAMENTO

Same awarding agency

NAICS: 541330
New
SLED
Construction Management Services For Tangerine Avenue Bridge And Watt Avenue Bridge Scour Project
Solicitation # R15222210
The City of Sacramento is soliciting construction management services for the Tangerine Avenue Bridge and Watt Avenue Bridge scour projects. The selected consultant will serve as the Resident Engineer, providing a licensed Professional Civil Engineer registered in the State of California to oversee project inspection, materials testing, contract administration, quality control, and safety. Specific work includes installing concrete slope paving to mitigate scour and protect foundations at the Tangerine Avenue Bridge, as well as repairing approximately 500 feet of channel lining. The contract is structured as a Nonprofessional Services Agreement with an initial term that may be extended up to a maximum of five years, with specific projects assigned via individual Task Orders. Proposals are evaluated based on a multi-stage process including a written submission and potential interviews. Key evaluation factors include the project team's qualifications, understanding of the scope of work, quality control measures, and the proposed schedule. The contract requires strict adherence to federal and state regulations, including FAR compliance for other direct costs, audit compliance for contracts over $150,000, and certification regarding debarment and non-discrimination. Payment is made monthly in arrears based on actual costs incurred, with invoices submitted in triplicate to the City's Contract Administrator. There is no specified set-aside status for this solicitation.
Engineering Services

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS