Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Prestressed Concrete Tank Specialist

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Florida → EngineeringView Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of ITB# 2025/2026-A12.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyFlorida → Engineering
ContactsNo contacts available
OfficeN/A
Organization / Agency
Florida → Engineering
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs specialized water storage tanks for prime contractors on Clay County Utility Authority (CCUA) utility infrastructure projects. Installs wire-wound prestressed concrete tanks featuring Type II core walls using specialized wire-wound prestressing equipment. Delivers a fully installed and tested prestressed concrete tank.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
IFB No. 132406 Fence Repair and Replacement, El Centro Armory
Solicitation # 132406
The California Military Department has issued Invitation for Bid No. 132406 for the repair and replacement of a vehicle-collision-damaged entry control fence at the El Centro Armory in El Centro, California. The project requires the contractor to remove damaged concrete footings, chain-link fabric, posts, and hardware, and install matching replacement components that mirror the existing system's height, material, gauge, and security features. All work must be completed within 180 calendar days, with physical construction beginning within 14 days of the Notice to Proceed. The award will be granted to the lowest responsive responsible bidder, with a bid verification meeting potentially required to confirm pricing and scope understanding. Eligible bidders must possess a valid California C-13 Fencing Contractor license and adhere to State General Prevailing Wage Rates, OSHA requirements, and the California Building Code. Bonding is required based on contract value: bid bonds for amounts exceeding 24,999.99 dollars, performance bonds for amounts over 9,999.99 dollars if progress payments are made, and payment bonds for public works expenditures exceeding 24,999.99 dollars. Bids must be submitted as a single PDF via email to PWC@cmd.ca.gov by October 8, 2026, at 2:00 PM, with the subject line containing the IFB number, project title, and business name. Key deliverables include material submittals and a project schedule due five days after the Notice to Proceed, and final project closeout documents upon completion.
California Military Department

POSTED

about 19 hours ago

DEADLINE

in 26 days
View Details
NAICS: 238990
New
SLED
GARDEN FENCING INSTALLATION
Solicitation # Q27000396
The Hawaii Department of Health is seeking a contractor for the purchase and installation of approximately 1,700 feet of pig and hog proof fencing to enclose a garden area at the Hawaii State Hospital in Kaneohe, Hawaii. The project requires the installation of seven-foot galvanized T-posts, double-dipped galvanized 1348 hog fence fabric, and specific boss and gate posts set in concrete. The scope includes a 12-foot total gate opening consisting of two six-foot wide gates made of galvanized Schedule 40 pipe and wire mesh. Performance is scheduled from October 1, 2026, through January 30, 2027, with a maximum work duration of ten business days. Work must be performed between 7:30 am and 3:00 pm, Monday through Friday. Award will be granted to the lowest responsible and responsive offeror. Mandatory requirements for bidders include attendance at a site walkthrough on September 15, 2026, registration to do business in the State of Hawaii, and the submission of a Certificate of Vendor Compliance via HIePRO. Contractors must maintain general liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as 1 million dollars in automobile insurance. Required submittals include Offer Form OF-1 and a liability license. Payment is contingent upon the submission of original invoices and the procurement of tax clearance certificates from the State of Hawaii and the Internal Revenue Service.
Department of Health

POSTED

about 19 hours ago

DEADLINE

in 13 days
View Details
NAICS: 238990
New
SLED
Country Club Road Park Synthetic Turf Improvements
Solicitation # 2027-008
The City of Greer is soliciting proposals for the installation of athletic-grade synthetic turf foul territories on two existing baseball fields at Country Club Road Park in Greer, South Carolina. The scope of work includes the excavation of foul territory areas to approximately eight inches below finished grade, hauling and disposal of spoils, grading, aggregate base construction, drainage improvements, and the installation of concrete edging. The contractor must also provide permanently inlaid white synthetic turf markings for batter's boxes, catcher's boxes, coach's boxes, and foul lines, ensuring these are not painted. The project is intended to be performed between the notice to proceed and February 12, 2027. Qualified offerors must have a minimum of five years of experience and provide proof of general liability and worker's compensation insurance. For contracts exceeding 50,000 dollars, performance and payment bonds of 100 percent of the contract price are required. Proposals are due by September 25, 2026, and will be evaluated based on the project approach, experience with similar projects, proposed schedule, materials, and price. Final acceptance is contingent upon a successful walkthrough with the City Project Manager, the correction of any identified deficiencies, and the submission of warranty documentation, maintenance manuals, and approved shop drawings.
Public Services

POSTED

about 21 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Florida → Engineering

Same awarding agency

NAICS: 237110
New
SLED
Mid-Clay Water Reclamation Facility (WRF) Ground Storage Tank (GST) No. 3
Solicitation # ITB# 2025/2026-A12
The Clay County Utility Authority (CCUA) has issued solicitation ITB# 2025/2026-A12 for the construction of a 750,000-gallon prestressed concrete ground-level reclaimed water storage tank (GST #3) and associated yard piping at the Mid-Clay Water Reclamation Facility in Middleburg, Florida. With a project budget of 1.5 million dollars, the scope includes site preparation using compacted fill, mobilization, environmental protection, and the delivery of record drawings. The contract will be awarded to the lowest responsive responsible bidder, with a focus on compliance, bidder qualifications, and financial ability. Bids must be submitted via the OpenGov Procurement Portal by October 9, 2026, at 2:00 P.M. EDT, accompanied by a five percent bid security. Eligible contractors must be licensed Florida Underground or General Contractors with at least three years of business history and a record of performing satisfactory work for a Florida government entity within the last three years. Additionally, bidders must have served as the Prime Contractor for at least three lift stations with an average day flow rate of 750 GPM or more within the last ten years. The project timeline requires material procurement to begin within 10 calendar days of the Notice to Proceed, with substantial completion due within 240 days and final completion within 270 days. The agreement is governed by EJCDC C-700 Standard General Conditions with specific supplementary modifications, including a 45-day payment cycle and a one-year statute of limitations for claims. Contractors must provide performance and payment bonds equal to the contract price and maintain comprehensive general liability insurance, including explosion, collapse, and underground coverages. Quality control is managed through a dual-inspection process involving both the contractor's CQC Plan Manager and an independent testing firm employed by the owner.
Water and Sewer Line and Related Structures Construction

POSTED

about 21 hours ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS