Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 1, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Princess Campground Reconstruction

Awarded
AG-9A40-S-09-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Princess Campground Reconstruction project, solicitation AG-9A40-S-09-0003, is a total small business set-aside contract awarded by the USDA Forest Service for work on the Hume Lake Ranger District of the Sequoia National Forest in California. With a government estimate between 1 million and 2 million dollars, the project involves extensive infrastructure improvements and site rehabilitation. Key deliverables include the reconstruction of 50 living areas with new fire rings and tables, the paving of 1.35 miles of road along with parking spurs, toilet building access, and host site pads, and the installation of 5,500 linear feet of asphalt berm. The scope of work further encompasses significant utility upgrades, including the replacement of 5,315 linear feet of waterline, 2,300 linear feet of power cables, and the installation of a new generator house and RV water tower washout station. Demolition requirements include the removal of existing fire rings, tables, hydrants, and roadway gates. The project is subject to strict fire prevention and suppression requirements during the Fire Precautionary Period and adheres to California prevailing wage determinations. Performance was scheduled to begin in September 2009 with a completion deadline of September 1, 2010.

General Info

Contract Value

$742,515

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Hume Lake Ranger District, DUNLAP, CA, 93621-9704, USA

Set-Aside

NONE

Award Issued Date

Documents

9
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High
PDF, Low prioritybid-bond
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 26, 2009 to May 25, 2009. The notice description changed.

Notice updated

Response deadline changed from May 25, 2009 to May 26, 2009. The notice description changed.

Deadline changed

Response deadline changed from May 26, 2009 to May 25, 2009.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Sierra National Forest
Contacts2 people available
OfficeCLOVIS, CA, 93611, USA
Office AddressCLOVIS, CA, 93611, USA
Contacts
Patrick J GallegosContracting Officer
Gloria J. TaylorProcurement Assistant

Full Description

Show more
The project is located on the Hume Lake Ranger District of the Sequoia National Forest. From Fresno at S.H. 99/180 take S.H. 180 east for 52.5 miles to the Sequoia/Kings Canyon National Park Entrance Station. Drive another 1.5 miles to the - wye - stay to the left and drive through the park toward Cedar Grove for 7.0 miles to Princess Campground on the right hand side of the road. This project work includes reconstructing 50 living areas, installing 50 fire rings and 50 tables, reconstructing and paving 1.35 miles of single and double lane road, paving 8 parking spurs, paving access to 8 toilet buildings, paving 2 host site pads, paving RV dump station access road, paving 5500 linear feet of asphalt berm, replacing 1 hydrant, replacing 3 campground and 1 entrance gates, replace 5315 linear feet of waterline including drains, replace 2300 linear feet of power cables from well head to generator house, replace generator house, install/replace 21 valves with valve boxes, abandoning and installing 2 leach fields, pumping out 2 septic tanks, installing new RV water tower washout station and potable water fill, installing 2 new RV pedestals, installing manway pumpout for host site septic tank, and installing government furnished generator building. Demolition and removal of existing 50 fire rings, 50 tables, and hydrant with sump within KIOSK area, water tower and water tower hydrant at RV dump station, generator building and 4 roadway gates. Estimated Start Date: September 8, 2009 Gov't Estimate: Between $1,000,000.00 and $2,000,000.00 Estimate Date of Solicitation Posting: April 23, 2009 A pre-bid conference/tour will be held on May 13, 2009 at 11:00 A.M., weather permitting, at the project site. Refer questions concerning the project to Steven Ray, +1 (555) 000-0000 extension 1140.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS