This Solicitation opportunity from Pennsylvania was posted on December 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Township of Upper Southampton is inviting sealed bids for the Princeton Road Drainage Project, with bids due by 11:00 A.M. on January 10, 2024. The project involves comprehensive stormwater management improvements along Princeton Road, including the removal and replacement of storm sewer systems, inlets, headwalls, rip rap aprons, grading, seeding, stabilization, tree removal, erosion sediment control installation and removal, utility relocation, milling, and pavement restoration. Bidders can access all necessary documents and submit their bids online at no cost through PennBid™, with detailed specifications available on the platform.
Bids must be accompanied by a bid bond or certified check for at least 10% of the bid amount and include proof of insurance and bonds for performance, payment, and maintenance, all subject to approval by the township. The project is subject to Pennsylvania Prevailing Wage Act requirements, and bidders are bound to keep their bids open for 60 days after opening. The township reserves the right to reject any or all bids, modify the scope of work, or adjust quantities as needed, with contract awards based on the lowest responsible bid considering both the base bid and any selected alternatives. The project plans and specifications were prepared by Tri-State Engineers and Land Surveyors, Inc., and the project size ranges from $500,000 to $1,500,000.
PDF, High priority: read this first2 pages · specifications
HighAI Summary for 00 21 13.1 - Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It outlines the process for downloading documents, submitting and updating electronic bids, and specifies the required attachments, including the Bid Bond, Non-Collusion Affidavit, and Bidder Qualification Statement.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for 21-11008 Princeton Road Drainage Project - Addendum No. 1: Addendum No. 1 dated January 3, 2025, for the Princeton Road Drainage Project in Upper Southampton Township. It adds a line item for 275 SY of 6" 2A Stone subbase for the driveway to the Bid Tab and clarifies that the contractor must protect, rather than lower, the existing gas lateral during storm pipe installation.
PDF
PDF, High priority: read this first12 pages · wage-determination
HighAI Summary for 24-10239 Princeton Road Drainage Project - Wage Determination: Prevailing minimum wage determination issued by the Bureau of Labor Law Compliance for the Princeton Road Drainage Project (Serial Number 24-10239) in Upper Southampton, Bucks County. The document specifies hourly rates and fringe benefits for various labor classifications, including carpenters, electricians, and iron workers, with a determination date of 11/22/2024.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for 47-21-11002 - Princeton Road Drainage Plan Set: Technical plan set for the Princeton Road Drainage project (dated 11-13-24), containing engineering profiles for proposed inlets and headwalls, as well as construction details for fencing, tree planting, asphalt mixture design, and milling.
PDF
PDF, High priority: read this first4 pages · past-performance
HighAI Summary for Contract 21-11002: Bidder Qualification Statement: A mandatory Bidder Qualification Statement for Contract No. 21-11002 (Princeton Road Drainage Project). The document requires bidders to provide organizational background, work history of similar projects completed or in progress over the last five years, references, financial statements, and a sworn affidavit of certification. Failure to submit this completed form may result in bid rejection.
PDF
PDF, High priority: read this first1 page · ifb
HighAI Summary for Contract 21-11002 - Princeton Road Drainage Project Advertisement for Bids: Upper Southampton Township is soliciting sealed bids for the Princeton Road Drainage Project (Contract 21-11002). The scope includes storm sewer system replacement, inlet replacement, headwall installation, grading, and pavement restoration. Bids are due by 11:00 A.M. on Friday, January 10, 2025, via PennBid. Requirements include a 10% bid bond and compliance with the Pennsylvania Prevailing Wage Act.
PDF
PDF, High priority: read this first3 pages · rfb
HighAI Summary for Contract 21-11002: Princeton Road Drainage Project - Bidder's Acknowledgement Form: A formal Bidder's Acknowledgement Form for the Princeton Road Drainage Project (Contract 21-11002). The document requires bidders to certify they have reviewed all bidding documents, visited the site, and agree to the terms, conditions, and project timelines, including a 30-day substantial completion period. It serves as a critical submission component requiring signatures and a list of required attachments such as bid bonds and non-collusion affidavits.
PDF
PDF, High priority: read this first2 pages · rfb
HighAI Summary for Contract 21-11002: Princeton Road Drainage Project Table of Contents: Table of Contents for the Upper Southampton Township Princeton Road Drainage Project (Contract 21-11002). The document outlines the structure of the procurement package, including Division 00 (Procurement and Contracting Requirements), Division 01 (General Requirements), and Divisions 2-35 (Technical Requirements), covering bid forms, bonds, general conditions, and specific technical specifications for drainage and paving.
PDF
PDF, High priority: read this first10 pages · itb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a procurement project. It outlines the rules and procedures for submitting bids, including bidder qualifications, site examination requirements, the use of bidding documents via PennBid, and the evaluation process for awarding the contract to the lowest responsive and responsible bidder.
PDF
PDF, High priority: read this first1 page · bid-form
HighAI Summary for Document 00 41 00 - Bid Form: A placeholder document for the Bid Form (Document 00 41 00), directing users to the PennBid website portal to locate the actual form under the Bids tab for the specific contract.
PDF
PDF, High priority: read this first18 pages · specifications
HighAI Summary for Document 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCIC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies requirements for contract documents, subsurface conditions, and reference points. It also references compliance with the Pennsylvania Prevailing Wage Act and the Public Works Employment Verification Act.
PDF
PDF, High priority: read this first68 pages · contract-document
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: This document contains the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). It establishes the legal and operational framework for construction projects, including definitions, contractor and owner responsibilities, payment terms, change orders, dispute resolution, and insurance requirements.
XLSX
XLSX, High priority: read this first8 pages · specifications
HighAI Summary for Pricing Section BT-38JK: A pricing comparison spreadsheet for project BT-38JK, detailing bid amounts from multiple vendors (including A.H. Cornell and Son Inc., Associated Paving Contractors, Inc., and others). The document includes a bid schedule with unit prices and total costs for items such as roadway saw cutting, tree removal, and driveway removal, identifying the lowest bidders for specific line items.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Princeton Road Drainage Project 21-11002 - List of Drawings: A list of drawing sheets for the Princeton Road Drainage Project (Project 21-11002), detailing 8 total sheets including the cover sheet, existing features, construction plans, profiles, and erosion sediment control details.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for Section 01 11 13 - Summary of Work (Princeton Road): This document provides the Summary of Work for a project involving the removal and replacement of the storm sewer system, inlets, headwalls, and rip rap aprons, along with grading, seeding, and pavement restoration along Princeton Road. It outlines the scope of work, contractor responsibilities regarding site use and utility protection (per Pennsylvania Act 287), and specifies that the contractor must maintain one lane of traffic during construction.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: Technical specification section detailing the measurement and payment criteria for various construction activities, including tree removal, roadway saw cutting, driveway removal, pipe/structure removal, and installation of headwalls and inlet boxes. It defines the unit price payment method and the responsibilities of the Contractor regarding traffic control and work protection.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification section outlines the administrative requirements for contract management, including the submission of the Schedule of Values, procedures for applications for payment (using EJCDC Form C-620), change order processes (stipulated price, unit price, and time and material), and the handling of project alternates.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and meeting protocols. It outlines the responsibilities for preconstruction, progress, and pre-installation meetings, as well as survey control and construction coordination to minimize disruption to the Owner.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Section 01 33 00 - Submittals: This technical specification section outlines the requirements and procedures for project submittals, including construction progress schedules, product data, shop drawings, samples, design data, test reports, and certificates. It defines the submission process, review timelines, and distribution requirements for the Engineer and Owner.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section (01 42 13) providing a comprehensive schedule of acronyms and their associated organizations or references (e.g., AASHTO, ANSI, NFPA, PennDOT) used throughout the Project Manual.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specification section 01 55 26 detailing the contractor's obligations for traffic regulation. It covers the implementation of Traffic Control Plans, notification requirements for PennDOT and local municipalities, parking controls, flag persons, haul routes, and the use of signage and safety devices to ensure safe traffic movement during construction.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Control: Technical specifications for Soil Erosion and Sediment Control (Section 01 57 13). The document outlines requirements for implementing the Soil Erosion and Sediment Control Plan, adherence to Pennsylvania DEP and PennDOT Publication 408 standards, material requirements for silt fences and aggregates, and execution procedures for temporary and permanent control measures during utility construction.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for materials and equipment, including transportation, handling, storage, protection, substitution procedures, and manufacturer equipment guarantees.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the requirements for contract closeout, including final cleaning, adjusting, project record documentation, punchlist completion, and final payment application procedures.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 01 71 13 - Mobilization: Technical specification section 01 71 13 detailing the requirements for mobilization, including the assembly of site facilities, permits, and insurance. It specifies that mobilization is incidental to other work and will not be paid as a separate line item.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 31 23 16 - Rock Removal: Technical specifications for Section 31 23 16, detailing the requirements for rock removal during excavation. It defines 'rock' based on equipment capability, prohibits blasting, and outlines mechanical removal methods, including the use of expansive tools and wedges. The document also specifies requirements for utility trenches and field quality control inspections.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction associated with utility construction and structure installation. The document details quality assurance standards (PennDOT, ASTM), compaction density requirements (90-95%), submittal requirements for certifications, and specific material requirements for pipe bedding and embedment based on pipe type (PVC, Ductile Iron, Copper, Concrete, and Steel).
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 31 37 16 - Energy Dissipator: Technical specifications for the installation of a rock energy dissipator. The document outlines quality assurance standards based on Pennsylvania Department of Transportation Publication 408, requirements for rock and geotextile fabric materials, and execution procedures for preparation and installation.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 32 01 16.71 - Milling of Asphalt Pavement Surface: Technical specifications for the milling of asphalt pavement surfaces, requiring a 1.5 inch depth milling in accordance with PennDOT publication 408. The document details equipment requirements, milling operations, surface tolerance standards using a ten-foot straightedge, and the disposal of milled materials.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 32 01 17.61 - Polymer Modified Asphalt Joint and Crack Sealing: Technical specifications for the cleaning and sealing of longitudinal and transverse joints using polymer modified asphalt. The document details material requirements (AC-20), certification processes per PennDOT standards, mixing proportions for reclaimed granulated rubber, surface preparation via air blasting, and application constraints regarding temperature and tooling.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 32 12 00 - Asphalt Paving: Technical specifications for asphalt paving, including the installation of Warm Mix Asphalt (WMA) binder and wearing courses, tack coat application, and pavement markings. The document mandates compliance with PennDOT Publication 408 and Bulletin 27 standards, outlines submittal requirements for certifications, and defines execution tolerances for flatness and thickness.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, covering temporary and permanent paving. The document outlines requirements for bituminous materials, aggregates, and execution methods in accordance with Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 32 13 10 - Erosion Control Blanket: Technical specifications for the installation of erosion control matting. The document outlines the use of machine-produced mats consisting of 70% straw and 30% coconut fiber (similar to Curlex Netfree), including requirements for manufacturer shop drawing submittals and installation according to manufacturer guidelines.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding: Technical specifications for finish grading, seeding, and sodding. The document outlines requirements for topsoil placement, soil conditioning, seed mixtures, fertilizer, lime, and sod installation, including quality assurance standards based on Pennsylvania Department of Transportation Publication 408.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 33 41 00 - Storm Drain Pipe: Technical specifications for the installation of storm sewer pipelines, including requirements for elliptical reinforced concrete pipe and HDPE pipe. The document outlines quality assurance standards (AASHTO, ASTM, PennDOT), submittal requirements, product delivery, and detailed execution instructions for trench preparation, pipe laying, and backfilling.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 33 44 14 - Storm Inlets, Catch Basins, Endwalls, End Sections: Technical specifications for the installation of storm drainage curb inlets, catch basins, pipe endwalls, and end sections. The document outlines quality assurance standards (ASTM and PADOT), approved manufacturers, material requirements for concrete and iron castings, and execution procedures for excavation and construction.
PDF
PDF, High priority: read this first7 pages · contract-document
HighAI Summary for Upper Southampton Township - Princeton Road Storm Sewer Agreement: Agreement between Upper Southampton Township (Owner) and a Contractor for the removal and replacement of the storm sewer system along Princeton Road. The scope includes inlet replacement, headwall installation, rip rap aprons, grading, seeding, and pavement restoration. The contract specifies a substantial completion timeframe of 45 calendar days and final completion within 60 calendar days, with liquidated damages set at $200.00 per day for delays. Payment is based on unit prices with a retainage structure and interest provisions per Pennsylvania law.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for 21-11002 Princeton Road Drainage Project - Certificate of Insurance: Document 00 62 16 specifies the insurance requirements for the Princeton Road Drainage Project (Contract 21-11002), identifying Upper Southampton Township and Tri-State Engineers and Land Surveyors, Inc. as additional insureds.
PDF
PDF, Low priority1 page · other
LowAI Summary for 21-11002 Princeton Road Drainage Project - Non-Collusion Affidavit: A Non-Collusion Affidavit for the 21-11002 Princeton Road Drainage Project for Upper Southampton Township. The document requires the bidder to swear under oath that they have not engaged in collusion or restraint of free, competitive bidding and have not been convicted of conspiracy or collusion regarding public contracts within the last three years.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Appendix B - Public Works Employment Verification Form: A Commonwealth of Pennsylvania certification form requiring contractors and subcontractors to verify compliance with the Public Works Employment Verification Act through the federal E-Verify Program.
PDF
PDF, Low priority1 page · other
LowAI Summary for Contract 21-11002 - Consent of Surety to Final Payment: A legal form for the Princeton Road Drainage Project (Contract 21-11002) used by a surety company to approve final payment to the contractor, confirming that labor and material claims have been settled while maintaining the surety's bond obligations to Upper Southampton Township.
PDF
PDF, Low priority3 pages · payment-bond
LowAI Summary for Contract 21-11002 - Construction Payment Bond (Princeton Road Drainage Project): A standard Construction Payment Bond form for the Princeton Road Drainage Project (Contract No. 21-11002) for Upper Southampton Township. The document outlines the legal obligations of the Contractor and Surety to ensure payment for labor, materials, and equipment furnished by claimants.
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for Contract 21-11002: Contractor's Affidavit - Princeton Road Drainage Project: A Contractor's Affidavit for the Princeton Road Drainage Project (Contract 21-11002) between Upper Southampton Township and the contractor. The document serves as a sworn statement that all labor, materials, and outstanding claims associated with the work and approved change orders have been paid in full.
PDF
PDF, Low priority2 pages · maintenance-bond
LowAI Summary for Contract 21-11002 Maintenance Bond - Princeton Road Drainage Project: A legal bond template for Contract 21-11002 (Princeton Road Drainage Project) requiring the Principal to provide a maintenance bond for 15% of the agreement price. The bond ensures the repair of defects in materials or workmanship for 18 months following final completion and acceptance of the work.
PDF
PDF, Low priority2 pages · contract-document
LowAI Summary for Contract 21-11002 Princeton Road Drainage Project - Contractor's Release of Liens: A legal release of liens form for the Princeton Road Drainage Project (Contract 21-11002) between Upper Southampton Township and the contractor. The document serves as a formal discharge of all claims and demands upon receipt of final payment.
PDF
PDF, Low priority3 pages · performance-bond
LowAI Summary for Contract 21-11002 - Princeton Road Drainage Project Performance Bond: A standard performance bond form for the Princeton Road Drainage Project (Contract No. 21-11002) for Upper Southampton Township. The document outlines the legal obligations of the Surety and Contractor to ensure the completion of the contract and the remedies available to the Owner in the event of a Contractor Default.
PDF
PDF, Low priority1 page · other
LowAI Summary for Contract No. 21-11002 - Agreement of Surety Company: A legal agreement form where a Surety Company commits to providing Performance and Payment Bonds (100% of contract amount) to Upper Southampton Township for the Princeton Road Drainage Project (Contract No. 21-11002) upon the award of the contract to the bidder.
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for Contract No. 21-11002 - Bid Bond (Princeton Road Drainage Project): A standard Bid Bond form for the Princeton Road Drainage Project (Contract No. 21-11002) for Upper Southampton Township, Bucks County, PA. The document outlines the legal obligations of the Bidder and Surety to pay the Owner in the event of a default in executing the contract agreement or providing required performance and payment bonds.
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for Contract No. 21-11002: Princeton Road Drainage Project - Title Sheet: Title page for the Project Manual regarding Contract No. 21-11002 for the Princeton Road Drainage Project. Prepared by Tri-State Engineers and Land Surveyors, Inc. for Upper Southampton Township, dated December 2024.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The Township of Upper Southampton, offices located at 939 Street Road, Southampton, PA 18966, will receive sealed bids online until 11:00 A.M., prevailing time on Friday, January 10th, 2024 at which time and place the bids shall be publicly opened and read aloud for:
Contract 21-11002–PRINCETON ROAD DRAINAGE PROJECT
This project consists of but is not limited to the removal and replacement of the storm sewer system, removal and replacement of the existing inlets, installation of a new headwalls, installation of rip rap apron, grading, seeding, stabilization, tree removal, installation and removal of erosion sediment controls, utility relocation, milling and pavement restoration and other associated improvements along Princeton Road.
All Bidding Documents and Solicitation details may be obtained at PennBid™ pennbid.bonfirehub.com/portal. Click on the “Solicitations” then “View” tabs. All documents, specifications, and drawings can be obtained, and secure bids submitted online at no cost. For bidders who are not the winning bid; there are absolutely no fees.
Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Township of Upper Southampton along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder.
The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of the Township of Upper Southampton and having as security thereon such Surety company or companies as are approved by the Township of Upper Southampton.
No pre-bid meeting will be held for this project.
This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended, and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry.
No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids.
The Township of Upper Southampton reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids.
The Township of Upper Southampton reserves the right to increase or decrease any or all of the quantities of work or to omit any of them, as it may deem necessary and such increase or decrease of the quantities given for any of the items shall not be considered as sufficient grounds for granting an increase in the unit prices bid. The contractor will be paid at the unit prices bid for actual work performed in accordance with the terms of the contract. Bid shall be awarded to lowest responsible bidder for combined base Bid and any Alternatives chosen by the Township.
The Plans and Specifications were prepared by Tri-State Engineers and Land Surveyors, Inc.
By order of: The Township of Upper Southampton
Owner: The Township of Upper Southampton
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award