Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

PRINTED CIRCUIT BOA

Active
N0038326RAA42Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract, titled "PRINTED CIRCUIT BOA" and issued by the Naval Supply Weapon Systems Support office of the Department of Defense, focuses on the repair, overhaul, testing, and inspection of specific electronic printed circuit boards as identified by drawing and specification references. The contractor is responsible for all aspects of the repair process, including providing necessary facilities, labor, materials, and tooling, while adhering strictly to approved manuals and specifications. The government will not supply any equipment such as fixtures, jigs, or special tooling. Repairs must restore items to a Ready For Issue (RFI) condition, ensuring operational reliability according to contract standards. Detailed procedures govern handling of items that are Beyond Economical Repair (BER), Missing on Induction (MOI), or require Over and Above Repair (OAR), all requiring written concurrence from Defense Contract Management Agency (DCMA) and approval from the Procuring Contracting Officer (PCO) prior to proceeding. Key contract performance requirements include strict adherence to MIL-STD-130 markings, maintenance of quality management systems compatible with ISO 9001 or SAE AS9100 standards, and calibration systems meeting recognized programs such as ANSI/NCSL Z540.3. The contract sets forth turnaround times for repair measured from physical receipt to government acceptance, with mandatory transaction reporting via the Commercial Asset Visibility (CAV) system. The contractor must maintain configuration management and provide secure, enclosed storage for items awaiting and completed repairs. Pricing and reconciliation terms are based on meeting specified repair turnaround times, and any contract changes or manufacturing source alterations must receive government approval. The contract has a one-year induction period post-award and includes stringent controls over purchased materials and parts, emphasizing new and approved components unless otherwise authorized.

General Info

Repair, overhaul, and test printed circuit boards with government-approved processes and strict quality standards.

Agency

Department Of Defense → Navsup Weapon Systems Support

NAICS

334412 - Bare Printed Circuit Board Manufacturing View NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type ||Cognizant DFAS |N00383|Cognizant DCMA |Cognizant DCMA |SEE SCHEDULE|SOURCE||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| SAFEGUARDING SENSITIVE CONVENTIONAL ARMS, AMMUNITION, AND EXPLOSIVES (NOV 2023)|9|||||||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| TYPE OF CONTRACT (DEV 2026-O0045)(MAR 2026)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| This requirement is for the repair of the items herein this solicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page of the contract) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTERGRATION; drawing number ( ;80249; ) ;8565178-1; , Revision ;5998-01-709-1187; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: PRINTED CIRCUIT BOA ;8565178-1; P/N, ;5998-01-709-1187; NSN, ;Available repair manuals, drawings and specifications per p/m requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. PRINTED CIRCUIT BOA ;BAE SYSTEMS INFORMATION AND ELECTRONIC SYSTEMS INTEGRATION; Company Name , ;450 PULASKI ROAD, GREENLAWN, NY 11740-1606; Address , ;80249; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract pertains to the repair of circuit card assemblies and outlines specific requirements for turnaround time, inspection, and acceptance. The repair turnaround time (RTAT) is measured from the physical receipt of the asset at the contractor’s facility, as documented in the commercial Asset Visibility system, to final government acceptance. The contractor must report all transactions promptly and meet the established RTAT for all assets, with a defined throughput constraint specifying the monthly number of units to be repaired. Pricing is tied to meeting these RTAT requirements, and any delays may result in negotiated adjustments. Assets must be received within 365 days of the contract award date unless otherwise agreed upon. Additional provisions include quality and inspection standards, safeguarding of sensitive items, adherence to Buy American and trade agreement requirements, and the use of specified payment and workflow systems. The contract also contains clauses related to equal opportunity, transportation of supplies by sea, security exclusions, and royalty information. The Department of Defense, through Navsup Weapon Systems Support, manages this contract with a solicitation deadline in mid-2026. The contractor’s compliance with these terms ensures timely repair and delivery of the specified components under government quality control and financial oversight.
Navsup Weapon Systems Support

POSTED

5 days ago

DEADLINE

in 27 days
View Details
NAICS: 334412
New
Federal
VIBRATION ANALYZERThis contract pertains to the manufacture and quality assurance of a Vibration Analyzer as specified by the Department of Defense through DLA Mechanicsburg. It incorporates strict quality control requirements, including adherence to ISO-9001 standards and higher-level inspection criteria. The contract mandates identification marking per MIL-STD-130 and prohibits the use or contamination by metallic mercury due to its corrosive and toxic properties, specifying rigorous handling and testing measures if mercury is functionally required. Changes to design, materials, or part numbers require prior written approval by the contracting officer, with specific coding procedures for different types of changes. The responsibility for inspection rests with the contractor, though the government reserves the right to perform additional assessments to ensure compliance. The contract employs a Lowest Price Technically Acceptable evaluation approach and requires electronic submission of invoices and receiving reports via the Procurement Integrated Enterprise Environment. Packaging must comply with MIL-STD 2073 standards, and all contract-related documents or modifications become official upon issuance by the government through electronic or mail channels. Distributors are required to provide proof of authorization from the original manufacturer when submitting offers. Vendors are encouraged to register with government electronic commerce systems to facilitate communication and contract management. The contract includes detailed instructions for obtaining applicable documents and maintaining confidentiality according to distribution statements defined by OPNAVINST 5510.1. The solicitation deadline is July 13, 2026, and all procurement communications are directed through the designated point of contact at DLA Mechanicsburg.
SPRMM1 DLA Mechanicsburg

POSTED

5 days ago

DEADLINE

in 27 days
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMBThis contract solicitation, issued by the Department of Defense through the NAVSUP Weapon Systems Support Mech office, pertains to the repair of CIRCUIT CARD ASSEMB components. It requires the contractor to provide firm-fixed-price quotes specifically for repair services, excluding test and evaluation-only pricing. The contractor must be an authorized repair source and comply with strict quality assurance standards, including adherence to MIL-STD packaging and government source inspection protocols. The repair turnaround time (RTAT) is set at 82 days from the physical receipt of assets, with penalties applied for delays unless excusable causes like government delays occur. The contract also mandates compliance with unique item identification (IUID) and cybersecurity maturity certification requirements, along with proper marking per MIL-STD-130. Submissions must include detailed pricing (repair unit price, total price, new unit price), RTAT commitments, capacity constraints if applicable, and supporting documentation such as CAGE codes for awarding and inspection facilities. The contract governs the inspection, testing, and acceptance of repaired items according to original manufacturer specifications and incorporates requirements related to changes in design or parts, which need prior government approval unless classified as minor part number changes. Delivery is FOB source with freight managed via Navy Commercial Asset Visibility systems. The solicitation specifies documentation acquisition protocols, including handling of classified or restricted materials, and requires offers to be submitted electronically to the designated contracting officer by the stated deadline.
Navsup Weapon Systems Support Mech

POSTED

5 days ago

DEADLINE

in 27 days
View Details
NAICS: 334412
New
Federal
CCA,DISCRETE MULTIThis contract solicitation, issued by the Defense Logistics Agency (DLA) Mechanicsburg under solicitation number SPRMM126QMG24, seeks the manufacture and delivery of the item identified as CCA, DISCRETE MULTI. The procurement is governed by a firm set of quality assurance, inspection, and packaging requirements, including compliance with MIL-STD-130 for marking and MIL-STD-2073 for packaging. The contract mandates adherence to strict inspection protocols, with the contractor responsible for ensuring all products meet contract specifications and preserving inspection records for at least one year post-delivery. Changes to design, materials, or part numbers require prior written approval from the Contracting Officer, with several code categories defined for different types of changes. The contract also specifies conditions for production facility changes, which require approval and may incur administrative fees. All contractual communications and documentation will be managed electronically through the Wide Area Workflow system, and contractors must comply with electronic invoice submission requirements. Vendors are encouraged to register in the Procurement Integrated Enterprise Environment (PIEE) and NAVSUP Weapon System Support systems for contract notifications. The solicitation follows a Lowest Price Technically Acceptable (LPTA) evaluation process. Additionally, the contractor must provide documentation verifying authorized distributor status if not the original manufacturer. The contract reference codes and applicable military and federal specifications are detailed for compliance, along with distribution statements governing the handling and dissemination of sensitive documents. The solicitation deadline for responses is July 13, 2026, with point-of-contact information provided for further inquiries.
SPRMM1 DLA Mechanicsburg

POSTED

5 days ago

DEADLINE

in 27 days
View Details