Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BOLT, MACHINE

Closed
SPE4A6-26-T-14VLFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract requires the contractor to perform first article testing on one unit of item 5306 / 12238019, with written notice to the contracting officer and quality assurance representative at least fourteen calendar days prior to shipment for final acceptance testing. The first article test report must be submitted within ninety calendar days from contract award, and the government will respond in writing within ninety days of receiving the report with approval, conditional approval, or disapproval. The contractor is responsible for covering the cost of production lot testing samples that are consumed or destroyed during government testing, and must provide fourteen days’ notice before presenting the production lot for sample selection. A single random sample will be selected from the production lot unless otherwise specified in the technical data package, with sample size subject to QAR approval. The selected production lot samples must be shipped via traceable means to the Redstone Technical Test Center at Redstone Arsenal, clearly marked and accompanied by required documentation including signed DD Forms 1222 and DD250/IRAPT, test reports, certifications, drawings, and a prepaid return shipping label. The government retains the right to keep the samples post-testing, and the contractor must ensure proprietary rights are properly marked on all submitted documents. This solicitation is a total small business set-aside under NAICS code 332722, issued by the Department of Defense, with a response deadline of August 18, 2026, and a delivery requirement of 849 days after order placement. Fast Pay is not applicable, and the contract covers five units of NSN 0001S00000061 for performance in Corpus Christi, with Priscilla Holmes as the point of contact.

General Info

Contractor performs first article testing on NSN 0001S00000061 units, submits reports within 90 days, ships samples to Redstone Arsenal with documentation.

NAICS

332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing

Place of Performance

DDCT-S 540 FIRST STREET SE, CORPUS CHRISTI, TX, 78419-5255, USA

Set-Aside

SBA

Documents

1

RFQ SPE4A6-26-T-14VL Request for Quotations DLA Aviation Aug 11 2026

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → ASC COMMODITIES DIVISION
Contacts1 person available
OfficeUSA
Office AddressUSA
Contacts

Full Description

Show more
OF THE SOLICITATION, SELECT
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 5306 / 12238019 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 90 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 90 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or
SPE4A6-26-T-14VL
SECTION A
applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE W31P0W REDSTONE ARSENAL REDSTONE TECHNICAL TEST CENTER ATTN: CHARLES EAKES BLDG 4500
REDSTONE ARSENAL AL 35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 5306-01-223-8019 Quantity: 5 EA Purchase Request: 7017571810QTY: 61 Delivery: 849 days ADO

More opportunities from Department Of Defense → ASC COMMODITIES DIVISION

Same awarding agency

NAICS: 332722
New
DIBBS
WASHER, LOCK
Solicitation # SPE4A6-26-T-40D5
Solicitation SPE4A6-26-T-40D5 is a fixed-price procurement issued by the Defense Logistics Agency for 91 internal and external tooth lock washers, identified by NSN 5310012533723. The required components must be manufactured from Stainless Steel CRES 302 and adhere to technical specifications FF-W-100 Type 3 Style 1 and FF-W-100C(1). Dimensional requirements are governed by MS 45904-86 or ASME B18.21.1, with specific tolerances for the inner diameter (.512 to .530 inches), outer diameter (1.380 to 1.410 inches), and thickness (.052 to .060 inches). The items are to be delivered to the DLA Distribution DDSP New Cumberland facility in Pennsylvania by November 27, 2026, with a delivery window of 202 days after order. Quality assurance and inspection will occur at the point of origin, requiring compliance with MIL-STD-1916, ASQ H1331, or MIL-STD-105/ASQ Z1.4, with a zero-nonconformance acceptance policy. Packaging must follow RP001 and ASTM D3951, while marking and labeling must comply with MIL-STD-129 and MIL-STD-130N. Item Unique Identification is not required. The contract incorporates various FAR and DFARS clauses, including the Buy American Act and safeguarding requirements for covered defense information under NIST SP 800-171. Payment processing is mandated through the Wide Area Workflow system. This is not a small business set-aside, and it falls under NAICS code 332722.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

4 days ago

DEADLINE

in about 13 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS