Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Arizona was posted on June 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PROFESSIONAL ENGINEERING SERVICES: Lake Mary Raw Water Pipeline Design Project

Closed
2025-11State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 13 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements
Solicitation # BPM059336
The Town of Port Deposit, in coordination with WILMAPCO, is seeking a multidisciplinary planning and engineering consultant to implement an integrated safety and mobility project for the Susquehanna River Road corridor. The scope of work focuses on establishing a context-sensitive safety strategy using the Safe System Approach, determining safe multi-modal access to the planned Hopkins Quarry Park, and evaluating the feasibility and preliminary design of a shared-use path between Granite Avenue and Octoraro Park. The project aims to produce an actionable 30 percent design and basis-of-design package by June 30, 2027, with the potential for future progression to final Plans, Specifications, and Estimates. This is a qualifications-based selection process where the contract will be awarded to the most qualified firm based on equal weighting of their proposed team and key staff, project approach, and related experience in rural corridor safety and riverfront access. Compensation and detailed scope will be negotiated after the selection of the highest-ranked firm; therefore, no fee or price information should be included in the technical proposal. The project is initially funded by the Wilmington Area Planning Council and the Maryland Department of Transportation Kimberly Lamphier Bikeways Grant Program. Selected consultants must provide proof of financial capacity, a bid affidavit, and professional liability insurance of at least 1,000,000 dollars per occurrence, while adhering to federal civil rights and non-discrimination provisions.
Town of Port Deposit

POSTED

about 14 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Flagstaff is soliciting Statements of Qualifications from Arizona licensed professional engineering firms for the Lake Mary Raw Water Pipeline Design Project. The selected firm will be responsible for providing complete engineering design services for a new raw water pipeline and accompanying electrical conduit and pull boxes extending from the Lake Mary Raw Water Pump Station to the Lake Mary Water Treatment Plant. Deliverables include the preparation of design plans, specifications, special provisions, bid schedules, engineers estimates, and all required procurement documentation. Throughout the project lifecycle, the firm will collaborate with the City and a selected Construction Manager At-Risk to ensure the successful execution of the improvements as a Capital Improvement project. Interested parties must submit their qualifications by the deadline of July 8, 2025. This solicitation is managed by the City of Flagstaff under solicitation number 2025-11.

General Info

Flagstaff seeks engineering firms for Lake Mary raw water pipeline design by July 8.

Place of Performance

AZ, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyArizona → City of Flagstaff
Contacts1 person available
OfficeN/A
Organization / AgencyArizona → City of Flagstaff
Office AddressN/A

Full Description

Show more
The City of Flagstaff (Owner) is seeking Statements of Qualifications (SOQs) from Arizona licensed Professionals (Firm) to provide professional engineering services (Project), including:1. Provide complete engineering design services for a new Lake Mary Raw Water Pipeline and electrical conduit for the entire length of the pipeline. The design will consist of a new waterline and electrical conduit/pull boxes from the Lake Mary Raw Water Pump Station to the Lake Mary Water Treatment Plant.2. Prepare design plans, specifications, special provisions, bid schedule, engineers estimate, and all necessary procurement documents associated with the project. 3. Work with the Owner and the selected Construction Manager At-Risk (CMAR) Contractor during the design and construction of the selected improvements as a Capital Improvement project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS