This Sources Sought opportunity from Department Of Defense was posted on May 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Program Depot Management (PDM)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Program Depot Maintenance (PDM) of six Royal Saudi Air Force F-15SA fighter jets, requiring comprehensive depot-level inspections, maintenance, and restoration to original configuration in accordance with the F-15SA PDM Work Specification. The contractor will perform nondestructive inspections on and off the aircraft, reinstall approved components, install and maintain Government Furnished Property including calibration and serviceability records, and ensure full compliance with U.S. Air Force Technical Orders, Country Specific Technical Orders, and international standards such as ASTM E1444, SAE-AMS-2647A, and NAS 410. Work will be conducted primarily at a contractor facility in Saudi Arabia, with pre-induction inspections occurring at RSAF operating bases and final acceptance occurring after successful Functional Check Flights. The performance schedule requires completion of 15 aircraft within nine months from the induction of the first aircraft, with a flow rate of 117 Flow-Days per aircraft. Quality standards are strict, mandating zero Category I Major findings, no more than one Category II Major finding, and no more than five Category I Minor findings in post-maintenance inspections, with monthly quality performance exceeding 97.5%. Quality management system compliance is required at 100%, and Corrective Action Requests are financially weighted as performance penalties. All work must adhere to preservation standards referenced in MIL-C-11796C, MIL-PRF-81733D, and MIL-C-6529C, with all removed parts tracked and documented via metal tags bearing part identification and aircraft serial number. Contractor personnel must hold both U.S. Secret and Saudi Secret security clearances, with access to classified data and facilities governed by DD Form 254 and RSAF Security Regulations; all classified material must be stored in approved GSA vault-type containers. Access to U.S. government information systems requires at least a NACI background check. The contractor is responsible for all customs duties, VAT, and logistics to deliver aircraft to and from RSAF home stations. Payment is exclusively through the Wide Area Workflow (WAWF) system, with obligations tracked by Accounting Classification Reference Number and Contract Line Item Number using the Funds and Man-Hours Expenditure Report. The solicitation is currently open, with responses due by May 20, 2026, and the formal contract award is anticipated between the fourth quarter of 2027 and the second
General Info
Agency
NAICS
Place of Performance
GA, SAUSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The purpose of this effort is to perform scheduled Program Depot Maintenance (PDM) and related inspections as per “Work Specification (WS) for The Royal Saudi Air Force (RSAF) F-15SA PDM Model, hereinafter referred to as F-15SA PDM WS, for F-15SA conversion jets with tail numbers.
The draft Performance Work Statement (PWS) (attached) describes the services required to conduct F-15SA Program Depot Maintenance (PDM) for the Royal Saudi Airforce (RSAF). These services include the tasking for the contractor to inspect provided aircraft as per the F[1]15SA PDM WS. The services to accomplish these work specifications include but are not limited to 1) Perform nondestructive inspections of assets both on and off the aircraft, 2) install assets that pass the inspections back onto the aircraft , 3) install Government Furnished Property (GFP), 4) maintain GFP calibration dates and, 5) maintain GFP serviceability.
Please be advised that the formal solicitation for this project is currently estimated to be let between the 4th Quarter of 2027 and the 2nd Quarter of 2028. This timeline is subject to change based on project requirements.
Please provide the following with your reponse:
- Submit Rough Order of Magnitude (ROM)
- Review and advisement of PWS scope concerns
- Review and advisement of additional Special/Common Tooling and Support Equipment in Attachment 3
- Provide details for existing infrastructure in the Kingdome of Saudi Arabia that the work is anticipated to be accomplished at.
More opportunities from Department Of Defense → FA8575 Aflcmc Waqka
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
