Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on March 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Program Executive Office Command Control Communications-Tactical (PEO C3T) Project Manager Mission Command (PM MC) Fires Support Command and Control (FSC2)

Closed
W15P7T24R0008(2)Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541511
New
SLED
RFP828 - Interactive Web Mapping and Dashboard Application Development
Solicitation # PE-29016-NONST-2027-000000075
The Atlanta Regional Commission (ARC) is soliciting proposals for the development and hosting of three interactive web mapping and analysis dashboard applications for the Atlanta Region, including a specific Housing Dashboard utilizing Census ACS, HUD, and ARC housing permit data. The contract is anticipated to be awarded in December 2026, with services commencing immediately upon execution. Evaluation of proposals will be based on technical specifications (50%), related experience and qualifications (30%), delivery schedule and methodology (10%), and the proposed budget (10%). Interested parties must complete site registration and application approval on the ARC procurement portal prior to submitting a proposal. All submissions must be combined into a single electronic file in PDF or Word format and received by November 6, 2026, at 4:00 P.M. EST. Required documentation includes a written proposal not exceeding 10 pages, a detailed budget following Exhibit B, and the Contractor Affidavit and Information in Exhibit C. Awardees must comply with Georgia state laws regarding insurance and the Georgia Security and Immigration Compliance Act, as well as federal Title VI and Equal Employment Opportunity standards. The contract includes a fifteen-day notice period for termination for convenience and requires the consultant to correct any work errors at their own expense.
Atlanta Regional Commission

POSTED

about 7 hours ago

DEADLINE

in 17 days

General Info

NAICS

541511 - Custom Computer Programming Services

Place of Performance

Aberdeen Proving Ground, MD, 21005, USA

Set-Aside

NONE

Documents

3

Fires C2 Systems Statement of Objectives (SOO)

DOCX, High priority: read this first2 pages · sow
High

FSC2 Combined High-level Architecture

PDF, High priority: read this firstspecifications
High

FSC2 IDIQ RFI 2 Questions and Responses

XLSX, Low priority9 pages · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QK Acc-Apg
Contacts2 people available
OfficeABERDEEN PROVING GROU, MD, 21005-1846, USA
Office AddressABERDEEN PROVING GROU, MD, 21005-1846, USA
Contacts

Full Description

Show more
I. DISCLAIMER Requested Information This is a Request for Information (RFI) only and considered a follow up to Fires C2 RFI #1, 1 NOV 2023 (W15P7T24R0008). Program Executive Office Command, Control, Communications-Tactical (PEO C3T), Project Manager Mission Command (PM MC) requests that all interested parties from Industry, Government Science and Technology, and Academia respond with their feedback to the Contracting Approach and updated Statement of Objective (SOO). This RFI shall not be considered an Invitation for Bid, Request for Task Execution Plan, Request for Quotation, or a Request for Proposal. There is no obligation on the part of the Government to acquire any products or services described in this RFI or its responses. Responses to this RFI will be treated only as information for the Government to consider. There is no payment for direct or indirect costs that are incurred in responding to this RFI. This request does not constitute a solicitation for proposals or the authority to enter negotiations to award a contract. No funds have been authorized, appropriated, or received for this effort. Interested parties are responsible for adequately marking proprietary, restricted or competition sensitive information contained in their response. The Government will not pay for the information submitted in response to this RFI. Responses must address the requirements outlined below. II Summary of Effort Program Executive Office Command Control Communications - Tactical (PEO C3T) and Army Contracting Command - Aberdeen Proving Ground (ACC-APG) will establish a contract vehicle for the development of the modern digital fires products needed to improve decision making and accelerate kill chains against a near-peer threat. The contract vehicle will support modernization of both the Advanced Field Artillery Tactical Data System (AFATDS) and Joint Automated Deep Operations Coordination System (JADOCS) as a Fires Safety Critical Baseline with shared common services and backend architecture. Further information on the contracting approach is provided in attachment 1. A. Fires Safety Critical Baseline (FSCB) The government has determined the AFATDS AXS and JTIC2S collective capabilities/development effort is considered a Fires Safety Critical Baseline. As such, special attention is needed for development of safety critical components and modules that extend beyond what would be required for non-safety critical baselines. Adherence to specific practices and guidelines as outlined in the Joint Software Systems Safety Engineering Handbook (JSSSEH), MIL-STD-882E, DODD 5000.01, DODI 5000.02, Defense Acquisition Guidebook and other relevant policies is expected and the past experience of interested partners with working on safety critical baselines will be investigated as part of any competitive follow on action related to this work. This FSCB capability will leverage a common back-end architecture, Open Application Programming Interface (API) and a common/intuitive role-based user interface shared by all Fire Support C2 and Mission Command Systems using Tactical Assault Kit (TAK) software. The government is in the process of selecting a common TAK baseline (i.e., TAK-X, WebTak, etc. ) that AFATDS AXS and JTIC2S will leverage and maintain as a standard. B. AFATDS AXS Current Development The Army is developing the Advanced Field Artillery Tactical Data System (AFATDS) Artillery Execution Suite (AXS) as a micro-service, open architecture, hardware agnostic, application based, Fires solution (see Attachment 02). It provides an enduring architectural approach to enable mission adaptability and upgrades. AFATDS AXS is planned to divide the current capabilities provided by the AFATDS 6.8 baseline into three sub-products at echelon (Fire Support Element, Technical Fire Direction, and Tactical Fire Direction). Current development is executed by the Development Command-Armament Center (DEVCOM-AC). DEVCOM-AC will develop the initial Fire Support applications, microservices, data models and supporting development technical artifacts for Fire Support functions at Division. It is the government's intent that these Fire Support Element capabilities and the supporting infrastructure be expanded to meet all FSE functionality of the existing AFATDS application in addition to building upon this the necessary Tactical and Technical Fire Direction capabilities needed to fully supplant the legacy AFATDS in the field today. The future effort in its entirety will be managed by the vendor library approach. The government will likely require that the work performed under this vendor library approach leverage the DEVCOM AC product as its start point to enable a compressed software (SW) deployment timeline. C. JTCI2S Current Development The Army plans to replace the legacy Joint Automated Deep Operations Coordination System (JADOCS) with a new program referred to as Joint Targeting Integrated Command and Coordination Suite (JTIC2S). JTIC2S will provide joint and organic Army fire support management for joint, coalition, and echelon target development and management via access to joint and multi-domain target intelligence databases. JTIC2S enables commanders at brigade through theatre levels throughout the Army, Air Force, Navy, Marine Corps, Special Forces and Coalition partners, to integrate targeting efforts into a single federated user interface via a joint fires/targeting common operational picture (COP). This digital integration of U.S. and allied fires will provide a capability for nominating, vetting, and validating suspect targets, determining methods of engagement, matching weapons effects to desired target battle damage, conducting targeting and risk mitigation in a coordinated and collaborative digital environment for both deliberate and dynamic targeting. JTIC2S will provide digital targeting development in coordination with the Intelligence warfighting function and Mission Command Warfighting function enabling access across multiple means of transport. It will also have capability to process a high volume of fires in a contested Large Scale Combat Operations (LSCO) environment, similar to how United States Forces Korea (USFK) support Republic of Korea (ROK) forces in the counter-fire fight today. Current development is carried out by the Development Command- Command, Control, Communication, Computers, Cyber, Intelligence, Surveillance and Reconnaissance Center (DEVCOM-C5ISR). DEVCOM-C5ISR will decompose and containerize current JADOCS capabilities and develop the initial backend services and user applications for the Minimum Viable Product (MVP) for JTIC2S (see Attachment 03). It is the government's intent that further refinement of the foundation, development, and integration of future requirements will be managed in the vendor library approach. The government will likely require leveraging this MVP as a starting point to enable a compressed SW deployment timeline. D. Common Fires Framework Today AFATDS and JADOCS exist as two separate and distinct C2 systems. At different points throughout the history of these programs, the concept of combining them as a single application was considered. However, it was ultimately abandoned given the extensive re-work that would have been necessary and the impact on delivering capabilities to support the conflicts of the 2000s and 2010s. With both AFATDS and JADOCS modernizing at the same time, a unique opportunity presents itself that has caused the Army to re-look the topic of system consolidation. Instead of building AXS and JTIC2S as two disparate systems with their own technical architectures, the decision has been made to build these capabilities using a shared TAK environment and foundational services. This approach enables maximum re-use of common functionality needed by both, AXS and JTIC2S, while still enabling unique functionality that pertains only to targeting or fires planning and execution to be built. Role based access control will be leveraged to ensure that JTICS2 and AXS users are presented with a customized interface to the functions needed to perform their mission. PM MC is acting as the facilitator between the DEVCOM AC and C5ISR Center teams. PM MC will foster the environment to enable both teams to co-exists and work together. Both teams will build the common framework and unique applications, for both AXS and JTI2S, to provide the initial operational capabilities to their respective user community as outlined in Section B and C above. III. MODERNIZING COMPLEX PROGRAMS a. Past Government experience indicates that a single vendor model is not appropriate for the complex nature of this work. For this effort, the government will leverage a vendor library model to ensure a - best of breed environment is available for optimally addressing the unique challenges of this task. b. It is the intent of the government to develop a contracting solution that can enable the establishment of a vendor library organization. The government would require this organization to deliver products such as software, charter, Plan of Actionand Milestone (POAM), processes, and leadership roles for contractors. c. The government intends that this organization leverage, inherit, and continue the current development efforts and open APIs of AFATDS AXS & JTIC2S MVP capabilities at the time of transition. IV REQUEST FOR INFORMATION A. A white paper providing: a. Comments, concerns, constructive inputs, and trade space on data rights for any software developed or leveraged as part of the system(s) design and implementation. b. Comments, concerns, and constructive inputs regarding development and implementation of Open Application Programming Interface (API). c. Comments, concerns, and constructive inputs on the mechanics and optimization of Lead System Integrator (LSI) or CI/CD Lead Vendor selection: i. Role (e.g, technical leadership only vice both LSI and developer roles) ii. Duration (range from short term 6-9 months to 1/multiple years). d. Comments, concerns, and constructive inputs on concurrent IDIQ award w/1st Task order or in serial (IDIQ award followed by 1st task order later). V. SUBMISSION INSTRUCTIONS A. COVER SHEET to include the following company information not to exceed 1 page. Company Name, CAGE Number (if applicable), Address, Point of Contact E-Mail Address, Phone, Company Web Page URL. State whether your company is a small business such as 8(a), small, disadvantaged business, woman-owned business, HUBZone small business, Veteran-owned business, or service disabled veteran owned business. Also include a statement as to whether your company is domestically or foreign owned (if foreign, please indicate the country of ownership). B. RESPONSES TO QUESTIONS. The Government is requesting interested sources to submit a white paper which provides comments, concerns, and constructive inputs as requested in Section IV. White paper shall be arial font, size 12, and not to exceed 5 pages (title page/acronym lists are not included in this page count). Since White Papers will be shared outside the Government with multiple supporting contractor organizations, submissions should confirm there is no issue with the release of any proprietary documentation provided. C. Questions or requests for clarification shall be submitted via email by 1700 EST on 29 February 2024 to the points of contact listed in section named "Points of Contact" with the email subject line - Fires C2 Systems RFI #2 Questions. All responses shall be submitted to same points of contact by 1700 EST on 15 March 2024 with the email subject line Fires C2 Systems RFI #2 Response. RFI Feedback After the Government reviews all vendor submissions there may be additional need for further follow-on questions. If so, the Government reserves the right to contact those vendors and ask for clarifications. Points of Contact: Ryan Reddy, PM MC Acquisition Specialist, ryan.k.reddy.civ@army.mil Crystal Ross, Contract Specialists, crystal.l.ross17.civ@army.mil Jon Bauman, Contracting Officer, jonathan.m.bauman2.civ@army.mil Attachments: Attachment 01 - Updated Statement of Objectives Attachment 02 - FSC2 Combined (AFATDS AXS and JTIC2S) High-level Architecture Attachment 03 - Fires C2 RFI #1, 1 NOV 2023 (W15P7T24R0008) Attachment 04 - FSC2 IDIQ RFI2_Question Responses

More opportunities from Department Of Defense → W6QK Acc-Apg

Same awarding agency

NAICS: 541519
New
Federal
Cyber Security Engineering and Risk Management Framework Support
Solicitation # W91CRB-26-B-A006
Solicitation W91CRB-26-B-A006 is a firm-fixed-price contract opportunity issued by the Army Contracting Command - Aberdeen Proving Ground for Cybersecurity Engineering and DoD Risk Management Framework (RMF) Support Services. The contractor will provide all necessary personnel, equipment, and non-personal services to establish and maintain Authority to Operate (ATO) and RMF compliance for the Aberdeen Test Center (ATC) Local Area Network, Logically Isolated Network, Secure Test Environment, and Test and Evaluation Network. The total period of performance runs from November 23, 2026, to November 22, 2031, consisting of a base year and four 12-month option years. This procurement is set aside for small businesses, with a specific preference for HUBZone small business concerns. Award will be made to the lowest-priced, responsive, and responsible bidder based on a Total Evaluated Price calculation. Key personnel requirements include an IT Systems Solutions Architect-Sr with CISSP certification and 10 years of RMF experience, as well as other IT professionals with CASP+ or equivalent certifications. Security requirements are stringent, requiring a Secret Facility Security Clearance at the time of bid submission, with specific personnel requiring Secret and Top Secret clearances to support various classification environments and ICD 503 requirements.
Other Computer Related Services

POSTED

about 12 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541611
New
Federal
FY27 Mentor Protege Program (MPP) Broad Agency Announcement
Solicitation # MPP-FY2027
The Department of War Mentor-Protégé Program (MPP) is a business development initiative designed to strengthen the Defense Industrial Base by pairing large prime contractors with eligible small businesses. Mentors must be prime contractors with at least 25 million dollars in Department of War contracts from the previous fiscal year and an active subcontracting plan. Eligible protégés include small businesses meeting SBA size standards and specific socio-economic categories, such as HUBZone, Women-Owned, or Service-Disabled Veteran-Owned firms. The program focuses on technical priorities including IT infrastructure modernization, cloud optimization, data integration, AI/ML implementation, and cybersecurity. The application process is a two-phase submission. Phase one requires a white paper summarizing technical and cost information, which are reviewed on a quarterly rolling basis. Selected applicants proceed to phase two to submit a final proposal, including a statement of work and cost proposal. Agreements are limited to reimbursable contracts with a maximum period of performance of 36 months. Additionally, the Protégé Pilot Initiative allows protégés to propose specific engineering or software projects for up to 25 percent of the annual agreement budget. All participants must maintain active registration in SAM.gov.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 9 months
View Details
NAICS: 541715
New
Federal
Request for Information – Prophylactic Platform for Medical Countermeasures
Solicitation # W911SR27SPPFC
The Department of Defense, through the Portfolio Management Executive for Chemical, Biological, Radiological and Nuclear Defense (PME CBRND) and the Accelerated Defense Pharmaceuticals (ADP) program, is issuing a Request for Information (RFI) under solicitation W911SR27SPPFC. The objective is to identify capable companies that can advance the development of prophylactic medical countermeasures (MCMs) using existing platform technologies. The program focuses on progressing these countermeasures through Phase I or Phase II clinical trials, with a goal of enabling interim fielding via Expanded Access Protocols or pre-Emergency Use Authorization. The anticipated period of performance is up to four years, with work primarily conducted at the contractor's facilities. Interested respondents must provide a comprehensive capability description, including technical approach, regulatory status with the FDA, cGMP manufacturing capabilities, and a development roadmap with rough order of magnitude cost estimates. Evaluation criteria for future selections will emphasize manufacturing process capability, product safety and efficacy, past FDA experience, and the plug-and-play nature of the platform across various pathogens. Submissions must be delivered as a single searchable PDF, featuring a specific cover page and a core capability description not exceeding four pages. All non-clinical and clinical data must be SEND and CDISC compliant, and manufacturing must adhere to cGMP standards to support an Investigational New Drug application through a Biologics License Application.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 541512
New
Federal
Sizing Technology Pilot
Solicitation # HQDA-G-4_26_01
The Army Contracting Command-Aberdeen Proving Ground, acting for the Headquarters Department of the Army G-4, is seeking innovative commercial solutions for a Sizing Technology Pilot. The objective is to replace manual tape measurements with automated, non-contact methods such as body and foot scanning, computer vision, and AI-driven extraction to accurately determine standard Army uniform and footwear sizes. This initiative targets four primary pipelines: Initial Entry Training Soldiers at MEPS, West Point Cadets, Senior ROTC Cadets at civilian institutions, and in-service Soldiers preparing for deployment. The goal is to eliminate logistical bottlenecks and reduce high return rates of clothing and boots. Issued under the Defense Commercial Solutions Opening authority, this solicitation may result in FAR contracts, non-FAR agreements, or Other Transactions, with the government anticipating up to three small pilot contracts. Interested offerors must submit a Phase 1 Solution Brief by October 20, 2026, which will be evaluated based on technical merit, project schedule, and commercial viability. Key requirements include the ability to integrate with Army Vantage / ISM, strict compliance with Section 508 accessibility standards, and adherence to the Privacy Act. Additionally, the government requires 100 percent ownership of all captured measurement and sizing data. Eligible respondents must possess a Unique Entity ID and active SAM registration.
Computer Systems Design Services

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS