Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Progressive Design-Build Independent Cost Estimator Services for the Kane Spring Project

Open
10219992State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Water Resources Division of Engineering is seeking qualified firms to provide independent cost estimating services for the Kane Spring Habitat Restoration Project. Utilizing a Progressive Design-Build delivery model, the selected contractor will support the department by reviewing cost estimates, construction schedules, risk assessments, and Guaranteed Maximum Price proposals from the design and preconstruction phases through the final construction amendments. Key deliverables include detailed independent cost estimates at established design milestones, covering both direct costs such as labor and materials, and indirect costs including project management and insurance. The estimated contract term runs from Spring 2027 through December 31, 2030, with a projected contract value between 1,000,000.00 and 10,000,000.00 dollars. This is a qualifications-based selection process where the most qualified firm is chosen based on experience with collaborative delivery methods, owner-representative estimating, and proficiency with estimating and scheduling software. Rate and cost negotiations occur only after the top firm is selected. Applicants must submit a Statement of Qualification by November 19, 2026, and must include at least one key staff member licensed as a California Architect, Professional Engineer, or General Contractor. To prevent conflicts of interest, the selected independent cost estimator is prohibited from participating in any other portion of the Kane Spring Habitat Restoration Project. Additional requirements include mandatory disclosures regarding the use of Generative AI and compliance with various state and federal non-discrimination and safety standards.

General Info

Independent cost estimating services for Kane Spring Habitat Restoration Project, 2027 through 2030.

Place of Performance

West Sacramento, CA, 95605, USA

Set-Aside

NONE

Documents

5
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this first29 pages · amendment
High
DOCX, High priority: read this first5 pages · amendment
High
PDF, High priority: read this first68 pages · rfq
High
PDF, Low priority2 pages · special-notice
Low

Read all 5 documents

Due in 3 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 3 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 5 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Water Resources
Contacts1 person available
OfficeN/A

Full Description

Show more
State of California Progressive Design-Build Independent Cost Estimator Services for the Kane Spring Project Tender # 10219992 Closing Date : 11/19/2026 at 14:00 PM Originating Department: State of California Contact: Contact: Marissa Sharp Phone: 916/642-2887 Email: Sign up to see this detail Details: The Department of Water Resources (DWR), Division of Engineering (DOE) invites qualified firms to submit a Statement of Qualification (SOQ). The services to be provided will be independent cost estimating services to support DWR in delivering the Kane Spring Habitat Restoration Project (Project) using the Progressive Design-Build Project model. Firms will assist DWR in reviewing cost estimates, schedules, risk assessments, and guaranteed maximum price (GMP) proposals for the design and preconstruction phase of the project through the final construction amendment(s). The specific work and deliverables are identified in Exhibit A, Description of Services, and will support the DOEs, Project Delivery Branch. Contract Amount: $1,000,000.00 to $10,000,000.00 Disclaimer: This bid is researched and provided for information purposes only. To participate in this bid opportunity, interested vendors are sometimes required to register on the State of California's website. Please refer to the originating organization for any information relating to this. Direct all queries pertaining to the language, the content or any missing or inaccurate information within this abstract to its originator, as indicated in the advertisement. Note: When you click on the link below, a new window will open to the site where you can locate more information regarding this bid. You may need to search the site to locate the bid. View Bid Information Biddingo.com is not responsible for the contents of the third party site and does not make any representations regarding the content or accuracy of materials on such third party web sites. If you decide to access them, you do so at your own risk.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Design Services For Water Well No. 30 Rehabilitation
Solicitation # UH26004
The City of Stockton is soliciting professional engineering services for the Water Well No. 30 Rehabilitation Project located in Lodi, California. The primary objective of this project is to ensure that water quality meets all Title 22 drinking water quality standards while maintaining a well capacity of approximately 2,000 gallons per minute. The scope of work includes the development of a Preliminary Design Report that identifies treatment options for 1,2,3-TCP and provides a 10-year capital and O&M cost analysis, the creation of full construction documents, the preparation of water system permit amendment applications, and the provision of engineering support during the bidding process. Proposals are due by December 3, 2026, and must be submitted to the Office of the City Clerk in Stockton. The submission must include one original with wet ink signatures, three copies, and a USB containing an electronic version, with the fee proposal submitted in a separate sealed envelope and a passcode-protected file on the USB. The City will use a ranking process to select the most qualified consultant, evaluating proposals based on technical merit before reviewing cost proposals. Selected contractors must comply with prevailing wage requirements, ADA standards, and non-discrimination laws, and must provide a Certification of Financial Condition to ensure financial soundness and tax compliance. Payment for services is processed within 30 days of receiving an approved invoice.
City of Stockton

POSTED

about 3 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
Thornton Road And Don Avenue Sewer Pump Stations Rehabilitation
Solicitation # UW13009
The City of Stockton Municipal Utilities Department is soliciting design services for the rehabilitation of the Thornton Road and Don Avenue Sewer Pump Stations. The project aims to improve system reliability and minimize failures by updating outdated electrical and mechanical systems and addressing operational concerns. The scope of work includes performing investigations, hydraulic, mechanical, and electrical evaluations, and developing comprehensive rehabilitation recommendations. Key tasks are divided into project management, existing conditions investigation and preliminary engineering, and the creation of design and bid documents. Award selection is based on the firm best qualified for the project, with specific scoring preferences granted to local businesses: 5% for City of Stockton businesses, 2% for San Joaquin County businesses, and 1% for subconsultants within the city. Proposals must adhere to strict formatting guidelines, including a 40-page total limit and a 30-page limit for the body, with a minimum 10-point font. Technical proposals must be submitted on white paper with wet ink signatures, while proposal fees and the list of tasks must be submitted in a separate sealed envelope. Contract administration requires that invoices include a description of work, time spent, and a City reference number, with payments processed within 30 days of receipt subject to City Council appropriations. The contractor is responsible for maintaining safety, implementing dust control, and preparing a Stormwater Pollution Prevention Plan to comply with state and local regulations. Additionally, the successful proponent must provide a certification of financial condition and adhere to prevailing wage and non-discrimination requirements.
City of Stockton

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541330
New
SLED
5671 Medical Center La Jolla (MCLJ) Outpatient Pavillion Geotechnical Testing And Inspection Services
Solicitation # 20261113029
The University of California San Diego is soliciting a Geotechnical Testing and Inspection Services firm for the 5671 Medical Center La Jolla Outpatient Pavilion. This project involves the construction of an approximately 180,000 gross square foot HCAi/OSHPD 3 compliant facility designed to LEED Gold standards. The selected firm will be responsible for geotechnical testing and inspection across various construction phases, including earthwork, shoring, foundations, flatwork, utility installation, and site work. Key deliverables include the review of construction documentation for site excavation and grading, as well as verifying that all earthwork and backfill align with approved drawings and geotechnical recommendations. Design review services may begin as early as December 2026, with the project breaking ground in January 2027 and reaching completion by September 2029. Selection is based on proven capabilities, staff qualifications, and a requirement that the firm and its testing lab be located within 30 miles of the project site. Applicants must submit a proposal limited to 25 pages, including a letter of interest, a response to selection criteria, and a fee estimate based on current prevailing wage criteria and a 40-hour work week. The University will only contract with a single executive design professional entity, excluding joint ventures or associations. All services will be governed by the standard University Professional Services Agreement, and shortlisted firms must sign a Statement of Understanding regarding these terms. Proposals are due by November 18, 2026, and the selection process includes a mandatory interview.
University of California San Diego

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 541330
New
International
Transportation and Economic Corridors - Request for Proposal - CON0026574 - GRADE WIDENING & INTERSECTION IMPROVEMENTS
Solicitation # CON0026574
Alberta Transportation and Economic Corridors has issued Request for Proposal CON0026574 for engineering consultant services to perform grade widening and intersection improvements at the Stoney Trail and 52 Street SE interchange. The scope of work is divided into two primary locations: the design of a lane addition on the eastbound Highway 201 exit lane to eliminate bottlenecks and the implementation of a dual signalized right turn on northbound 52 Street SE to reduce peak queues. The comprehensive project lifecycle includes preliminary engineering, detailed design, contract tendering, administration, construction supervision, and warranty inspection, with a required completion date of October 31, 2028. Key technical deliverables include geotechnical investigations, pavement structure design, relocation of roadway lighting, and a Traffic Accommodation Strategy for high-volume urban freeway construction. This solicitation is restricted to a short-list of prequalified consultants, including Eagle Engineering Corp., Hatch Ltd., and Stantec Consulting Limited. Selection is based on a value-based process weighing qualifications (80 points) and fee proposals (100 points), with the final award determined by the best overall value rather than the lowest cost. The successful proponent must enter into a Lump Sum and Hourly Rate Contract and must possess a valid Certificate of Recognition (COR), Temporary Letter of Certification (TLC), or COR Equivalency Letter (COREL). Proposals must be submitted via the APC E-submissions platform by December 14, 2026, as two separate PDF files under 10MB each, consisting of a qualification submission and a fee proposal.
Transportation and Economic Corridors

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 541330
New
SLED
RFQ-RFP INFLOW AND INFILTRATION ENGINEERING SERVICES FOR WATER & SEWER
Solicitation # 26/27-19
The Town of Manchester Water and Sewer Department is seeking professional engineering services to conduct a comprehensive Inflow and Infiltration (I&I) investigation and Sanitary Sewer Evaluation Survey (SSES) for its sanitary sewer collection system. The project aims to address aging infrastructure and excessive wet-weather flows that increase the risk of sanitary sewer overflows and basement backups. The selected firm will be responsible for analyzing existing system data, performing field investigations—including smoke testing, dye testing, and CCTV inspections—and quantifying wet-weather peaking factors. The ultimate goal is to produce a prioritized, GIS-integrated rehabilitation roadmap that distinguishes between public-side defects and private-side contributions to ensure long-term regulatory compliance with Connecticut DEEP NPDES requirements. Proposals must be submitted electronically via the Town of Manchester OpenGov portal by December 3, 2026. The award will be based on the best suited and most advantageous proposal, with cost being only one of several evaluation factors. Required documentation includes a separate proposal, a completed IRS Form W-9, a SAM.GOV registration number, and a Living Wage Certification. Contractors must maintain professional liability and cyber risk insurance of at least $1,000,000 and adhere to the Manchester Living Wage Ordinance if the contract value exceeds $25,000 in a fiscal year.
Water and Sewer

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
RFQ# RS-27-05 Construction Engineering and Inspection Services for Orange Drive (SW 92 Avenue to SW 67 Avenue)
Solicitation # RFQ# RS-27-05
The Town of Davie is soliciting qualifications for Construction Engineering and Inspection (CEI) services for the Orange Drive Sidewalk Improvement Project, spanning from SW 92 Avenue to SW 67 Avenue. This CCNA solicitation seeks a consultant to provide a lump sum not to exceed cost, with an estimated budget of $178,972. The selected firm will be responsible for daily field observations averaging 20 hours per week, managing bi-weekly progress meetings, processing RFIs and plan revisions, and performing quality control inspections. The total period of performance is 300 days, designed to coincide with the construction phase and include 30 days for the closeout of Local Agency Program (LAP) requirements. Qualified proposers must be FDOT prequalified for CEI services and demonstrate specific FDOT/LAP experience through the resumes of their key personnel. The evaluation process is based on the best interest of the Town, with a significant weight placed on experience and technical capabilities, including the firm's ability to meet time and budget constraints. Submissions must be made electronically via the OpenGov e-Procurement Portal and include a letter of interest, project team forms, an organizational chart, and references from similar projects completed within the tri-county area. The contract is subject to stringent federal and state regulations, including the Build America Buy America Act, Davis-Bacon and Related Act provisions, and FHWA-1273 requirements for federal-aid construction. Compliance with EEO standards, OSHA safety regulations, and non-discrimination policies is mandatory. Additionally, the consultant must adhere to a Cone of Silence during the solicitation process and provide necessary certifications regarding their business operations and tax status. Payment is processed via purchasing card or purchase order, with a standard payment term of net 45 days per Florida State Statutes.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 15 days
View Details

More opportunities from California Department of Water Resources

Same awarding agency

NAICS: 532412
New
SLED
Bare Crane Rental Services - IFB 10223229
Solicitation # 10223229
The California Department of Water Resources, Oroville Field Division, is soliciting bids for bare crane rental services to be provided on an as-needed basis within the division's jurisdictional boundaries in Oroville, California. The scope includes the rental of various hydraulic cranes, ranging from 15-ton to 35-ton capacities, including boom trucks and rough terrain models. To qualify, contractors must maintain an equipment facility within a 100-mile radius of the Oroville Operation and Maintenance Center and ensure equipment is available within 72 hours of notice, or within four hours during emergency scenarios. All equipment must comply with Air Quality Management District regulations and the California Air Resource Board, and the contractor must adhere to OSHA safety standards and California Highway Patrol safety inspection programs. The contract will be awarded to the lowest responsible bidder meeting all specifications, with specific preferences applied for California certified Small Businesses and Disabled Veteran Business Enterprises. Administrative requirements include the submission of a Payee Data Record, a GenAI disclosure, and a Key Employee Policies acknowledgment. Invoices must be submitted monthly in arrears only after receiving verbal acceptance of work from the DWR Contract Manager, with payment terms set at 45 days for undisputed invoices. The agreement is subject to a budget contingency clause and may be terminated by the State without cause upon 30 days written notice.
Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing

POSTED

4 days ago

DEADLINE

in 22 days
View Details
NAICS: 484220
New
SLED
Heavy Equipment Transport Services - Small Business
Solicitation # 10219497
The California Department of Water Resources Oroville Field Division is soliciting bids for heavy equipment transport services to be provided on an as-needed basis. This Small Business Option solicitation is restricted to California certified small businesses, with a contract value not to exceed 249,999.99 dollars and an anticipated start date of May 1, 2027, for a three-year term. The selected contractor must provide a driver and a truck with a lowbed trailer and separator capable of transporting equipment weighing up to 100,000 lbs. Responsibilities include securing all necessary Caltrans oversize and overweight permits, pilot cars, and signage, while maintaining compliance with DMV, CHP, and California Air Resource Board regulations. The contract will be awarded to the lowest responsive and responsible bidder, with a preference for disabled veteran owned small businesses in the event of a tie. Bidders must submit a comprehensive package by November 30, 2026, at 2:00 PM, including a bid sheet, firm certifications, and disclosures regarding generative AI and the Darfur Contracting Act. Mandatory requirements include maintaining specific insurance limits for general liability, automobile liability, and workers compensation, as well as providing an Injury and Illness Prevention Program and a Multiemployer Worksite Policy upon award. All proposing firms will be verified for tax delinquency through the Franchise Tax Board and the California Department of Tax and Fee Administration.
Specialized Freight (except Used Goods) Trucking, Local

POSTED

7 days ago

DEADLINE

in 14 days
View Details
NAICS: 237310
SLED
IFB 10223523 Traffic Control Services
Solicitation # 10223523
The California Department of Water Resources is soliciting professional traffic control services on an as-needed basis for the Sutter Maintenance Yard. The anticipated three-year contract, starting in February 2027, involves managing traffic on publicly accessible roadways for projects such as road surface repair, brush clearing, and drainage work. These projects typically range from 500 to 1,500 feet in distance and last between one and 45 days, with the potential for 24/7 emergency response. The selected contractor must possess a valid C-31 Contractor's License, maintain DIR registration for prevailing wage compliance, and adhere to MUTCD, CJUTM, and WATCH standards. Equipment requirements include crash cushion trucks, rumble strips, and specific retro-reflective sheeting and beacon standards. The contract is awarded to the lowest responsible bidder, with a 5% calculation preference available for certified Small Businesses or Non-Small Businesses that subcontract at least 25% of the work to a California certified Small Business. Bidders must meet a minimum 3% DVBE participation goal and provide disclosures regarding Generative AI use and recycled content. Invoices are submitted monthly in arrears and paid within 45 days following written acceptance of work by the DWR Contract Manager. The state maintains the right to terminate the agreement without cause upon 30 days written notice. The total award value was established at 131,000 USD.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS