This Solicitation opportunity from Florida was posted on October 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Fort Lauderdale is soliciting bids from qualified contractors to undertake a comprehensive construction project within the Progresso Village area, bounded by Sunrise Blvd, NW 9th Ave, Progresso Dr, and Broward Blvd. The project aims to enhance stormwater management infrastructure through removal and installation of stormwater systems, water main relocations, pipe lining using Cured In Place Pipe (CIPP) technology, pavement restoration, and the construction or renovation of pump stations. Additional scope includes landscaping and tree removal and planting, swale restoration, and the implementation of Maintenance of Traffic measures to ensure safe and efficient work zones. The contract is valued between five million and fifteen million dollars, with a deadline for bid submissions set for December 2, 2024.
This project is part of the City’s broader efforts to improve urban infrastructure and flood resilience, aligning with the NAICS code 237310, which pertains to water and sewer line and related structures construction. The contract emphasizes adherence to detailed specifications and conditions outlined in the bid invitation, with a focus on quality and compliance. The procurement process may include updates or addenda, such as the recent modification to related transportation infrastructure projects by the Florida Department of Transportation, which involves installing insulated joints on mainline rail tracks, indicating ongoing infrastructure upgrades in the region. Interested bidders can access additional details and submit their proposals through the designated online portal.
HighAI Summary for Addendum 2 Part 2 - Pump and Lightning Protection System Specifications: Addendum 2 Part 2 dated unspecified provides detailed technical specifications and requirements for pump design, accessories, source quality control, installation, and field quality control. It also includes specifications for lightning protection systems, including scope, references, administrative requirements, and quality assurance qualifications. The document outlines contractor responsibilities, coordination, and standards compliance for both pump and lightning protection system work, supplementing the original contract documents.
PDF
PDF, High priority: read this first85 pages · drawings
HighAI Summary for Drawings Part 2 - Construction and Tree Protection Details: This document contains construction drawings and details including specifications for drainage structures, reinforcement bars, and packaged air conditioning units. It includes a tree disposition plan with a chart listing tree species, conditions, and protection notes prepared with an ISA Certified Arborist. The document provides root zone protection guidelines to preserve trees during construction, notes on rebar lap lengths and spacing, and details on hooks and stirrups. The drawings are essential for construction execution and environmental protection compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Drawings Part 2 Updated - Skimmer and Tree Disposition Details: This document titled 'Drawings Part 2 Updated' includes detailed technical specifications and notes related to skimmers used in catchbasins, including materials, construction standards, and installation instructions. It also contains a tree disposition plan with a chart listing tree species, conditions, and protection notes for construction. Additionally, there is a plant schedule specifying quantities and types of trees and shrubs for landscaping. The document is intended to guide construction and environmental protection efforts, dated as the updated version of the drawings part 2.
PDF
PDF, High priority: read this firstbid-line-items
HighAI Summary for Event 401 Bid Line Items: This document titled 'Event 401 Bid Line Items' provides detailed bid line items for a construction project. It includes descriptions, units of measure, and quantities for various work components such as mobilization and demobilization, maintenance of traffic, GIS database additions, erosion control, stormwater pump station construction, vibration and noise monitoring, removal and disposal of drainage structures and pipes, and installation of catch basins. The document outlines full compensation terms for each item and references contract documents and standards. It serves as a critical part of the bidding process, specifying the scope and pricing basis for contractors.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Event 401 - Progresso Village Neighborhood Stormwater Improvement Project Bid Documents: This document is the Invitation to Bid (ITB) for Event 401, Project No. 11843, titled Progresso Village Neighborhood Stormwater Improvement Project. It includes bid information, instructions to bidders, general and special conditions, a sample construction agreement, and detailed technical specifications across multiple divisions such as General Requirements, Site Work, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Special Construction, Mechanical, Electrical, and Instrumentation. Appendices include terms and conditions, wage determination, standard grant agreement terms, and geotechnical reports. The document outlines the scope of work, submission requirements, and contract conditions for bidders.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Event 401 Stormwater Improvements Progresso Village Technical Specifications: This document is Volume 1 of 2 of the Technical Specifications for the Stormwater Improvements project at Progresso Village, issued for bid by the Public Works Department Engineering Division of Fort Lauderdale, Florida. It includes a detailed table of contents covering general requirements, site work, concrete, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, specialties, equipment, special construction, mechanical, electrical, and instrumentation divisions. The document outlines project scope, quality control, submittals, construction constraints, and various technical specifications necessary for the stormwater master plan modeling and design implementation. It also references appendices with geotechnical reports and contractor forms required for bid submission.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No. 401 Addendum 1 for Progresso Village Stormwater Improvement Project: This document is Addendum No. 1 dated 10/31/2024 for ITB No. 401 titled 'Progresso Village Neighborhood Stormwater Improvement Project'. It serves to correct Drawing Part 1 & Part 2 with updated drawings uploaded to the Infor system. The addendum confirms that all other terms, conditions, and specifications remain unchanged. The document includes project location details, notes on storm drainage schedules, utility locations, and contractor responsibilities related to the project in Fort Lauderdale, Florida.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No.401 Addendum 3 - Progresso Village Stormwater Improvement Project: Addendum No. 3 dated 11/08/2024 for ITB No. 401 regarding the Progresso Village Neighborhood Stormwater Improvement Project. This amendment announces a change from no pre-bid conference or site visit to scheduling a pre-bid conference on November 14, 2024, at 10:00 AM local time at City of Fort Lauderdale. Attendance is not mandatory but strongly suggested. The addendum emphasizes the bidder's responsibility to inspect the site and understand the project scope before bidding. All other terms, conditions, and specifications remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No. 401 Addendum 4 for Progresso Village Stormwater Project: Addendum No. 4 dated 11/12/2024 for ITB No. 401, Progresso Village Neighborhood Stormwater Improvement Project. This addendum addresses corrections to previous responses regarding bid item measurements and specifications, specifically clarifying that Item 55 is measured as Lump Sum (LS). It also notes a pending response about manhole form sizes. All other terms, conditions, and specifications remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No. 401 Addendum 8 for Progresso Village Stormwater Project: Addendum No. 8 dated 11/26/2024 for ITB No. 401 Progresso Village Neighborhood Stormwater Improvement Project. This amendment extends the bid close date to December 9, 2024, and corrects quantities for several bid items (35, 36, 37, 38, 39, 41, and 43) related to furnishing and installing various sizes of HP and RCP pipes at depths greater than 10 feet. All other terms, conditions, and specifications remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No.401 Addendum No. 7 - Progresso Village Stormwater Improvement: Addendum No. 7 dated 11/22/2024 for ITB No. 401 regarding the Progresso Village Neighborhood Stormwater Improvement Project. This amendment revises Section 01400 Part 1 General - Quality Control, specifically the requirements for Testing Laboratory Services. It clarifies that laboratory testing, checking, and certifications, including transportation costs of samples, are the contractor's responsibility. Testing requirements are subsidiary to payment line items under Section 01025 - Measurement and Payment. Additional testing requested by the City or Engineer is covered under a specific allowance item. The addendum maintains all other terms and conditions unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No. 401 Progresso Village Neighborhood Stormwater Improvement Project Addendum 2: This document is Addendum No. 2 dated 11/8/2024 for ITB No. 401, Progresso Village Neighborhood Stormwater Improvement Project. It includes corrections to drawings (replaced pages SD-DR-03 and EY-SH-01), revisions to specifications such as the cover page, table of contents, addition of Cured in Place Pipe Lining specification, changes to measurements and payment sections, and added geotechnical reports and construction constraints. It also modifies line item #97 quantity from 10 to 1 and revises contract time requirements, reducing final completion from 630 to 600 calendar days. The addendum replaces the EPA WIFIA Program Borrowers Guide to Federal Requirements and confirms all other terms remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No.401 Progresso Village Neighborhood Stormwater Improvement Project Addendum 5: Addendum No.5 dated 11/18/2024 for ITB No.401 Progresso Village Neighborhood Stormwater Improvement Project. This document provides responses to bidder questions including clarification on manhole form angles and anticipated construction start date, updated to late February 2025. It also addresses Disadvantage Business Goal requirements referencing the solicitation document and related civil rights sections. All other terms, conditions, and specifications remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ITB No. 401 Progresso Village Stormwater Improvement Project Addendum 6: Addendum No. 6 dated 11/21/2024 for ITB No. 401 regarding the Progresso Village Neighborhood Stormwater Improvement Project. This addendum addresses a question about the location of the new Pump Station shown on plan sheet CU-ST-24, clarifying concerns about new apartments at the proposed site. All other terms, conditions, and specifications remain unchanged.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for P11843 Stormwater Improvements Progresso Village Drawings Part 1: This document contains the drawings for the City of Fort Lauderdale project P11843, titled Stormwater Improvements Progresso Village. Issued for bid in October 2024, it includes detailed sheets such as title, location, general notes, aerial maps, contaminated sites, proposed site plans, storm drainage plans and profiles, paving and grading plans, civil details, landscape plans, structural details, architectural plans, and mechanical process plans. The drawings provide comprehensive technical and design information necessary for the construction and improvement of stormwater infrastructure in Progresso Village, Fort Lauderdale, Florida.
PDF
PDF, High priority: read this firstdrawings
HighAI Summary for P11843 Stormwater Improvements Progresso Village Drawings Part 1: This document contains the drawings for the City of Fort Lauderdale project P11843, titled Stormwater Improvements Progresso Village. Issued for bid in August 2024, it includes detailed sheet indexes and titles covering general information, civil demolition, storm drainage, and storm force main plans. The drawings provide location sketches, aerial maps, contaminated sites, proposed site plans, code analysis, life safety plans, and extensive storm drainage plan and profile sheets. The document is essential for understanding the technical layout and specifications for the stormwater improvements project.
PDF
PDF, High priority: read this firstrevision-drawing
HighAI Summary for P11843 Stormwater Improvements Progresso Village - Issued for Bid 10/2024: This document is a revision drawing set for the City of Fort Lauderdale project P11843, titled Stormwater Improvements Progresso Village. It is issued for bid as of October 2024. The document includes detailed engineering drawings such as site plans, storm drainage plans and profiles, paving and grading plans, civil details, structural details, architectural plans, and mechanical process plans. It also contains location sketches, aerial maps, contaminated sites maps, and various schedules and details relevant to the stormwater improvement project at Progresso Village, Fort Lauderdale, Florida.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Revision Drawing Part 2 - Skimer and Tree Disposition Plan: This document, titled 'Revision Drawing Part 2,' includes detailed specifications and notes related to the installation and construction of skimers in catchbasins, including materials, mounting hardware, and compliance standards. It also contains a tree disposition plan with a chart listing tree species, conditions, and protection notes for construction. The document provides instructions for root zone protection, tree barricading, pruning, and irrigation during construction. Additionally, a plant schedule is included, detailing quantities and types of trees, shrubs, and groundcovers to be used. The document is intended to guide construction and landscaping efforts, ensuring environmental protection and compliance with relevant standards.
PDF
PDF, Low priorityother
LowAI Summary for EPA WIFIA Borrower Guide to Federal Requirements November 2022: This document is the EPA Borrower Guide to Federal Requirements for the Water Infrastructure Financing and Innovation Act (WIFIA) program, last updated in November 2022. It serves as an informational guide for WIFIA borrowers to understand their responsibilities for complying with federal laws and regulations related to their loans. The guide includes sections on environmental authorities, economic and miscellaneous authorities, labor laws, and other federal requirements, along with appendices containing specifications and suggested contract language. It is not legally binding but provides important clarifications and updates to federal requirements applicable to WIFIA borrowers.
Response deadline changed from Dec 9, 2024 to Dec 2, 2024. NAICS code changed from 236220 to 237310. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The City of Fort Lauderdale, Florida (City) is seeking bids from qualified bidders, hereinafter referred to as the Contractor, to provide construction services for the City's Public Works Department, in accordance with the terms, conditions, and specifications contained in this Invitation To Bid (ITB). This project is located between Sunrise Blvd, NW 9th Ave, Progresso Dr, and Broward Blvd, in the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, stormwater infrastructure removal & installation, water main relocation, Cured In Place Pipe (CIPP) pipe lining, pavement restoration & installation, pump station, landscaping removal and installation, tree removal and installation, swale restoration, and Maintenance of Traffic (MOT).
More opportunities from Florida → City of Fort Lauderdale