Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Interior → Gaoa FwsView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

VA

Set-Aside

SBA

Documents

This scope was carved out of 140FGA26Q0065.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

NE-RAINWATER BSN WMD HQ GEOTHERMAL HVAC

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Gaoa Fws
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → Gaoa Fws
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Final testing, balancing, and verification of geothermal HVAC system performance to ensure efficiency and compliance.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and vertical turbine equipment, with all work adhering to SWRCB-DDW, DWR, and AWWA standards. This is a set-aside opportunity for Small Businesses and Disadvantaged Business Enterprises (DBE). The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction, while professional service fees will be negotiated with the selected firm. Award decisions are based on demonstrated competence and professional qualifications, with evaluation weights placed on relevant experience (25%), project approach (25%), scope and schedule (20%), innovation (10%), cost (10%), and proposal quality (10%). Proposals must be submitted via the PlanetBids portal by September 1, 2026. The contract is subject to federal regulations, including the Build America Buy America Act, and requires the use of the Department of Treasury ASAP payment system for all financial transactions.
Ardurra Group, Inc.

POSTED

about 13 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Department Of The Interior → Gaoa Fws

Same awarding agency

NAICS: 237990
New
Federal
Y--Boat Ramp Replacement Project at Kirwin NWR
Solicitation # 140FGA26R0023
The U.S. Fish and Wildlife Service, under the Department of the Interior, is conducting market research for the Boat Ramp Replacement Project at Kirwin National Wildlife Refuge in Kirwin, Kansas, using solicitation number 140FGA26R0023. This effort is a Sources Sought Notice, not a formal solicitation, meaning no proposals are being accepted and no contract will be awarded based on this notice. The purpose is to gather industry information to inform future procurement planning. The NAICS code is 237990, and the procurement is designated as a Total Small Business Set-Aside under FAR 19.5, restricting eligibility to small businesses only. The project requires the demolition of three deteriorated concrete boat ramps and one concrete bulkhead at each of two sites, followed by the construction of two new double-lane concrete boat ramps. Each ramp must be 20 feet wide, 6 inches thick, made of 4,000 psi concrete reinforced with #4 epoxy-coated rebar spaced 12 inches on center, and finished with a 1-inch deep non-skid V-groove textured surface angled at 30 degrees. The work includes extending two existing wave breaks by approximately 40 feet using riprap and a minimum 8 oz non-woven geotextile underlayment meeting AASHTO M288, as well as dredging accumulated sediments from ramp and maneuvering areas. All work must support AASHTO HS-20 loads, achieve 95% of maximum dry density per ASTM D1557, and comply with the Clean Water Act, OSHA, and other federal, state, and local environmental and safety regulations. Environmental protections are central to the project, requiring implementation of Best Management Practices to safeguard water quality and wildlife habitats. A perimeter turbidity curtain must be installed prior to work and inspected daily, and a dedicated washout area for concrete trucks must be constructed to prevent contamination. Fueling and equipment maintenance within 100 feet of water are prohibited unless secondary containment is provided, and any spills must be immediately contained and reported. Concrete runoff or uncured material must never enter the water. Contractors may use onsite water, sewer, and electricity only if no damage is caused, and emergency work may be required outside normal hours to prevent damage to government property. Quality control must follow industry standards and be available upon request, with all installations complying with manufacturer specifications and applicable codes including OSHA
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 1 day
View Details