Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Project Delivery Partners for Architecture Construction Projects

Closed
12359.41State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation from J&J Contractors, Inc. seeks pricing for multiple construction scopes related to the development of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the construction of a 12,920 SF multi-story steel frame laboratory and office facility, as well as an optional 17,978 SF laboratory facility. Construction elements include shallow foundations, metal standing seam roofing, masonry veneer, and metal panel siding. The scope of work encompasses a wide range of trades including demolition, abatement, concrete, structural steel, mechanical, electrical, plumbing, and extensive sitework such as stormwater retention, utilities, landscaping, and parking. For the optional facility, the project also requires the demolition of an existing engineering facility. Interested parties must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. The solicitation is set aside for various small business categories, including Small Disadvantaged, Women-Owned, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned small businesses. Bidders are instructed to contact the designated point of contact via email to receive a formal bid invitation and project documents through Building Connected. The deadline for responses is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 7 hours ago

DEADLINE

in 3 months
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
This sub-contract opportunity involves the complete renovation of bathroom facilities within two dormitory buildings at the Northlands Job Corps Center in Vergennes, Vermont. The project scope includes Building 17, which requires the renovation of four bathroom areas totaling approximately 944 square feet, and Building 18, which involves five bathroom areas totaling approximately 1,260 square feet. Work encompasses demolition and the installation of institutional-grade fixtures, including showers, toilets, vanities, flooring, and LED lighting. To ensure continuous center operations, contractors must plan to renovate the dormitories one at a time. All work must strictly adhere to ADA, OSHA, and applicable building, plumbing, and electrical codes, including the National Electrical Code and NFPA Life Safety Code. The solicitation is a firm-fixed-price order with various socioeconomic set-asides, including Small Business, Women-Owned, HUBZone, and Veteran-Owned categories. Bidders must submit a completed bid sheet, an itemized cost breakdown separating materials and labor, and a detailed project schedule. Mandatory requirements for consideration include providing current Vermont state professional licenses, proof of required insurance such as Builders Risk and Workers Compensation, and maintaining an active Sam.gov registration with a Unique Entity ID. Depending on the contract value, specific bonding requirements apply, including 100% payment and performance bonds for projects exceeding $150,000. Additionally, contractors must certify compliance with the Davis-Bacon Act regarding prevailing wage rates. Final project acceptance is contingent upon a signed punch list and the submission of all applicable warranties and guarantees.
Northlands Job Corps Center /ETR

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, involves the construction of several specialized high-explosive magazines, including six Containerized Long Weapons Storage units and three earth-covered Box G and Box H magazines. The scope of work is extensive, encompassing demolition of existing structures, site preparation involving rock excavation and grading, and the construction of new facilities such as an Ordnance Operations building, a Truck Inspection building, and a Sentry building. Key construction elements include foundations with rigid inclusions, reinforced concrete floors, grounding and lightning protection systems, intrusion detection systems, and the installation of overhead cranes. Additionally, the project requires significant site improvements, including access roads, paving, landscaping, and the establishment of primary and secondary electrical distribution systems and telecommunications infrastructure. This solicitation is managed by J & J Contractors, Inc. and is set aside for various small business categories, including Small Disadvantaged, Women-Owned, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned small businesses. The project has a scheduled duration of 1,828 calendar days, and interested parties must submit their responses by October 31, 2026. The work will impact existing wetlands, necessitating mitigation efforts. Bidders are required to contact the designated point of contact via email to receive a formal bid invitation and access the necessary project documentation. The required trades for pricing include demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, mechanical, and various other specialty construction services.
J & J Contractors, Inc

POSTED

about 7 hours ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The City and County of San Francisco Airport Commission is seeking qualified Project Delivery Partners through Solicitation No. 12359.41 to supplement its Architecture staff in delivering a portfolio of capital construction projects across the airport campus, including Terminal 1 Boarding Area C Roof and Exterior Upgrades, Rental Car Center Improvements, West Campus Fitness Center, and various Airport-Wide Office Improvement projects under the Capital Improvement Plan. The contract, classified under NAICS Code 236220, is a professional services agreement with an estimated duration of eight years, commencing tentatively in November 2026, and a total not-to-exceed value of $8,000,000. Proposers must demonstrate technical capability through a detailed Technical Proposal scored on team experience, project approach, and understanding of the Airport’s Strategic Plan and Core Values, with an additional weighted oral interview component, for a maximum possible score of 600 points. Responsiveness is evaluated through mandatory pass/fail gates requiring submission and compliance with the Statement of Minimum Qualifications, CMD Forms for Local Business Enterprise participation, Civil Rights Title VI Certification, and First Source Hiring Agreement, each signed under penalty of perjury under California law. The scope of services includes full project delivery support such as real-time data input into Primavera Unifier, development and maintenance of Level 1 and Level 2 schedules, monthly progress and cost reporting, quality assurance/quality control, on-site inspection and testing coordination, and BIM implementation, with an emphasis on sustainability, resilience, and Airport Special Systems like baggage handling and IT infrastructure. Labor rates are governed by approved ranges listed in Appendix F, with Year 1 high rates escalating by 3.5% annually over the contract term; other direct costs are reimbursable only at actual incurred amounts with no markups unless pre-approved. Contractors must comply with San Francisco’s Prevailing Wage requirements, submit certified payrolls electronically, maintain insurance including $2 million per occurrence general liability, and meet a 20% Local Business Enterprise subcontracting goal using only CMD-certified Micro-LBEs or Small-LBEs. Payment is monthly, subject to accurate, segregated, and GAAP-compliant invoicing tied to PeopleSoft IDs, with payments issued within 30 days of service or invoice receipt, whichever is later. Contractors are also required to adhere to strict recordkeeping, data integrity, public records disclosure under the California Public Records Act and San Francisco Sunshine Ordinance, non-discrimination

General Info

San Francisco Airport seeks qualified partners for capital construction projects across campus, with bids due August 4, 2026.

Agency

California → Design and Construction - Procurement and Contracts SectionView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(8)

Appendix D - Proposer Qualification Forms

PDFproposer-qualification-forms

Appendix E - Civil Rights General and Title VI Assurance Provisions and Certification

PDFcivil-rights-assurance

Contract No. 12359.41 Draft Agreement for Project Delivery Partners

PDFcontract-document

Appendix F - Approved Direct Labor Rate Ranges

PDFwage-determination

Appendix C - Statement of Minimum Qualifications

PDFstatement-of-minimum-qualifications

Appendix B - Scope of Services for Project Controls and Scheduling

PDFsow

Appendix G - First Source Hiring Agreement

PDFfirst-source-hiring-agreement

RFP 12359.41 Project Delivery Partners for Architecture Construction Projects

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Design and Construction - Procurement and Contracts Section
Contacts1 person available
OfficeSan Francisco, CA, 94128, USA
Organization / Agency
California → Design and Construction - Procurement and Contracts Section
View Agency Profile
Office AddressSan Francisco, CA, 94128, USA
Contacts

Interested Companies (22)

Show more
Marx Okubo Associates
Denver, Colorado
Glumac
Los Angeles, CA
Emily Borland Specs
San Francisco, CA

See All 22 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Airport's Design & Construction division's Architecture staff lead and manage a broad portfolio of construction projects across the Airport campus, including: the Terminal 1 Boarding Area C Roof and Exterior Upgrades, Rental Car Center Improvements, West Campus Fitness Center, Airport-Wide Office Improvement projects in the Capital Improvement Plan, as well as various renovation projects.

More opportunities from California → Design and Construction - Procurement and Contracts Section

Same awarding agency

NAICS: 238310
SLED
Noise Insulation Program (NIP), Expanded Eligibility Initiative (EEI) Phase 2024, Group 2
Solicitation # 11939.71
The Noise Insulation Program, Expanded Eligibility Initiative 2024 Phase, Group 2 project, identified as Contract No. 11939.71, is a municipal construction effort managed by the City and County of San Francisco's Design and Construction Procurement and Contracts Section. The project aims to mitigate aircraft noise impact for up to eight residential properties in San Bruno and South San Francisco through acoustical treatments. The scope of work includes window and door replacement, HVAC system installation with associated electrical work, insulation, sheetrock, finish carpentry, and painting. Technical requirements mandate compliance with SMACNA, NEC, CEC, and 2025 California Building, Energy, and Fire Codes, with specific performance standards such as ASTM E90-09 for sound transmission and ASTM E84 for fire-test-response. The contract is awarded based on a trade-off methodology using a 300-point scoring system that heavily weights safety factors, including Injury and Illness Prevention Programs and Drug and Alcohol Free Workplace Policies. Special requirements include a 50 percent hiring goal for referrals from the CityBuild Program and mandatory adherence to Local Business Enterprise (LBE) regulations for contracts exceeding 300,000 dollars. Performance is centered at San Francisco International Airport and surrounding residential sites, with the City and County of San Francisco maintaining authority over inspection and final acceptance. Bids must be submitted via the Airport's e-Procurement portal in PDF format, with specific requirements for native AutoCAD and GIS files for plans.
Drywall and Insulation Contractors

POSTED

10 days ago

DEADLINE

in 18 days
View Details