Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on October 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PROPOSED IMPROVEMENTS TO SERVE KENNEDY PLACE RURAL WORKFORCE HOUSING INITIATIVE

Closed
State & Local
Submission Closed
Solicitation #
PE-66551-NONST-2027-000000019

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Federal
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A (Contract K-27-2470-DBB-3-C) for the City of San Diego. This CASRF and EPA funded project is located in California and involves a wide range of construction and supply services, including civil works such as aggregate supply, asphalt paving, and minor concrete, as well as infrastructure needs like pipe supply, electrical work, and fencing. Support services including surveying, QC testing, and biologist services are also required. The project is subject to a Project Labor Agreement (PLA), and all subcontractors must maintain a valid California contractor's license and be registered with the California Department of Industrial Relations. This opportunity is set aside for SBA certified Women-Owned Small Business (WOSB) and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. Bids must be submitted by December 3, 2026, and remain valid for 120 days. The company reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with bond premium reimbursements capped at 3 percent. Primary contact for this solicitation is Veronica Garcia, and quotes should be submitted via email or fax.
Flatiron Dragados Constructors, Inc.

POSTED

about 1 hour ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The City of Cairo is soliciting competitive cost sealed bids for the construction of proposed improvements to serve the Kennedy Place Rural Workforce Housing Initiative in Georgia. The scope of work includes the installation of a low pressure force main system with approximately 7,268 linear feet of HDPE pipe in various sizes, 0.9 miles of urban roadway featuring grading, drainage, pavement, sidewalks, and fire lanes, and 3,024 linear feet of storm drain pipe. Additionally, the project requires the installation of approximately 5,036 linear feet of PVC water main, 70 residential water meters, fire hydrants, 160 linear feet of casing for a jack and bore under US Highway 84, and 8,448 linear feet of HDPE natural gas main, along with necessary erosion and sediment control measures. The project is funded in part by a grant from the Department of Community Affairs OneGeorgia Program. The contract allows 270 consecutive calendar days to reach substantial completion and 300 consecutive calendar days for final close-out. Bidders must be pre-qualified Georgia Department of Transportation Contractors, and all utility work must be performed by a licensed Georgia Utility Contractor. Mandatory submission requirements include a bid bond or certified cashier's check for at least 10 percent of the bid amount and a completed Affidavit of Compliance with O.C.G.A 13-10-91 regarding E-Verify. The successful bidder must provide performance and payment bonds, each for at least 10 percent of the contract amount, from a Georgia-licensed surety company listed on the Treasury Department's Circular 570. Sealed bids are due by 11:00 AM on November 6, 2026.

General Info

Cairo seeks bids for infrastructure construction for the Kennedy Place Housing Initiative.

Documents

1
PDF, High priority: read this first3 pages · ifb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

32 mandatory

32 requirements in 7 areas

  • Eligibility9 · 9 must
    008

    E-Verify Affidavit Submission

  • Submission7 · 7 must
    001

    Bid Withdrawal Restriction

  • Compliance6 · 6 must
    019

    Bid Bond Requirement

  • 29 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 32 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 6 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Cairo
Contacts1 person available
OfficeN/A

Full Description

Show more
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the Proposed Improvements to serve Kennedy Place Rural Workforce Housing Initiative as shown on the construction drawings. In general, construction consists of the installation of low pressure force main system consisting of ± 2,614 linear feet of 2" HDPE Force Main, ± 995 linear feet of 3" HDPE Force Main, ± 3,659 linear feet of 4" HDPE Force Main, ± 0.9 miles of urban roadway including grading, drainage, base and pavement, concrete sidewalk, fire lane , curb and gutter; ± 3,024 linear feet of storm drain pipe of various sizes; ± 369 liner feet of 6-inch PVC water main; ± 4,967 linear feet of 8-inch PVC water main, including associated gate valves, fittings, ± 70 residential water meters and services lines, fire hydrants; ± 160 linear feet of 16-inch casing, jack and bore under US Highway 84; ± 8,448 linear feet of 2-inch HDPE natural gas main, erosion and sediment control measures and all associated measures to complete the project according to the plans and specifications. Time allotted for completion of work is 270 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 300 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS